• Title/Summary/Keyword: building owner

Search Result 181, Processing Time 0.025 seconds

A Study on the Space Organization and Garden Language of Mongsimjae in Namwon (남원 몽심재(夢心齋)의 정원구성과 조형언어 해석)

  • Rho, Jae-hyun;Choi, Yung-hyun;Shin, Sang-sup
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.1
    • /
    • pp.32-45
    • /
    • 2014
  • In this study, the characteristics of Mongsimjae in Namwon-si, Jeollabuk-do have been researched focusing on the writings engraved in huge stones and rocks of pavilion standing beside a lotus pond and its formative languages in the garden has been interpreted as follows. Name of pavilion(堂號) Mongsimjae(夢心齋) includes a classical scholar's spirit, refusing to serve two kings and homecoming after resignation from a government office(歸去來) of Songam(松菴) Park Moonsu(朴門壽), an ancestor who has brought to the Juksan(竹山) Park's family again. A pavilion standing beside a lotus pond(蓮塘) built in the reception garden is a gardening facility symbolizing 'Yeondang(蓮堂)' Park Dongsik(朴東式) who built Mongsimjae. The bamboo hill connected to the backyard seems to be relevant to 'Juksan', the family clan of Mongsimjae's owner and this kinds of intention can be found in the bamboos in the outer garden naturally led to inside the garden through the flower beds. The purpose for the western arrangement of the main building and gate contrary to the 'chukjwamihyaug'(丑坐未向; a direction toward to the south-southwest) of the prospect of Sarangchae(guesthouse) is interpreted to naturally attract people's eyes to the pavilion standing beside a lotus pond and to mitigate the sense of closure resulting from the huge stones located in the reception garden. Also the writing engraved in the three huge stones, 'Jonsimdae(存心臺)', implies that it is a place where was selected with heart by Juksan Park family who settled down in Homsil, Namwon after 'Haengchon(杏村) Park Jaryang(朴子良)' in Yiphyangjo(入鄕祖), Namwon and 'Jeongwa(靖窩)' is interpreted as a signature representing that it is the most comfortable house where Jeongwa Park Haechang(朴海昌: 1876~1933), the third owner of Mongsimjae, has lived. The pavilion standing beside a lotus pond of the 'Bangjibangdo(方池方島; square pond and square island)' type has no lotus for now and waterside cornerstones roughly piled with broken stones naturally mitigate the slope. There are two water inflows gathering rainwater in the reception garden other than the water inflow of valley and the upper-side water inflow was built using a high waterfall method. The middle island cut into a square was designed to use in two ways, as 'island' or 'steppingstone', according to the water level and the old name of the pavilion standing beside a lotus pond was revealed as 'Cheonundam(天雲潭)' from the engraved writing located in the side of the middle island. In addition, 'Imni(臨履)', engraved writing in the finishing stone of waterside by citing a line of 'Sigyeong(詩經)', implies 'Be a upright classical scholar who pays close attention to one's own behaviors' and 'Jeongchuk(渟?)' is interpreted as a message that desires the eternal staying of the Juksan Park family's wealth. Ultimately, the writings engraved in the huge stones and rocks of the pavilion standing beside a lotus pond are interpreted as a symbol language that wishes the heaven protects and maintains the wealth of the Juksan Park family who is the owner of Mongsimjae.

Investigation and Risk Assessment of Asbestos-Containing Materials used in Buildings (건축물에 사용된 석면함유물질(ACMs)의 조사 및 위해성 평가)

  • Kim, Hong-Kwan;Chon, Young Woo;Roh, Young Man;Hong, Seung-Han;Kim, Chi-Nyon;Lee, Ik-Mo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.28 no.1
    • /
    • pp.35-42
    • /
    • 2018
  • Objectives: The objectives of this study are to research the usage characteristics of asbestos-containing building materials and to conduct exposure risk assessment by applying no. 2016-230 "Methods of Risk Assessment of Asbestos-Containing Buildings" from the Ministry of Environment. Methods: One hundred buildings located in the Seoul and Gyeonggi-Incheon area were chosen, with 29 in Seoul, 20 in Incheon, and 51 in Gyeonggi-do Province. The year of construction was divided between three buildings in the 1970s, 11 buildings in the 1980s, 42 buildings in the 1990s, and 44 buildings in the 2000s. The bulk samples were analyzed by using a polarizing microscope after a pre-process using a stereomicroscope in a hood with an HEPA filter. This study defined ACMs(asbestos-containing materials) as asbestos when the content percentage was over 1% in the analysis result. Methods and standards of risk assessment of asbestos-containing building materials were conducted by refering to no. 2016-230 "Method of Risk Assessment of Asbestos-Containing Buildings" from the Ministry of Environment. The risk of exposure to ACMs was rated by a score based on three categories(high, middle, low risk of asbestos exposure). Results: In this study, 30 of the 100 buildings and 36 of the 416 bulk samples(8.6%) were found to have had asbestos. Asbestos was detected at a high rate, in 18 out of 42, in buildings constructed in the 1990s and at the lowest rate(7 out of 44) for buildings constructed in the 2000s. As a result of the evaluation according to no. 2016-230 "Method of Risk Assessment of Asbestos-Containing Buildings" of the Ministry of Environment, the risk assessment level of two asbestos-containing building materials was found to be "Medium", and 28 buildings materials were found to be at the "Low" level. Conclusion: As asbestos is regulated by the government, it is required to conduct active management and implemention by introducing methods of risk assessment of asbestos exposure that are supported by data from various situations. In the case of buildings owned by individuals, building owners should be aware of the risk of exposure to asbestos.

A Study of Construction Duration Predicting Method for Mega Project (메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구)

  • Woo, Yu-Mi;Lee, Seung-Hoon;Lee, Hei-Duck;Seo, Yuong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.597-600
    • /
    • 2008
  • Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.

