Browse > Article
http://dx.doi.org/10.6106/KJCEM.2021.22.6.107

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing  

Bang, Seongbae (Department of Architectural Engineering, Graduate School, Incheon National University)
Jang, JunYoung (Department of Architectural Engineering, Graduate School, Incheon National University)
Koo, Choongwan (Division of Architecture and Urban Design, Incheon National University)
Kim, Taewan (Division of Architecture and Urban Design, Incheon National University)
Lee, Chansik (Division of Architecture and Urban Design, Incheon National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.6, 2021 , pp. 107-119 More about this Journal
Abstract
Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.
Keywords
Construction Period Calculation Model; Underground Parking lot Remodeling; Parking lot Expansion; Standard Construction Period;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Whang, K.J. (2008). "A Decision Making Model for Selection Method of Parking Lot Expansion for the Aged Apartment Complex." Ph-D thesis, Incheon National Univ., Incheon.
2 Han, T.H. (2015). "Evaluating the efficiency and feasibility of parking lot expansion types for remodeling of deteriorated apartment." MS thesis, Seoul National Univ., Seoul.
3 Kim, D.J., Park, C.K., and Kim, H.J. (2012). "A Study on the Expansion for the Parking Lots in Deteriorated Apartments." Journal of the Architectural Institute of Korea Planning & Design, JAIK-PD, 28(2), pp. 159-167.   DOI
4 Korea Land & Housing Corporation. (2007).
5 Jung, S.J., Kim, J.H., Lee, B.H., Hwang, K.S., and Seo, S.Y. (2018). "Establishment of a Technology for Earthwork Safety at New Construction/Extension of Underground Parking Lot in Building." Proceedings of the 2018 KCI Conference, Pyeongchang, KOREA.
6 An, S.H., and Kang, K.I. (2005). "A Study on the Cost Model of Underground Parking Lot of Apartment Housing Projects in the Early Stage." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 21(5), pp. 135-142.
7 Choi, J.W., Jeong, E.B., Park, S.P., Kim, T.W., and Lee, C.S. (2019). "Development of Expansion Work Breakdown Structure for Underground Parking Lots in Aged Apartment Housing." Proceedings of the 2019 AIK Conference, Daejeon, KOREA.
8 Customized Remodeling Item for Aged Apartment (2013). Korea Land and Housing Corporation, LH Research Report, 2013-10.
9 Kim, I.G., Kim, H.I., and Lee, S.H. (2009). "A Study on the Factors and Elements Effecting Parking Area Expansion Plans in Apartment Complexes Remodeling." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 25(6), pp. 51-58.
10 Kim, K.R. (2002). Modern Architecture Process Management Studies; Gimundang, Korea, pp. 1-256.
11 Park, S.P., Youn, B.H., Choi, J.W., Kim, T.W., and Lee, C.S. (2018). "Development of Technology Tree for Method of Entry to Expand the Underground Parking Lot of the Apartment." Proceedings of the 2018 KICEM Conference, Seoul, KOREA.
12 Lee, J.S., and Bing, C.M. (2012). "Cheongdam Cheonggu Apartment Remodeling Construction." Journal of the Korea Institute of Building Construction, JKIBC, 12(6), pp. 42-51.   DOI
13 Lee, K. (2016). "Remodeling and cost." Korea Remodeling Association, pp. 49-51.
14 Park, J.G., and Lee, C.S. (2008). "Preliminary Checklist For Vertical Extension of Elevator in Apartment Buildings." Proceedings of the 2008 KICEM Conference, Seoul, KOREA.
15 Song, N.H., Jung, I.S., and Lee, C.S. (2009). "The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot." Korean Journal of Construction Engineering and Management, KICEM, 10(2), pp. 65-74.
16 Whang, K.J., and Lee, C.S. (2007). "The Development of Procedure Model for Selecting the Method of Parking Lot Expansion in Apartment Complex." Journal of the Architectural Institute of Korea Structure & Construction, JAIK-SC, 23(2), pp. 151-160.
17 Yoon, B.H., Choi, J.W., Park, S.P., Kim, T.W., and Lee, C.S. (2019). "A Study on the Functional Analysis of Parking Lot Expansion Technology using Technology-Tree." Korean Journal of Construction Engineering and Management, KICEM, 120(3), pp. 64-76.
18 Yu, Y.S., and Lee, C.S. (2017). "The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique." Korean Journal of Construction Engineering and Management, KICEM, 18(3), pp. 52-62.   DOI
19 Kim, J. (2018). "Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements." MS thesis, Ajou Univ., Kyonggi.
20 Choi, J.P., Park, Y.S., Ryu, J.W., and Choi, Y.J. (2008). "Case Study of Apartment Remodeling by Occupant's Questionnaire Survey." Journal of the Architectural Institute of Korea Planning & Design, JAIK-PD, 24(5), pp. 31-40.
21 Yoon, B.H. (2019). "Development of the Planning Procedure Model for the Remodeling of the Parking Lot in the Aged Apartment Complex." MS thesis, Incheon National Univ., Incheon.
22 Lee, E.J., Hyun, C.H., and Hyun, C.G. (2010). "A Case Study on the Safety Diagnosis of Daechi hyundai Apartment Remodeling." Journal of the Korea Institute for Structural Maintenance and Inspection, KSMI, 14(5), pp. 35-41.
23 Park, J.G. (2009). "Development of Checklist for Expansion of Parking Lot in Aged Apartment." MS thesis, Incheon National Univ., Incheon.
24 Shin, M.H. (2017). "Selection of the Aged Apartment Parking Lot Expansion Types Considering Economic Feasibility." MS thesis, Incheon National Univ., Incheon.
25 Song, N.H. (2009). "The Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot." MS thesis, Incheon National Univ., Incheon.
26 Han, T.H., and Choi, M.J. (2014). "A Study on the Types and Performance of Parking Space Expansion through Remodeling of Deteriorated Apartment." Proceedings of the 2014 KAHPS Conference, Seoul, KOREA.
27 Xing Su, Abdul rahman Andoh, Hubo Cai, Jing Pan, Amr Kandil, and Hisham M. Said. (2012). "Gis-based dynamic construction site material layout evaluation for building renovation projects." Automation in construction, 27, pp. 40-49.   DOI
28 Kim, J., and Cha, H.S. (2018). "Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements." Korean Journal of Construction Engineering and Management, KICEM, 19(6), pp. 65-78.   DOI