Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.