References
- Acharya, N.K., Lee, Y.D., and Choi, D.S. (2006), 'Key attitude indicators (KAI) for measuring attitude of contractors in construction projects,' KSCE J. Civil Eng., 10 (3), 151-163 https://doi.org/10.1007/BF02824056
- Bassioni, H.A., Price, A.D.F. and Hassan, T.M. (2004), 'Performance management in construction,' J. Manage. Eng. (ASCE), 20 (2), 42-50 https://doi.org/10.1061/(ASCE)0742-597X(2004)20:2(42)
- Chan, A.P.C., Scott, D., and Chan, A.P.L. (2004), 'Factors affecting the success of a construction project,' J. Constr. Eng. Manage. (ASCE), 130 (1), 153-165 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
- Chua, D.K.H., Kog, Y.C., and Loh, P.K. (1999), 'Critical success factors for different project objectives,' J. Constr. Eng. Manage. (ASCE), 125 (3), 142-150 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142)
-
Coetzee, M. (2005), 'The fairness of affirmative action: an organizational justice perspective,' PhD. Thesis, University of Pretoria, South Africa,
- Dikmen, I., Birgonul, M.T., and Kiziltas, S. (2005), 'Prediction of organizational effectiveness in construction companies,' J. Constr. Eng. Manage. (ASCE), 131 (2), 252-261 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(252)
- El-Mashaleh, M.S., Minchin, R.E., and O'Brien, W.J. (2007), ' Management of construction firm performance using benchmarking,' J. Constr. Eng. Manage. (ASCE), 23 (1), 10-17
- Field, A.P. (2005), Discovering statistics using SPSS, Accessed from http://www.sussex.ac.uk/Users/andyf/factor.pdf (Factor analysis using SPSS)
- Hatush, Z. and Skitmore, M. (1998), 'Contractor selection using multi-criteria utility theory: an additive model,' Build.Enviro. (Elsevier), 33 (2), 105-115 https://doi.org/10.1016/S0360-1323(97)00016-4
- Jung, D.R., and Kim, J.J. (2004), 'A study on competitive factor of domestic construction firm,' Proc. of The 5th KICEM Ann. Conf., 584-587
- Kagioglou, M., Cooper, R., and Aouad, G. (2001), 'Performance management in construction: a conceptual framework,' Const. Manage. Econ. (T &F), 19, 85-95 https://doi.org/10.1080/01446190010003425
- Kashiwagi, D., and Parmar, D. (2004), 'Past Performance Information in the Construction Industry' ASC Proceedings of the 40th Annual Conference, April 8 - 10, Utah (USA), 2004
- Keytone, J. (2001), Communication research: asking questions, finding answers, (2nd Ed.), McGraw-Hill
- Kim, D.Y., and Lee, J.S. (2004), 'Research on performance measurement of construction projects using balanced scoreboard (BSC),' Proc. of The 5th KICEM Ann. Conf., 494-499
- Lim, E.H. and Ling, F.Y.Y. (2002), 'Model for predicting clients'contribution to project success,' Eng. Constr. Archi. Manage. (Blackwell), 9 (5/6), 388-395 https://doi.org/10.1046/j.1365-232X.2002.00268.x
- Lin, G., and Shen, Q. (2007), 'Measuring the performance of value management studies in construction: Critical review,' J. Manage. Eng. (ASCE), 23 (1), 2-9 https://doi.org/10.1061/(ASCE)0742-597X(2007)23:1(2)
- Love, P.E.D., and Holt, G.D. (2000), 'Construction business performance measurement: the SPM alternative,' Bus. Process Manage. J., (Emerald), 6 (5), 408-416 https://doi.org/10.1108/14637150010352417
- Ng, S.T., and Skitmore, M. (1999), 'Client and consultant perspectives of prequalification criteria,' Build. Envir. (Elsevier), 34, 607-621 https://doi.org/10.1016/S0360-1323(98)00050-X
- Phua, F.T.T. (2004), 'Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives,' Const. Manage. Econ. (T & F), 22, 451-459 https://doi.org/10.1080/0144619042000190243
- Pongpeng J., and J. Liston. (2003), 'Contractor ability criteria: a view from the Thai construction industry', Const. Manage. Econ. (T & F), 21, 267- 282 https://doi.org/10.1080/0144619032000049647
- Shehnar, A.J., Dvir, D., Levy, O. and Maltz, A.C. (2001), 'Project success: a multidimensional strategic concept', Long Range Planning (Elsevier), 34, 699-725 https://doi.org/10.1016/S0024-6301(01)00097-8
- Shen, L.Y., Lu, W.S., and Yam, M.C.H. (2006), 'Contractor key competitiveness indicators: A China study,' J. Constr. Eng. Manage. (ASCE), 132 (4), 416-424 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:4(416)
- Singh, D., and Tiong, R.L.K. (2006), 'Contractor selection criteria: investigation of opinions of Singapore construction practitioners,' J. Constr. Eng. Manage. (ASCE), 132 (9), 998-1008 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(998)
- Soetanto, R. and Proverbs, D.G. (2002), 'Modeling the satisfaction of contractors: the impact of client performance,' Eng. Constr. Arch. Manage. (Blackwell), 9 (5/6), 453-465 https://doi.org/10.1046/j.1365-232X.2002.00278.x
- Yu, I.H., Kim, K.R., Jung, Y.S. and Chin, S.Y. (2006),' Analysis of quantified characteristics of the performance indicators for construction companies,' KICEM J. Constr. Eng. Manage. 7 (4), 154-163
- Wong, C.H. (2004), 'Contractor performance prediction model for the United Kingdom construction: study of logistic regression approach', J. Constr. Eng. Manage. (ASCE), 130 (5), 691-698 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(691)
- Unahabhokha, C., Platts, K., and Tan, K.H., (2007). 'Predictive performance measurement system: A fuzzy expert system approach,' Benchmarking: Int. J., (Emerald), 14 (1), 77-91 https://doi.org/10.1108/14635770710730946