• 제목/요약/키워드: Scheduling Planning

검색결과 439건 처리시간 0.027초

내공생 진화알고리듬을 이용한 유연조립시스템의 공정계획과 일정계획의 통합 (The Integrated Process Planning and Scheduling in Flexible Assembly Systems using an Endosymbiotic Evolutionary Algorithm)

  • 송원섭;신경석;김여근
    • 산업공학
    • /
    • 제17권spc호
    • /
    • pp.20-27
    • /
    • 2004
  • A flexible assembly system (FAS) is a production system that assembles various parts with many constraints and manufacturing flexibilities. This paper presents a new method for efficiently solving the integrated process planning and scheduling in FAS. The two problems of FAS process planning and scheduling are tightly related with each other. However, in almost all the existing researches on FAS, the two problems have been considered separately. In this research, an endosymbiotic evolutionary algorithm is adopted as methodology in order to solve the two problems simultaneously. This paper shows how to apply an endosymbiotic evolutionary algorithm to solving the integrated problem. Some evolutionary schemes are used in the algorithm to promote population diversity and search efficiency. The experimental results are reported.

AND/OR 그래프를 이용한 공정계획과 일정계획의 통합에 관한 연구 (A Study on Integration of Process Planning and Scheduling Using AND/OR Graph)

  • 김기동;정한일;정대영;박진우
    • 대한산업공학회지
    • /
    • 제23권2호
    • /
    • pp.323-341
    • /
    • 1997
  • Traditionally, the Process Planning problems and the Scheduling problems have been considered as independent ones. However, we can take much advantages by solving the two problems simultaneously. In this paper, we deal with the enlarged problem that takes into account both the process planning and the scheduling problems. And we present a solution algorithm for the problem assuming that the given process plan data is represented by AND/OR graph. A mathematical model(mixed ILP model) whose objective is the minimization of the makespan, is formulated. We found that we can get the optimal solutions of the small-size problems within reasonable time limits, but not the large-size problems. So we devised an algorithm based on the decomposition strategy to solve the large-scale problems (realistic problems) within practical time limits.

  • PDF

An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations

  • Liu, Shi Qiang;Kozan, Erhan
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.94-102
    • /
    • 2012
  • In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning, mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.

공동주택 마감공사에서의 택트공정관리 적용에 관한 연구 (A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses)

  • 윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.422-425
    • /
    • 2003
  • 건축공사의 고층화 추세에 따라 반복공정의 수가 증가하고, 마감공사에서의 관련 공종 수가 증가하여 작업 연속성에 대한 계획 및 공사관리가 중요하게 인식되고 있으며, 이러한 마감공사의 효율적 은용을 위해 각 작업을 일정한 리듬으로 반복되도록 함에 따라 공정의 개선을 이루고자 하는 기법이 택트공정관리이다. 그러나 택트공정관리는 세부공정 및 작업구역에 따른 상이한 시공속도와 이로 인한 선행공정의 작업지연 등 비효율적 요소 때문에 적용에 어려움이 있었다. 따라서 본 연구에서는 작업별 소요시간의 동기화(同期化)를 통한 개선효과를 파악하기 위해 기존의 공동주택 창호공사를 대상으로 작업방식의 세부작업단위 및 작업인원 수를 작업시간의 동기적(同期的)연결 및 최소 요구인원 수를 기준으로 조정한 후, 공기단축 효과를 분석하였다.

  • PDF

Multiobjective Genetic Algorithm for Scheduling Problems in Manufacturing Systems

  • Gen, Mitsuo;Lin, Lin
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.310-330
    • /
    • 2012
  • Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.

