A Study on Estimating Normal Project Duration of Apartment Remodeling Project  

Yoon, Jongsik (Department of Architectural Engineering, Graduate School of Ajou University)
Yu, Ilhan (Korea Research Institute for Construction Policy)
Publication Information
Korean Journal of Construction Engineering and Management / v.18, no.2, 2017 , pp. 12-20 More about this Journal
Abstract
The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.
Keywords
Remodeling; Normal Project Duration; Rough Estimation;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Cho, M. R. et al. (2000). "A Study on the Remodeling Method of Apartment housing" Ministry of Land, Infrastructure and Transport, p. 1.
2 Hwang, H. S. (2002). "Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction" Korean Journal of Construction Engineering and Management, KICEM, 3(3), pp. 84-93.
3 Kim, K. R., Yoon, Y. H. and Kim, C. H. (2016). "Improvement in the Business Process Model for the Aged Apartment Remodeling Project" Korean Journal of Construction Engineering and Management, KICEM, 17(5), pp. 45-53.   DOI
4 Korea Agency for Infrastructure Technology Advancement (2016). Developing & Verifying the Cost Saving and Highly Efficient Remodeling Technologies of Vertical Extension for the Aged Multi-Family Housing, Research report, 2016-04.
5 Kwon, D. C. and Lee, C. S. (2004). "The Estimation of Construction Duration for High School Buildings Based on the Actual Data" Korean Journal of Construction Engineering and management, KICEM, 5(6), pp. 138-145.
6 Lee, B. S., Kim, G. N. and Lee, M. J. (2015). "A Study on Normal Project Duration for Water Resource Project" Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 35-43.   DOI
7 Lee, S. B. (2001). "A Study on the Optimal Duration Estimating Method by Line of Balance"Journal of the Regional Association of Architectural Institute of Korea, 17(9), pp. 233-240.
8 Ministry of Land, Infrastructure and Transport (2015). A study on the Method of Estimating the Construction Duration for Apartment to Assure Quality, Research report.
9 Proverbs, D., Holt, G., and Olomolaiye, P. (1999). "Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK" German and French contractors. Construction Management & Economics, 17(1), pp. 45-52.   DOI