Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction (공동주택 마감공사의 기존 Tact와 복합병행 Tact 비교분석 - 공동주택 미장공사 중심으로 -)

  • Hwang, SuHyeon;Sim, JeaHyung;Ham, NamHyuk;Kim, JaeJun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.47-56
    • /
    • 2022
  • In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Influence of the Structural Framework on the Critical Path of Finish Works in Winter Season -Focusing on Case Study of High-rise Apartment Housing- (동절기 골조공사 시행이 마감공사의 주공정선에 미치는 영향 -아파트 공사의 사례분석을 중심으로-)

  • Han, Choong-Hee;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.148-158
    • /
    • 2006
  • Public construction companies have strictly followed a rule that they should not do the works using water such as concrete pouring for the structural frame for a certain period during the winter season. It is usually known that the designated non-working period during the winter causes increase of the project duration and the project cost escalation. The halted work also makes negative effects on national economy because it reduces worker's income. However, the situation would be a lot better if the work for the structural frame is allowed under some conditions. The structural framework done alone without being followed by finish works gives a lot of stresses on the finish works. In this sense, this study examines how the structural framework performed during the winter season affect on the critical path of the finish works. To accomplish the objective of this research, the subnet for the finish works as well as a master network are prepared along with critical paths for a virtual construction site. Using the prepared networks, simulations are carried out to see the effects described above. This study is expected to be used in estimating the construction duration of high-rise apartment housing when the site work for the structural frame should be performed during this period.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF

A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로)

  • Lee, Chi-Joo;Kim, Jae-Joon;Lee, Yoon-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.132-140
    • /
    • 2007
  • There is an increase in interest and investment in high-rise housing as it is perceived to be a new value-added market in the construction industry. In constructing a high-rise housing, the finishing works are executed in accompaniment with many other activities that are progressed repeatedly and spontaneously on each floor. It was reported that the duration of finishing works differs according to the management ability of the executing company and has a significant effect on the entire project duration. We suggest a need to concentrate on important management factors by analyzing the factors affecting the productivity of finishing works based on the site characteristics in high-rise housing. There are various complex productivity-affecting factors including the technical factors involved in planning and managing the processes of finishing works. From the viewpoint of planning and management factors, the importance of productivity-affecting factors was analyzed using the Analytic Hierarchy Process (AHP). A continuous examination of the management of high-importance factors will make it possible to improve productivity by enhancing the understanding of productivity-affecting factors of finishing works and suggesting a practical management direction.