1 |
Bidot, J., Vidal, T., Laborie, P., Beck, J. C. (2009), A theoretic and practical framework for scheduling in a stochastic environment, Journal of Scheduling, 12(3), 315-344.
DOI
|
2 |
Brandimarte, P. (1993), Routing and scheduling in a flexible job shop by tabu search, Annals of Operations Research, 41(3), 157-183.
DOI
|
3 |
Cheng, R., Gen, M., and Tsujimura, Y. (1996), A tutorial survey of job-shop scheduling problems using genetic algorithms. I: representation, Computers and Industrial Engineering, 30(4), 983-997.
DOI
ScienceOn
|
4 |
Cheng, R., Gen, M., and Tsujimura, Y. (1999), A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies, Computers and Industrial Engineering, 36(2), 343-364.
DOI
ScienceOn
|
5 |
Dahal, K. P., Tan, K. C., and Cowling, P. I. (2007), Evolutionary Scheduling, Springer, London, UK.
|
6 |
Dauzere-Peres, S. and Paulli, J. (1997), An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search, Annals of Operations Research, 70(1), 281-306.
DOI
|
7 |
Deb, K. (1989), Genetic algorithms in multimodal function optimization, MS Thesis, University of Alabama, Tuscaloosa, AL.
|
8 |
Deb, K. (2001), Multi-Objective Optimization Using Evolutionary Algorithms, John Wiley and Sons, New York, NY.
|
9 |
Deb, K. (2005), Optimization for Engineering Design: Algorithms and Examples, Prentice-Hall of India Private Ltd., New Delhi, India.
|
10 |
Floudas, C. A. and Lin, X. (2004), Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review, Computers and Chemical Engineering, 28(11), 2109-2129.
DOI
|
11 |
Floudas, C. A. and Lin, X. (2005), Mixed integer linear programming in process scheduling: modeling, algorithms, and applications, Annals of Operations Research, 139(1), 131-162.
DOI
|
12 |
Framinan, J. M. and Ruiz, R. (2010), Architecture of manufacturing scheduling systems: Literature review and an integrated proposal, European Journal of Operational Research, 205(2), 237-246.
DOI
|
13 |
Gao, J., Gen, M., and Sun, L. (2006), Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm, Journal of Intelligent Manufacturing, 17(4), 493-507.
DOI
|
14 |
Garey, M. R., Johnson, D. S., and Sethi, R. (1976), The complexity of flowshop and jobshop scheduling, Mathematics of Operations Research, 1(2), 117- 129.
DOI
ScienceOn
|
15 |
Gen, M., Gao, J., and Lin, L. (2009), Multistage-based genetic algorithm for flexible job-shop scheduling problem, Intelligent and Evolutionary Systems, Studies in Computational Intelligence, 187, 183-196.
DOI
|
16 |
Geiger, M. J. (2011), Decision support for multi-objective flow shop scheduling by the Pareto iterated local search methodology, Computers and Industrial Engineering, 61(3), 805-812.
DOI
|
17 |
Gen, M. and Cheng, R. (2000), Genetic Algorithms and Engineering Optimization, Wiley, New York, NY.
|
18 |
Gen, M., Cheng, R., and Lin, L. (2008), Network Models and Optimization: Multiobjective Genetic Algorithm Approach, Springer, London, UK.
|
19 |
Gen, M., Zhang, W., and Lin, L. (2009), Survey of evolutionary algorithms in advanced planning and scheduling, Journal of the Korean Institute of Industrial Engineering, 35(1), 15-39.
과학기술학회마을
|
20 |
Goncalves, J. F., de Magalhaes Mendes, J. J., and Resende, M. G. C. (2005), A hybrid genetic algorithm for the job shop scheduling problem, European Journal of Operational Research, 167(1), 77-95.
DOI
ScienceOn
|
21 |
Hwang, C. L. and Yoon, K. (1981), Multiple Attribute Decision Making: Methods and Applications, Springer, Berlin, Germany.
|
22 |
Hwang, H., Moon, S., and Gen, M. (2002), An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs, Computers and Industrial Engineering, 42(2-4), 249-258.
DOI
|
23 |
Ishibuchi, H. and Murata, T. (1998), A multi-objective genetic local search algorithm and its application to flowshop scheduling, IEEE Transactions on Systems, Man, and Cybernetics Part C, 28(3), 392-403.
DOI
ScienceOn
|
24 |
Kim, S. H. and Hwang, H. (1999), An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process, International Journal of Production Economics, 61-62, 465-472.
|
25 |
Kacem, I., Hammadi, S., and Borne, P. (2002), Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Transactions on Systems, Man, and Cybernetics Part C, 32(1), 1-13.
DOI
ScienceOn
|
26 |
Kacem, I., Hammadi, S., and Borne, P. (2002), Paretooptimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic, Mathematics and Computers in Simulation, 60(3-5), 245-276.
DOI
|
27 |
Kim, D. B. and Hwang, H. (2001), A dispatching algorithm for multiple-load AGVs using a fuzzy decision- making method in a job shop environment, Engineering Optimization, 33(5), 523-547.
