1 |
Ultra Construction, Tunnel Boring Machine Method. 1993. 5, pp 1-40
|
2 |
Kim BS, Jean JG, A Study on Estimation Model of Construction Duration for Public Construction, Korean Journal of Construction Engineering and Management, Volume 6, No. 6, 2005, 12, pp 11-16
|
3 |
Lee, YI. Case Law on the TBM Tunnel Excavation, Korea Journal of the Tunnel, 1997. 2, pp 1-8
|
4 |
Lee YS, Lee DY, Park CS, A Case Study on the Efficiency of Construction Durations and Activities Based on Resource, Korean Journal of Construction Engineering and Management Conference, 2009. 11, pp 32-43
|
5 |
Lee JS, Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension, Korean Journal of Construction Engineering and Management Conference, 2012. 11, pp 33-44
|
6 |
Mun Seong Woo, Park Sang Cheon, Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model, Korean Journal of Construction Engineering and Management Conference Volume 10, No. 2 (Serial No. 48) 2009. 3 pp.26-33
|
7 |
Park, HT, Soung, YS, A Study on Efficiency Improvement through Productivity Analysis Based on TBM Operation Data, Journal of the Society of Civil Engineers, 2010. 4, pp 55-60
|