1 |
Kim, S. G., Ko, D. G., Lee, Y. H., K, Kweon, I. J. (2012), "Method of Transforming PDM's Overlapping Relationships to BDM;s Relationships", Korean journal of Construction Enginnering and Management, pp. 181-182.
|
2 |
Kim, S. G. (2012), "CPM Schedule Summarizing Function of the Beeline Diagramming Method", Journal of Asian Architecture and Building Engineering, November, 11(2), pp. 367-374.
DOI
ScienceOn
|
3 |
Kim, S. G. (2010), Advenced Construction Management, Kimoondang.
|
4 |
Kim, S. G., Lee, Y. H., Noh, S. B., Ko, D. G. (2011), "The Concept of Schedule and Cost Progress Integrated Management on the BDM Network", Korean journal of Construction Engineering and Management, KICEM, 12(6) pp. 54-64.
과학기술학회마을
DOI
ScienceOn
|
5 |
Noh, S. B., Lee, Y. H., Yoo, Y. J., Kim, S. G. (2012), "Schedule Computation Method of Two-way Multiple Relationships on the BDM Network" Korean journal of Construction Enginnering and Management, pp. 179-180.
|
6 |
Park, S. C. (2010), "P3 vs Primavera P6". Korean journal of Construction Engineering and Management, KICEM, 11(4) pp. 37-39.
|
7 |
Shin, D. H., Park, H. S., Koo, K. J., Yoon, S. H. (2010), "Application Plan of TACT Process for Finish Works in Apartment Housing Projects", Korean journal of Architectural Institute of Korea. 26(1) pp. 129-136.
과학기술학회마을
|
8 |
Yoon, Y. S., Suh, S. W (2005), "The application of tact time at finish work for building construction- Focused on Office Building", Korean journal of Construction Enginnering and Management, 6(6) pp.90-97.
과학기술학회마을
|