DOI
|
28 |
Le-Ahn, T. and De Koster, M. B. M. (2006), A review of design and control of automated guided vehicle systems, European Journal of Operational Research, 171(1), 1-23.
DOI
|
29 |
Li, L. and Huo, J. Z. (2009), Multi-objective flexible job-shop scheduling problem in steel tubes production, Systems Engineering-Theory and Practice, 29 (8), 117-126.
|
30 |
Li, X., Gao, L., and Li, W. (2012), Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling, Expert Systems with Applications, 39(1), 288-297.
DOI
|
31 |
Li, X., Zhang, C., Gao, L., Li, W., and Shao, X. (2010), An agent-based approach for integrated process planning and scheduling, Expert Systems with Applications, 37(2), 1256-1264.
DOI
|
32 |
Pinedo, M. (2002), Scheduling: Theory, Algorithms, and Systems, Prentice-Hall, Upper Saddle, NJ.
|
33 |
Lin, L., Liang, Y., Gen, M., and Chien, C. F. (2012), A hybrid evolutionary algorithm for FMS optimization with AGV dispatching, Proceedings of the 42th International Conference on Computers and Industrial Engineering, Cape Town, South Africa.
|
34 |
Lim, J. K. (2004), Study on guide path design and path planning in automated guided vehicle system, PhD Thesis, Waseda University, Tokyo, Japan.
|
35 |
Lin, L. and Gen, M. (2008), Auto-tuning strategy for evolutionary algorithms: balancing between exploration and exploitation, Soft Computing, 13(2), 157- 168.
|
36 |
Lin, L., Hao, X. C., Gen, M., and Jo, B. J. (2012), Network modeling and evolutionary optimization for scheduling in manufacturing, Journal of Intelligent Manufacturing, 23(6), 2237-2253.
DOI
ScienceOn
|
37 |
Lopez-Ortega, O. and Moramay, R. (2005), A STEPbased manufacturing information system to share flexible manufacturing resources data, Journal of Intelligent Manufacturing, 16(3), 287-301.
DOI
ScienceOn
|
38 |
Moon, C., Kim, J. S., and Gen, M. (2004), Advanced planning and scheduling based on precedence and resource constraints for e-plant chains, International Journal of Production Research, 42(15), 2941- 2955.
DOI
ScienceOn
|
39 |
Moon, S. W. and Hwang, H. (1999), Determination of unit load sizes of AGV in multi-product multi-line assembly production systems, International Journal of Production Research, 37(15), 3565-3581.
DOI
|
40 |
Najid, N. M., Dauzere-Peres, S., and Zaidat, A. (2002), A modified simulated annealing method for flexible job shop scheduling problem, Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, Hammamet, Tunisia.
|
41 |
Proth, J. M., Sauer, N., and Xie, X. (1997), Optimization of the number of transportation devices in a flexible manufacturing system using event graphs, IEEE Transactions on Industrial Electronics, 44(3), 298-306.
DOI
|
42 |
Naso, D. and Turchiano, B. (2005), Multicriteria metaheuristics for AGV dispatching control based on computational intelligence, IEEE Transactions on Systems, Man, and Cybernetics Part B, 35(2), 208- 226.
DOI
|
43 |
Nowicki, E. and Smutnicki, C. (2005), An advanced Tabu search algorithm for the job shop problem, Journal of Scheduling, 8(2), 145-159.
DOI
ScienceOn
|
44 |
Pareto, V. (1906), Manuale di economia politica, Societa Editrice, Milano, Italy.
|
45 |
Schaffer, J. D. (1985), Multiple objective optimization with vector evaluated genetic algorithms, Proceedings of the 1st International Conference on Genetic Algorithms, Pittsburgh, PA, 93-100.
|
46 |
Shao, X., Li, X., Gao, L., and Zhang, G. (2009), Integration of process planning and scheduling: a modified genetic algorithm-based approach, Computers and Operations Research, 36(6), 2082-2096.
DOI
|
47 |
Srinivas, N. and Deb, K. (1995), Multiobjective optimiza- tion using nondominated sorting in genetic algorithms, Journal of Evolutionary Computation, 2(3), 221-248.
|
48 |
Steuer, R. E. (1986), Multiple Criteria Optimization: Theory, Computation, and Application, Wiley, New York, NY.
|
49 |
Tamaki, H., Kita, H., and Kobayashi, S. (1996), Multiobjective optimization by genetic algorithms: a review, Proceedings of IEEE International Conference on Evolutionary Computation, Nagoya, Japan, 517-522.
|
50 |
Tanev, I. T., Uozumi, T., and Morotome, Y. (2004), Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach, Applied Soft Computing, 5(1), 87-100.
DOI
|
51 |
Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P. K., and Azaron, A. (2005), A hybrid method for solving stochastic job shop scheduling problems, Applied Mathematics and Computation, 170(1), 185-206.
DOI
ScienceOn
|
52 |
Ulusoy, G., Sivrikaya-Serifoglu, F., and Bilge, U. (1997), A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles, Computers and Operations Research, 24(4), 335-351.
DOI
|
53 |
Verderame, P. M. and Floudas, C. A. (2008), Integrated operational planning and medium-term scheduling for large-scale industrial batch plants, Industrial and Engineering Chemistry Research, 47(14), 4845-4860.
