A Study of Construction Duration Predicting Method for Mega Project

메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구

  • 우유미 ((주)건원엔지니어링 기술연구소) ;
  • 이승훈 ((주)건원엔지니어링 기술연구소) ;
  • 이희덕 ((주)건원엔지니어링 기술연구소) ;
  • 서용칠 ((주)건원엔지니어링 기술연구소)
  • Published : 2008.11.07

Abstract

Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.

최근 국내에서 도심재생을 위한 입체복합공간 개발사업으로 여러 메가프로젝트가 수행중이지만, 메가프로젝트 실적 자료 및 경험, 기술부족으로 인해 여러 가지 문제점들이 드러나고 있다. 다양한 유형의 프로젝트들로 구성된 입체 복합공간 개발 사업에서 프로그램 및 프로젝트 수준으로 메가프로젝트를 관리할 수 있는 기술이 요구된다. 메가프로젝트는 다년간에 걸쳐 수행되는 사업으로 사업기간 예측과 그에 따른 공정관리가 무엇보다 중요하다. 따라서 메가프로젝트 특성에 맞는 프로그램레벨에서의 공정관리 기술 개발이 필요하다. 본 연구에서는 공정관리 기술개발의 선행연구로 사업초기단계 사업기간 예측 및 일정 계획 방법에 대해서 제시하였다. 먼저 과거 수행된 단일시설 및 복합시설의 프로젝트 속성정보와 설계 및 공사기간의 일정데이터를 수집하여, 프로젝트 기간 예측을 위한 DB의 개발방향을 제시하였다. 그리고 메가프로젝트 사업초기단계 사업기간 예측 시 영향을 미치는 발주자의 요구사항과 사업비 투입계획에 따라 시나리오를 개발하여 사업기간 예측 방법에 대해 제시하였고, CCPM을 통한 사업기간 단축가능성을 제시하였다.

Keywords