Investigation of Key Factors to measure on-site Performance of a Construction firm  

Lee, Young-Dai (부경대학교 건설공학부)
Kim, Jung-Ki ((주)창성CEM)
Acharya, Nirmal Kumar (부경대학교 대학원)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.6, 2007 , pp. 246-262 More about this Journal
Abstract
The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.
Keywords
Performance evaluation; Key performance factors; Project success; Construction proiects; Construction firm; Project management body;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Coetzee, M. (2005), 'The fairness of affirmative action: an organizational justice perspective,' PhD. Thesis, University of Pretoria, South Africa,
2 Dikmen, I., Birgonul, M.T., and Kiziltas, S. (2005), 'Prediction of organizational effectiveness in construction companies,' J. Constr. Eng. Manage. (ASCE), 131 (2), 252-261   DOI   ScienceOn
3 Kashiwagi, D., and Parmar, D. (2004), 'Past Performance Information in the Construction Industry' ASC Proceedings of the 40th Annual Conference, April 8 - 10, Utah (USA), 2004
4 Shehnar, A.J., Dvir, D., Levy, O. and Maltz, A.C. (2001), 'Project success: a multidimensional strategic concept', Long Range Planning (Elsevier), 34, 699-725   DOI   ScienceOn
5 Acharya, N.K., Lee, Y.D., and Choi, D.S. (2006), 'Key attitude indicators (KAI) for measuring attitude of contractors in construction projects,' KSCE J. Civil Eng., 10 (3), 151-163   DOI   ScienceOn
6 Phua, F.T.T. (2004), 'Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives,' Const. Manage. Econ. (T & F), 22, 451-459   DOI   ScienceOn
7 Pongpeng J., and J. Liston. (2003), 'Contractor ability criteria: a view from the Thai construction industry', Const. Manage. Econ. (T & F), 21, 267- 282   DOI   ScienceOn
8 Kagioglou, M., Cooper, R., and Aouad, G. (2001), 'Performance management in construction: a conceptual framework,' Const. Manage. Econ. (T &F), 19, 85-95   DOI
9 El-Mashaleh, M.S., Minchin, R.E., and O'Brien, W.J. (2007), ' Management of construction firm performance using benchmarking,' J. Constr. Eng. Manage. (ASCE), 23 (1), 10-17
10 Chan, A.P.C., Scott, D., and Chan, A.P.L. (2004), 'Factors affecting the success of a construction project,' J. Constr. Eng. Manage. (ASCE), 130 (1), 153-165   DOI   ScienceOn
11 Chua, D.K.H., Kog, Y.C., and Loh, P.K. (1999), 'Critical success factors for different project objectives,' J. Constr. Eng. Manage. (ASCE), 125 (3), 142-150   DOI   ScienceOn
12 Wong, C.H. (2004), 'Contractor performance prediction model for the United Kingdom construction: study of logistic regression approach', J. Constr. Eng. Manage. (ASCE), 130 (5), 691-698   DOI   ScienceOn
13 Lin, G., and Shen, Q. (2007), 'Measuring the performance of value management studies in construction: Critical review,' J. Manage. Eng. (ASCE), 23 (1), 2-9   DOI
14 Field, A.P. (2005), Discovering statistics using SPSS, Accessed from http://www.sussex.ac.uk/Users/andyf/factor.pdf (Factor analysis using SPSS)
15 Kim, D.Y., and Lee, J.S. (2004), 'Research on performance measurement of construction projects using balanced scoreboard (BSC),' Proc. of The 5th KICEM Ann. Conf., 494-499
16 Singh, D., and Tiong, R.L.K. (2006), 'Contractor selection criteria: investigation of opinions of Singapore construction practitioners,' J. Constr. Eng. Manage. (ASCE), 132 (9), 998-1008   DOI   ScienceOn
17 Unahabhokha, C., Platts, K., and Tan, K.H., (2007). 'Predictive performance measurement system: A fuzzy expert system approach,' Benchmarking: Int. J., (Emerald), 14 (1), 77-91   DOI   ScienceOn
18 Lim, E.H. and Ling, F.Y.Y. (2002), 'Model for predicting clients'contribution to project success,' Eng. Constr. Archi. Manage. (Blackwell), 9 (5/6), 388-395   DOI   ScienceOn
19 Ng, S.T., and Skitmore, M. (1999), 'Client and consultant perspectives of prequalification criteria,' Build. Envir. (Elsevier), 34, 607-621   DOI   ScienceOn
20 Shen, L.Y., Lu, W.S., and Yam, M.C.H. (2006), 'Contractor key competitiveness indicators: A China study,' J. Constr. Eng. Manage. (ASCE), 132 (4), 416-424   DOI   ScienceOn
21 Hatush, Z. and Skitmore, M. (1998), 'Contractor selection using multi-criteria utility theory: an additive model,' Build.Enviro. (Elsevier), 33 (2), 105-115   DOI   ScienceOn
22 Bassioni, H.A., Price, A.D.F. and Hassan, T.M. (2004), 'Performance management in construction,' J. Manage. Eng. (ASCE), 20 (2), 42-50   DOI
23 Love, P.E.D., and Holt, G.D. (2000), 'Construction business performance measurement: the SPM alternative,' Bus. Process Manage. J., (Emerald), 6 (5), 408-416   DOI   ScienceOn
24 Soetanto, R. and Proverbs, D.G. (2002), 'Modeling the satisfaction of contractors: the impact of client performance,' Eng. Constr. Arch. Manage. (Blackwell), 9 (5/6), 453-465   DOI   ScienceOn
25 Jung, D.R., and Kim, J.J. (2004), 'A study on competitive factor of domestic construction firm,' Proc. of The 5th KICEM Ann. Conf., 584-587
26 Keytone, J. (2001), Communication research: asking questions, finding answers, (2nd Ed.), McGraw-Hill
27 Yu, I.H., Kim, K.R., Jung, Y.S. and Chin, S.Y. (2006),' Analysis of quantified characteristics of the performance indicators for construction companies,' KICEM J. Constr. Eng. Manage. 7 (4), 154-163   과학기술학회마을