DOI
ScienceOn
|
54 |
Vis, I. F. A. (2006), Survey of research in the design and control of automated guided vehicle systems, European Journal of Operational Research, 170(3), 677- 709.
DOI
|
55 |
Wang, S. J., Xi, L. F., and Zhou, B. H. (2008), FBSenhanced agent-based dynamic scheduling in FMS, Engineering Applications of Artificial Intelligence, 21(4), 644-657.
DOI
|
56 |
Wu, Z. and Weng, M. X. (2005), Multiagent scheduling method with earliness and tardiness objectives in flexible job shops, IEEE Transactions on Systems, Man, and Cybernetics Part B, 35(2), 293-301.
DOI
ScienceOn
|
57 |
Xia, W. and Wu, Z. (2005), An effective hybrid optimization approach for multi-objective flexible jobshop scheduling problems, Computers and Industrial Engineering, 48(2), 409-425.
DOI
ScienceOn
|
58 |
Zhang, W. and Gen, M. (2010), Process planning and scheduling in distributed manufacturing system using multiobjective genetic algorithm, IEEE Transactions on Electrical and Electronic Engineering, 5(1), 62-72.
DOI
|
59 |
Xiang, W. and Lee, H. P. (2008), Ant colony intelligence in multi-agent dynamic manufacturing scheduling, Engineering Applications of Artificial Intelligence, 21(1), 73-85.
DOI
|
60 |
Yang, J. B. (2001), GA-based discrete dynamic programming approach for scheduling in FMS environments, IEEE Transactions on Systems, Man, and Cybernetics Part B, 31(5), 824-835.
DOI
ScienceOn
|
61 |
Zhang, W., Lin, L., Gen, M., and Chien, C. F. (2012), Hybrid sampling strategy-based multiobjective evolutionary algorithm, Procedia Computer Science, 12, 96-101.
DOI
|
62 |
Zitzler, E. and Thiele, L. (1999), Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach, IEEE Transactions on Evolutionary Computation, 3(4), 257-271.
DOI
ScienceOn
|
63 |
Zitzler, E., Laumanns, M., and Thiele, L. (2001), SPEA2: Improving the Strength Pareto Evolutionary Algorithm, TIK-Report 103, Computer Engineering and Networks Laboratory (TIK), Zurich, Switzerland.
|
64 |
Bean, J. C. (1994), Genetic algorithms and random keys for sequencing and optimization, INFORMS Journal on Computing, 6(2), 154-160.
DOI
|
65 |
Ding, L., Yue, Y., Ahmet, K., Jackson, M., and Parkin, R. (2005), Global optimization of a feature-based process sequence using GA and ANN techniques, International Journal of Production Research, 43 (15), 3247-3272.
DOI
|
66 |
Guo, Y., Li, W., Mileham, A. R., and Owen, G. W. (2009), Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach, International Journal of Production Research, 47(14), 3775-3796.
DOI
|
67 |
Gen, M. and Zhang, H. (2006), Effective designing chromosome for optimizing advanced planning and scheduling. In: Dagli, C. H., Buczak, A. L., Enke, D. L., Embrechts, M., and Ersoy, O. (ed.), Intelligent Engineering Systems through Artificial Neural Network, ASME Press, New York, NY, 61-66.
|
68 |
Gen, M., Lin, L., and Zhang, H. (2009), Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-the-art-survey, Computers and Industrial Engineering, 56(3), 779-808.
DOI
|
69 |
Guo, Y. W., Li, W. D., Mileham, A. R., and Owen, G. W. (2009), Applications of particle swarm optimisation in integrated process planning and scheduling, Robotics and Computer-Integrated Manufacturing, 25(2), 280-288.
DOI
|
70 |
Kim, Y. K., Kim, J. Y., and Shin, K. S. (2007), An asymmetric multileveled symbiotic evolutionary algorithm for integrated FMS scheduling, Journal of Intelligent Manufacturing, 18(6), 631-645.
DOI
|
71 |
Lee, C. Y. and Chen, Z. L. (2001), Machine scheduling with transportation considerations, Journal of Scheduling, 4(1), 3-24.
DOI
ScienceOn
|
72 |
Li, W. D. and McMahon, C. A. (2007), A simulated annealing-based optimization approach for integrated process planning and scheduling, International Journal of Computer Integrated Manufacturing, 20(1), 80-95.
DOI
|
73 |
Moon, C. and Seo, Y. (2005), Evolutionary algorithm for advanced process planning and scheduling in a multi-plant, Computers and Industrial Engineering, 48(2), 311-325.
DOI
ScienceOn
|
74 |
Zhang, F., Zhang, Y. F., and Nee, A. Y. C. (1997), Using genetic algorithms in process planning for job shop machining, IEEE Transactions on Evolutionary Computation, 1(4), 278-289.
DOI
|
75 |
Qui, L., Hsu, W. J., Huang, S. Y., and Wang, H. (2002), Scheduling and routing algorithms for AGVs: a survey, International Journal of Production Research, 40(3), 745-760.
DOI
|