공구유연성과 공구관련제약을 고려한 통합공정일정계획을 위한 유전알고리즘 (An Improved Genetic Algorithm for Integrated Planning and Scheduling Algorithm Considering Tool Flexibility and Tool Constraints)

  • 김영남;하정훈
    • 산업경영시스템학회지
    • /
    • 제40권2호
    • /
    • pp.111-120
    • /
    • 2017
  • This paper proposes an improved standard genetic algorithm (GA) of making a near optimal schedule for integrated process planning and scheduling problem (IPPS) considering tool flexibility and tool related constraints. Process planning involves the selection of operations and the allocation of resources. Scheduling, meanwhile, determines the sequence order in which operations are executed on each machine. Due to the high degree of complexity, traditionally, a sequential approach has been preferred, which determines process planning firstly and then performs scheduling independently based on the results. The two sub-problems, however, are complicatedly interrelated to each other, so the IPPS tend to solve the two problems simultaneously. Although many studies for IPPS have been conducted in the past, tool flexibility and capacity constraints are rarely considered. Various meta-heuristics, especially GA, have been applied for IPPS, but the performance is yet satisfactory. To improve solution quality against computation time in GA, we adopted three methods. First, we used a random circular queue during generation of an initial population. It can provide sufficient diversity of individuals at the beginning of GA. Second, we adopted an inferior selection to choose the parents for the crossover and mutation operations. It helps to maintain exploitation capability throughout the evolution process. Third, we employed a modification of the hybrid scheduling algorithm to decode the chromosome of the individual into a schedule, which can generate an active and non-delay schedule. The experimental results show that our proposed algorithm is superior to the current best evolutionary algorithms at most benchmark problems.

생산공급사슬에서의 아웃소싱을 고려한 공정계획 및 일정계획의 통합을 위한 모델 (A Model for Integration of Process Planning and Scheduling with Outsourcing in Manufacturing Supply Chain)

  • 정찬석;이영해;문치웅
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.512-520
    • /
    • 2000
  • An integrated process planning and scheduling model considering outsourcing in manufacturing supply chain is proposed in this paper. The process planning and scheduling considering outsourcing are actually interrelated and should be solved simultaneously. The proposed model considers the alternative process plans for job types, precedence constraints of job operations, due date of production, transportation time and production information for outsourcing. The integrated states include:(1) Operations sequencing, (2) Machine selection, (3) Scheduling with outsourcing under the due date. To solve the model, a heuristic approach based on genetic algorithm(GA) is developed. The proposed approach minimizes the makespan considering outsourcing and shows the best operation-sequences and schedule of all jobs.

  • PDF

원자력연구개발사업의 공정관리 적용 사례 연구 (A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project)

  • 한도희
    • 기술혁신학회지
    • /
    • 제2권3호
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

FMS의 생산계획 및 일정계획을 위한 의사결정을 위한 의사결정 지원시스템의 개발 (Development of an integrated decision support system for FMS production planning and scheduling problems)

  • 장성용;장병만;박진우
    • 경영과학
    • /
    • 제8권1호
    • /
    • pp.51-70
    • /
    • 1991
  • This paper discusses planning and scheduling problems for efficient utilization of an FMS and presents an integrated decision support system for FMS production planning and scheduling problems. The decision support system, FMSDS(Flexible Manufacturing Systems Decision Support System), includes of data of handling module, part selection module, loading module, load adjusting module, scheduling module and simulation module etc. This paper includes the solution methodology of each subproblem. And an integrated interface scheme between the subproblems is presented. The interface scheme considers the relationships between the subproblems and generates solution using hierarchical and looping approaches. FMSDS is made up of six alternative models considering 3 loading objectives and 2 production order processing strategies. Performance comparisons among 6 alternatives and other decision support systems are shown using the non-terminating simulation techniques.

  • PDF

Task Scheduling Algorithm for the Communication, Ocean, and Meteorological Satellite

  • Lee, Soo-Jeon;Jung, Won-Chan;Kim, Jae-Hoon
    • ETRI Journal
    • /
    • 제30권1호
    • /
    • pp.1-12
    • /
    • 2008
  • In this paper, we propose an efficient single-resource task scheduling algorithm for the Communication, Ocean, and Meteorological Satellite. Among general satellite planning functions such as constraint check, priority check, and task scheduling, this paper focuses on the task scheduling algorithm, which resolves conflict among tasks which have an exclusion relation and the same priority. The goal of the proposed task scheduling algorithm is to maximize the number of tasks that can be scheduled. The rationale of the algorithm is that a discarded task can be scheduled instead of a previously selected one depending on the expected benefit acquired by doing so. The evaluation results show that the proposed algorithm enhances the number of tasks that can be scheduled considerably.

  • PDF