References
- Czarnigowska, A., and Sobotka, A. (2014). "Estimating construction duration for public roads during the preplanning phase" Journal of Engineering Projec, and Production Management, 4(1), p. 26.
- Hammad, A. A. A., Ali, S. M. A., Sweis, G. J., and Bashir, A. (2008). "Prediction model for construction cost and duration in Jordan" Jordan Journal of Civil Engineering, 2(3).
- Hoffman, G. J., Thal Jr, A. E., Webb, T. S., and Weir, J. D. (2007). "Estimating performance time for construction projects" Journal of Management in Engineering, ASCE, 23(4), pp. 193-199. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(193)
- Jin, R., Han, S., Hyun, C., and Cha, Y. (2015). "Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects" Journal of Construction Engineering and Management, ASCE, 142(2), 04015082. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001072
- Jung, I. S., Hwang, J. H., Park, J. S., and Lee, C. S. (2000). "Predictive Model for the Estimation of Net Working Days in the Military Facility Construction" Journal of the Architectural Institute of Korea, 16(9), pp. 67-74.
- Jung, Y. S. (2008). "Automated Front-End Planning for Cost and Schedule: Variables for Theory and Implementation" Proceedings of the 2008 Architectural Engineering National Conference, ASCE, Denver, USA.
- Jung, Y. S., and Kang, S. H. (2007). "Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control" Journal of Construction Engineering and Management, ASCE, 133(1), pp. 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
- Jung, Y. S., Lee, Y. S., and Woo, S. K. (2009). "Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study" Proceedings of Construction Research Congress 2009, ASCE, Seattle, USE, pp. 816-825.
- Kim, K. J., Cho, J. Y., Lee, D. Y., and Lee, M. J. (2016 ). "Development of an automated As-planned schedule system for efficient scheduling" KSCE Journal of Civil Engineering, 20(4), pp. 1131-1137. https://doi.org/10.1007/s12205-015-0234-2
- Kim, K. J., Yun, W. G., and Kim, I. K. (2016). "Estimating approximate construction duration of CFRD in the planning stage" KSCE Journal of Civil Engineering, pp. 1-10.
- Kim, S. J., and Lee, J. S. (2004). "An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration" Korean Journal of Construction Engineering and Management, KICEM, 5(6), pp. 72-79.
- Koo, H. S., and Choi, B. C. (1999). "A Study on the Estimation of Construction Period Considering Weather Factor in Building Construction" Journal of the Architectural Institute of Korea, 15(11), pp. 87-96.
- Kwon, D. C., and Lee, C. S. (2004). "The Estimation of Construction Duration for High School Buildings Based on the Actual Data" Korean Journal of Construction Engineering and Management, KICEM, 5(6), pp. 138-145.
- Lee, B. S., Kim, K. N., and Lee, M. J. (2015). "A Study on Normal Project Duration for Water Resource Project" Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 35-43. https://doi.org/10.6106/KJCEM.2015.16.1.035
- Lee, S. B. (2001). "A Study on the Optimal Duration Estimating Method by Line of Balance" Journal of the Architectural Institute of Korea, 17(9), pp. 233-240.
- Lin, M., Tserng, H. P., Ho, S., and Young, D. (2011). "Developing a construction-duration model based on a historical dataset for building project" Journal of Civil Engineering and Management, 17(4), pp. 529-539. https://doi.org/10.3846/13923730.2011.625641
- Martin, J., Burrows, T. K., and Pegg, I. (2006). "Predicting construction duration of building projects" XXIII Congreso FIG.
- Shin, J. H., and Lee, C. S. (1996). "Estimating method for Construction Duration in the Frame Work of Reinforced Concrete Wall-Slab Type Apartments" Journal of the Architectural Institute of Korea, 12(7), pp. 349-364.
- Stoy, C., Pollalis, S., and Schalcher, H. (2007). "Early estimation of building construction speed in Germany" International Journal of Project Management, 25(3), pp. 283-289. https://doi.org/10.1016/j.ijproman.2006.11.010