TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique  

Kim, Seon-Gyoo (Department of Architectural Engineering, Kangwon National University)
Yoo, Jae-Woo (Department of Architectural Engineering, Kangwon National University)
Kim, Dong-Sub (Department of Architectural Engineering, Kangwon National University)
Park, Jong-Il (Department of Architectural Engineering, Kangwon National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.2, 2014 , pp. 3-11 More about this Journal
Abstract
As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.
Keywords
CPM; TACT; PDM; BDM; Apartment Finish Works;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Kim, S. G., Ko, D. G., Lee, Y. H., K, Kweon, I. J. (2012), "Method of Transforming PDM's Overlapping Relationships to BDM;s Relationships", Korean journal of Construction Enginnering and Management, pp. 181-182.
2 Kim, S. G. (2012), "CPM Schedule Summarizing Function of the Beeline Diagramming Method", Journal of Asian Architecture and Building Engineering, November, 11(2), pp. 367-374.   DOI   ScienceOn
3 Kim, S. G. (2010), Advenced Construction Management, Kimoondang.
4 Kim, S. G., Lee, Y. H., Noh, S. B., Ko, D. G. (2011), "The Concept of Schedule and Cost Progress Integrated Management on the BDM Network", Korean journal of Construction Engineering and Management, KICEM, 12(6) pp. 54-64.   과학기술학회마을   DOI   ScienceOn
5 Noh, S. B., Lee, Y. H., Yoo, Y. J., Kim, S. G. (2012), "Schedule Computation Method of Two-way Multiple Relationships on the BDM Network" Korean journal of Construction Enginnering and Management, pp. 179-180.
6 Park, S. C. (2010), "P3 vs Primavera P6". Korean journal of Construction Engineering and Management, KICEM, 11(4) pp. 37-39.
7 Shin, D. H., Park, H. S., Koo, K. J., Yoon, S. H. (2010), "Application Plan of TACT Process for Finish Works in Apartment Housing Projects", Korean journal of Architectural Institute of Korea. 26(1) pp. 129-136.   과학기술학회마을
8 Yoon, Y. S., Suh, S. W (2005), "The application of tact time at finish work for building construction- Focused on Office Building", Korean journal of Construction Enginnering and Management, 6(6) pp.90-97.   과학기술학회마을