  • PDF

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

A Study on the Later Architectural Intentions of Le Corbusier in Designing the Governor's Place (르 꼬르뷔제의 후기(後期) 건축적(建築的) 지향(志向)에 관한 연구 -주지사 관저 계획을 중심으로-)

  • Lee, Young
    • Journal of architectural history
    • /
    • v.8 no.4 s.21
    • /
    • pp.95-112
    • /
    • 1999
  • This Study starts from a recognition that the architecture is based on the process demanded by substantial needs as well as pure theoretical logic system. So this study aims at proposing another point of view differentiating process and principle of architecture from pure theoretical logic system in the creative process of the Governor's Palace by analyzing drawings in chronological order. Even though the Governor's Palace had not been built because of discord between authorities of India and Le Corbusier, it is undoubtedly one of the best proposals which contains very concepts and ideas of later Le Corbusier's architectural intentions. In the first design stage, overall conception of the building was carried out in the sketches and drawings till Jan, 1954 and in the second stage, the elaboration of the project was pursued till Mar. 1995. The scheme tends to begin too large and general in character, becoming tighter and more complex under pressure from the client and adjustments required by the design process itself. For example, scale reduction, division and development of internal circulation system and applying his early 'Five Points'. So new solutions are searched by oscillating between compromise modifications and radically different solutions in contracting the first ideas. From all these, it is concluded that the early doctrine (Five Points) are adjusted and extended towards another stage by the use of restricted pilotis, the concept of fenetre en longueur transformed into a sub stricture of facade, sustained concept of le plan libre, les toits jardins extended towards concept of the urban area. And these formal intentions of the Governor's Place has been carried through other contemporary projects like Mill Owner's Association in 1954 and Villa Shodan in 1952.

  • PDF

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

Local Governments′ Housing Information System (지방정부의 주택정보서비스체계구축방안 및 사례연구)

  • 윤혜정
    • Journal of the Korean housing association
    • /
    • v.15 no.2
    • /
    • pp.27-34
    • /
    • 2004
  • The purpose of this study has two folds. For the local government it gives a guide to establish the housing information system, which provides various housing information in order to promote service to the public on Internet. It also gives a guide for the local government to collect the fundamental data from local housing market and provide them to the policy makers as well as the housing producers (landlords, builders and owner-occupiers). Contents of housing information system website for the local government consist of three main parts. The first part provides housing policy and local housing market information to the upper level local government as well as housing producers. The second part provides housing information for the people who are looking for houses to move the own. Final part provides the procedures of building construction and development plan for landlords to the public. In case of Pyongtaek-City, this study makes them by cluster analysis of houses and households moving pattern as the Internet contents. Housing markets of Pyongtaek-City divide 3 sectors by housing type, tenure type and housing supply ratio etc. And populations prefer to move intra sectors. According to this information, policy-makers should define local housing problems and find solutions and housing producers can supply the house just in sites and in time. In conclusion, local government should provide valuable housing information based on local housing market research to the public for the effective housing policy. As local housing market is formed by various factors it is needed for local government to research housing sub-markets due to apply these research results to the local government for the future.

Formation of Taesil of Royal Family in Yecheon Area and Its Significance in the Light of Local History (예천지역 왕실의 태실조성과 지역사적 의의)

  • Lee, Jae-Wan
    • Korean Journal of Heritage: History & Science
    • /
    • v.49 no.2
    • /
    • pp.70-85
    • /
    • 2016
  • This study is to search for the significance of Taesil (Placenta Chamber) of royal family in the light of local history by examining the background that Yecheon area had been selected as building site of Taesil of Joseon and Goryeo dynasties and local correlation. In this study, Taesil in Yecheon area was formed at the area between Mt. Sobaek and Geumdangsil village which was promoted with the support of the royal family and given the responsibility of preserving Taesil as soon as Taeju (Owner of Placenta) was enthroned. It is because the formation of Taesil of royal family was an important event in the region, which strengthened the status of the region with the enthronement of Taeju. As shown in the case of Deposed Queen Lady Yun, Taesil of royal family was selected in accordance with the birthplace of Taeju and the relationship between the relevant area and royal family. Also as in the Case of King Jeongjo, this study says that the selection of Taesil site could be considered as the object of filial piety.

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

A Study on Determinants for Apartment Remodeling in Seoul Metropolitan Area (아파트 리모델링을 위한 의사결정 요인에 관한 연구 - 서울 및 경기 수도권을 중심으로 -)

  • Cho, Yongkyung;Lee, Jaewon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.57-65
    • /
    • 2019
  • If aging apartments are left unimproved through remodeling, the city will be eventually slum. As the government recognizes remodeling as an alternative to reconstruction, the law has been revised mainly to increase the housing area, increase the number of house and allow the vertical extension for making remodeling costs. However, the remodeling is still not activated yet in the market. Therefore, this study analyzes the decision factors of apartment remodeling in Seoul metropolitan area based on Heckman two-stage analysis considering sampling error. Research findings indicate that the decision for remodeling is determined by the characteristics of the household, housing, and time-lapse variables. And also the number of household members, net assets, housing satisfaction, the 11-20, 21-30, and more than 30 years of building are identified as the significant variables as a result of remodeling choice probability analysis. It is noteworthy that the significant variables from then remodeling cost analysis are net assets, area, more than 30 years of building, and unit housing price. It is also notable that the policy, which extend the housing area to cover remodeling cost, are not actually effective to activate the remodeling, and the age in the case of elderly people in Seoul and Gyeonggi-do who are expected to have high net assets and income is not significant variables. This study is expected to provide more objective and reliable implication to the policy makers, the home owner and the investors on the decision making process related to the remodeling project.