1 |
Baker, K. R. (1974), Introduction to sequencing and scheduling: John Wiley and Sons, Inc.
|
2 |
Kumral, M. and Dowd, P. A. (2005), A simulated annealing approach to mine production scheduling, Journal of the Operational Research Society, 56, 922-930.
DOI
ScienceOn
|
3 |
Lerchs, H. and Grossmann, I. F. (1965), Optimum design of open-pit mines, Transactions on CIM, LX VIII, 17-24.
|
4 |
Myburgh, C. and Deb, K. (2010), Evolutionary algorithms in large-scale open pit mine scheduling, GECCO'10, Portland, Oregon, USA.
|
5 |
Ramazan, S. (2007), The new fundamental tree algorithm for production scheduling of open pit mines, European Journal of Operational Research, 177, 1153-1166.
DOI
ScienceOn
|
6 |
Souza, M. J. F., Coelho, I. M., Ribas, S., Santos, H. G., and Merschmann, L. H. C. (2010), A hybrid heuristic algorithm for the open-pit-mining operational planning problem, European Journal of Operational Research, 207, 1041-1051.
DOI
ScienceOn
|
7 |
Sundar, D. K. and Acharya, D. (1995), Blast schedule planning and shift wise production scheduling of an opencast iron ore mine, Computers and Industrial Engineering, 28(4), 927-935.
DOI
ScienceOn
|
8 |
Tolwinski, B. and Underwood, R. (1996), A scheduling algorithm for open pit mines, IMA Journal of Mathematics Applied in Business and Industry, 7, 247-270.
|
9 |
Topal, E. and Ramazan, S. (2010), A new MIP model for mine equipment scheduling by minimizing maintenance cost, European Journal of Operational Research, doi: 10.1016/j.ejor.2010.05.037.
DOI
|
10 |
Underwood, R. and Tolwinski, B. (1998), A mathematical programming viewpoint for solving the ultimate pit problem, European Journal of Operational Research, 107(1), 96-107.
DOI
ScienceOn
|
11 |
Bley, A., Boland, N., Fricke, C., and Froyland, G. (2010), A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Computers and Operations Research, 37, 1641-1647.
DOI
ScienceOn
|
12 |
Boland, N., Dumitrescu, I., Froyland, G., and Gleixner, A. M. (2009), LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, Computers and Operations Research, 36, 1064-1089.
DOI
ScienceOn
|
13 |
Caccetta, L. and Giannini, L. M. (1988), An application of discrete mathematics in the design of an open pit mine, Discrete Applied Mathematics, 21, 1-19.
DOI
ScienceOn
|
14 |
Caccetta, L. and Hill, S. P. (2003), An application of branch and cut to open pit mine scheduling, Journal of Global Optimisation, 27, 349-365.
DOI
ScienceOn
|
15 |
Caccetta, L., Giannini, L. M., and Kelsey, P. (1994), On the implementation of exact optimisation techniques for open pit design, Asia-Pacific Journal of Operational Research, 11, 155-170.
|
16 |
Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., and Rubio, E. (2009), A new algorithm for the open-pit mine scheduling problem: Working paper, University Blaise Pascal, Clermont-Ferrand, France.
|
17 |
Choi, Y., Park, H., Sunwoo, C., and Clarke, K. C. (2009), Multi-criteria evaluation and least-cost path analysis for optimal haulage routing of dump trucks in large scale open-pit mines, International Journal of Geographical Information Science, 23(12), 1541-1567.
DOI
ScienceOn
|
18 |
Cullenbine, C., Wood, R. K., and Newman, A. (2011), A sliding time window heuristic for open pit mine block sequencing, Optimisation Letters, doi: 10.1007/s11590-011-0306-2.
DOI
|
19 |
Hochbaum, D. S. and Chen, A. (2000), Performance analysis and best implementations of old and new algorithms for the open-pit mining problem, Operations Research, 48(6), 894-914.
DOI
ScienceOn
|
20 |
Kozan, E. and Liu S. Q. (2011), Operations Research for Mining: A Classification and Literature Review, ASOR Bulletin, 30(1), 2-23.
|