• Title/Summary/Keyword: overhead catenary system

Search Result 71, Processing Time 0.025 seconds

A Development of Detail Design Software for Conventional Catenary System (기존선 전차선로 상세설계 소프트웨어 개발)

  • Lee, Ki-Won;Kwon, Sam-Young;Cho, YongHyeon;Lee, Tae-Kwon;Lee, Kyung-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.481-488
    • /
    • 2008
  • A detail design of overhead catenary system can be divided into a pegging plan and a design of MD(mounting diagram). In the pegging plan, the mast location, staggering and tension length are determined in the longitudinal point of view according to track condition, location of substation and etc. In the MD, a transversal diagram including masts, all of wires, cantilever, foundation and etc. and materials used are shown. This study presents a development of a software to design the MD for a conventional catenary system automatically. In the program, thin walled steel pole, foundation, cantilever, all of wires and etc. are automatically drawn according to the input and catenary conditions. And materials used in the MD and the section can be also managed respectively in the program. This application of the program is developed using C# for input/calculating and using C++(ObjectARX) for drafting the MD, respectively.

  • PDF

Measurement techmology analysis for current ratio characteristic assessment of catenary (전차선로 전류비 특성평가 측정 기술 분석)

  • Oh, Seok-Yong;Park, Young;Cho, Yong-Hyeon;Lee, Ki-Won;Kwon, Sam-Young;Kim, Hyung-Chul;Song, Joon-Tae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1918-1923
    • /
    • 2010
  • In electic railway, 25kV is applied to AC sections of overhead contact lines and pantographs of Korea Train eXpress(KTX) make contact at speeds of 300km/h. Thus, there is a need to utilize wireless, optic, contact-less sensors to implement condition monitoring systems. This paper is based on describing and analyzing the condition monitoring system implementation technologies for efficient catenary current ratio characteristic assessment. The conclusion of this paper should be widely applied to design, diagnosis, completion of construction, current collection status, fault diagnosis, and selection of contact wires and suspension wires.

  • PDF

Prediction of the force on the dropper according to the pre-sag (사전이도 적용에 따른 드로퍼에 작용하는 하중 예측)

  • Lee, Ki-Won;Cho, Hyeon-Young;Chang, Sang-Hoon;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.972-977
    • /
    • 2009
  • For the improvement of a train speed in the conventional line from overhead system point of view, it is necessary to approach not only in the aspect of the increasement of tension for catenary but the application of a pre-sag. A certain tension acting on a dropper is removed when it is slack by the pantograph passing. Right after the pantograph passes, the dynamic force caused by the mass of contact wire acts on the dropper. If the pre-sag is applied to the catenary, the static force on the dropper is increased. For the assurance of the safety for the dropper, it is necessary to predict the dynamic force. The purpose of this study is to predict and analyze the force on the dropper according to the applied pre-sag.

  • PDF

A Study on the Protection Wire Type Decision of Catenary System in the 350km/h High Speed Line (350km/h급 고속전차선로 보호선의 선종결정 기법에 관한 연구)

  • Lee, Hack-Pyo;Seo, Ki-Bum;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1818-1823
    • /
    • 2015
  • In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.

Technique on the speed up of neutral section in the catenary system (절연구분장치의 속도향상 기술)

  • Chang, Sang-Hoon;Park, Byung-Soo;Kim, Young-Gon
    • Proceedings of the KIEE Conference
    • /
    • 2005.05b
    • /
    • pp.71-74
    • /
    • 2005
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

Technique for the Speed Up of Neutral Section on the Convention Line Catenary System (기존선 교류전기철도 절연구분장치에서의 속도향상 기술)

  • Chang, Sang-Hoon;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.294-301
    • /
    • 2008
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. Except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

Development of Numerical Analysis Model to Estimate the Contact Force between the Pantograph and Catenary of a High-speed Train (고속 철도 차량용 판토그래프와 가선계의 접촉력 예측을 위한 수치 해석 모델 개발)

  • Jung, Sung-Pil;Park, Tae-Won;Kim, Young-Guk;Paik, Jin-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.5
    • /
    • pp.461-467
    • /
    • 2011
  • This study aims to create a numerical analysis model which can investigate the dynamic interaction between pantograph and overhead contact wire used for a high-speed railway vehicle, and validate the simulation results according to EN 50318 standard. Finite element analysis models of pantograph and overhead contact line are created using SAMCEF, a commercial FE analysis program. The mean, standard deviation, maximum and minimum values of contact forces are obtained. The simulation results are validated according to EN 50318, and the possibility of simulating the collecting characteristic of an actual pantograph system by using the developed model is discussed.

A Study on Characteristics of Overhead Rigid Conductor System for Developing the High-speed System up to 250km/h (250km/h급 강체전차선로 시스템 개발을 위한 R-BAR 특성 고찰)

  • Bae, Sang-Joon;Jang, Kwang-Dong;Lee, Ki-Won;Park, Youn-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.492-497
    • /
    • 2015
  • An overhead rigid conductor system is mainly applied to the subway and recently studies on the rigid system have been conducted for applications such as tunnels of high-speed line and speed improvement of a conventional lines up to 250km/h. Power feeding performance which is the most important in a rigid system can be measured by contact force and characteristics of this contact force are related to the shape and material of the R-BAR. In this paper, we analyze the measurements of contact force, current heating temperature, impedance of a rigid conductor which was developed in Korea, after that we compare static characteristics of home and abroad rigid conductors which have various shapes and materials.

Analysis of the Contact Wire Wear Pattern According to the Pre-sag (사전이도에 따른 전차선 마모 패턴 분석)

  • Lee, In-Hee;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1501-1507
    • /
    • 2015
  • The contact wire pre-sag in railway overhead catenary has been considered as a innovative idea which improves the current collection quality and is expected to evenly distribute wear along a span. However, long term studies on the effects of pre-sag, especially on the quantitative wear pattern of the contact wire, have not yet been reported. Therefore, in this study, the pre-sag and wear pattern of the contact wire along a span from long term operation of railway in Korea was surveyed. The examination was conducted on 3 lines, the Gyeongbu high-speed line with pre-sag of span/2000, the Gyeongbu existing line without pre-sag, and Gyeongchun line with pre-sag installation on 1/1000 of its span. The wear measurements of 58 sample spans were examined. The wear pattern analysis show no interrelationships between pre-sag and evenly distributed wear, but more wear occurred at the center of a span compared to the ends of the span, especially more noticeable as span length increases.

RCM Activities for Improvement of Availability of AREX Railway System (공항철도의 운영가용도 향상을 위한 RCM 활동)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.742-747
    • /
    • 2008
  • This paper is described the systematic activities of RCM to improve the availability for AREX railway system. The purpose of these activities are to maintain and enhance the reliability, availability, maintainability and safety, and to implement the effective maintenance for electrical and mechanical system including rolling stock, signalling, telecommunication, power supply, overhead catenary and platform screen door with impact to train operation.. The main activities consist of systematic failure and repair recording by integral information system, analysis and corresponding countermeasure. As applying these activities in opeartion and maintenance works, the availability of AREX railway system is going on improvement gradually, and maintenacne works are improved with these results.

  • PDF