Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction |
Hwang, SuHyeon
(Department of Architectural Engineering, Hanyang University)
Sim, JeaHyung (Department of Architectural Engineering, Hanyang University) Ham, NamHyuk (Department of Digital Architectural and Urban Engineering, Hanyang Cyber University) Kim, JaeJun (Department of Architectural Engineering, Hanyang University) |
1 | Yoon, Y.S., and Suh, S.W. (2003). "A Study on the Application of Tact Planning & Scheduling in Finish Work of Apartment Houses." Journal of the Korea Institute of Construction Engineering and Management Conference, pp. 422-425. |
2 | Keskiniva, K., Saari, A., and Junnonen, J.M. (2020). "Takt planning in apartment building renovation projects. Buildings." Journal of the Buildings, 10(12), p. 226. DOI |
3 | Kim, B.S. (2012). "Tact Process Reengineering for Improving the Usability in Construction Sites." MS Thesis, Chungbuk University. |
4 | Kim, S.K., Son, K.Y., Joo, J.K., Lee, D.H., and Lee, S.H. (2011). "An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings." Journal of the Korea Institute of Building Construction, 11(4), pp. 396-406. DOI |
5 | Kim, S.H., Yeom, D.J., Shin, N.R., Seo, H.M., and Kim, Y.S. (2016). "A Non-working Period Estimation Model Reflecting the Characteristics of the Construction Trades." Journal of the Architectural Institute of Korea Structure & Construction, 32(2), pp. 41-50. DOI |
6 | Kim, S.T. (2012). "Current Status of Using D-Tact." Journal of the Korea Institute of Construction Engineering and Management, 13(5), pp. 40-44. |
7 | Lee, J.S. (2001). "Analyzing Method of Schedule Delay Using Bar Chart in Construction." Journal of the Architectural Institute of Korea Structure & Construction, 17(1), pp. 121-128. |
8 | Kim, J.H., Yoon, Y.S., Jang, M.H., and Suh, S.W. (2007). "Work flow-based Tact Planning & Scheduling Process: Focused on the Finish Work of Apartment Building." Journal of the Architectural Institute of Korea Structure & Construction, 23(6), pp. 153-162. |
9 | Baek, T.Y. (2017). "Process Planning for Finishing Works of High-rise Residential Buildings Project." Journal of the Korea Academia-Industrialcooperation Society, 18(11), pp. 110-117. |
10 | Byun, H.B. (2015). "Deriving Problems of a Domestic Schedule Management and Solution by BDM Technique." MS Thesis, Kangwon National University. |
11 | Jeon, M.C., Woo, J.J.O., Yoon, D.E., and Kim, D.Y. (2015). "A Study on the Main Factors for Improving Tact Process Management." Journal of the Korean Society of Civil Engineers, pp. 27-28. DOI |
12 | Joo, S.U., Park, M,S., Lee, H.S., and Lee, K.P. (2015). "Tact Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR)." Journal of Construction Engineering and Management, 16(3), pp. 36-48. |
13 | Park, Y.N., Lee, D.D., and Kim, J.J. (2019). "A Study on the Task Variation and Social Network Analysis in the Construction Process." Journal of the Korea Institute of Construction Engineering and Management, 20(1), pp. 105-113. |
14 | Hwang, J.W. (2009). "Business Process Model for Applying Tact Methodology to Finish Work in Apartment House." MS Thesis, Soonsil University. |
15 | Lee, S.R., Lee, H.S., Park, M.S., and Roh, S. (2007). "A Study on Ideal Scheduling Method for High-rise Building Finishing Work." Journal of the Architectural Institute of Korea Structure & Construction, 27(1), pp. 793-796. |
16 | Lee, W.S. (2011). "The Application of the Tact Method for Finish Works of Apartment Buildings." MS Thesis, Kyung Hee University. |
17 | Sim, J.H. (2017). "Reengineering of Tact Process Management for Finishing Work in Apartment Construction Project." MS Thesis, Hanyang University. |
18 | Jeon, M.C., and Kim, D.Y. (2016). "Improving the process of finishing work according to the size of construction companies." Journal of the Korean housing association, 14(1), pp. 195-204. |
19 | Vatne, M.E., and Drevland, F. (2016). "Practical Benefits of Using Takt time planning: A case study." In Proceedings of the 24th Annual Conference of the International Group for Lean Construction (IGLC 24), Boston, MA, USA, (173), pp. 173-182. |
20 | Lee, J. (2001). "A Work Interference Management Model for Apartment Building Finish Works." MS Thesis, Chung-Ang University. |
21 | Lee, S.H., Lee, S.H., Kim, J.H., and Kim, J.J. (2010). "Delay Factors Based on the Importance of Finish Work in Apartment Construction Project." Journal of the Proceedings of the Korean Institute of Building Construction Conference, pp. 125-129. |
22 | Lee, S.H., Kim, Y.M., Kim, J.H., and Kim, J.J. (2011). "Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works." Journal of the Korea Institute of Building Construction, 11(1), pp. 73-81. DOI |
23 | Kim, S.G., Byun, H.B., Kim, J.H., and Jung, W. (2014). "Integration of LOB and Tact Techniques by BDM Technique." Journal of the Architectural Institute of Korea Structure & Construction, 30(9), pp. 61-68. DOI |
24 | Shin, D.H., Park, H.S., Yun, S.H., and Koo, K.J. (2010). "Application plan of Tact process for finish works in apartment housing projects." Journal of Architectural Institute of Korea, 26(1), pp. 129-136. |