1 |
Yangsu Kim, Haechul Yoo, Electric Railway Engineering Textbook, pp. 225-229
|
2 |
C.Vera, B.Suarez, J.Paulin, P. Rodriguez (2006) Simulation model for the study of overhead rail current collector systems dynamics, focused on the design of new conductor rail, Vehicle System Dynamics, 44, pp. 595-614
DOI
ScienceOn
|
3 |
Yim, Geum-Kwang, Chang, Sang-Hoon, Kim, Wang-Gon (2003), Analysis of overhead rigid conductor line for the subway tunnel section
|
4 |
BS EN50119: 2009, Railway application - Fixed installations - Electric traction overhead contact lines
|
5 |
J. Paulin, J.D.Sanz, A.Garcia, C.Vera, Development of New High-Performance Overhead Conductor Rail Using Simulation Models, and their Validation through Field Testing.
|
6 |
Minkyu Kim, Minseok Kim, Daehwan Kim, Jongwoo Lee (2010), A Study on the Impedance Calculation by using Equivalent Model in Catenary System, International Journal of Railway, Vol.3, No.2 pp.46-53
|
7 |
C. Vera, J. Paulin, B. Suarez, P. Rodriguez (2005) Improved design of an overhead rail current conductor for application in underground lines, 8th International Conference on Maintenance & Renewal f Permanent Way; Power & Signaling; Structures & Earthworks, London, U.K., pp. 29-30.
|
8 |
Mak, Man Kit (2012) Adoption of Overhead Rigid Conductor Rail System in MTR Extensions, Journal of International Council on Electrical Engineering, 2(4), pp. 463-466.
DOI
ScienceOn
|