• Title/Summary/Keyword: Extension of Construction Period

Search Result 68, Processing Time 0.02 seconds

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

An Analysis of the Construction Period Extension Causes of Environmental Improvement in School Facilities (학교시설 환경개선 공사사례의 공기연장 원인 분석)

  • Maeng, Joon-Ho;Kim, Sung-Joon ;Song, Byung-Joon ;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.22 no.1
    • /
    • pp.13-27
    • /
    • 2023
  • This study analyzed the reasons for extending the construction period considering factors such as the quality of construction materials, safety and cost-effectiveness of construction, size of construction, academic schedule, and local conditions (complaints) when determining the appropriate period for school construction projects tailored to a specific region or educational office. Based on the example of construction projects for school facility improvement by education office A, this study conducted a case study to identify the motives for construction period extension. To determine the appropriate construction period for school facilities, this study conducted a comprehensive review of construction projects under the jurisdiction of education office A, examined data from the Meteorological Data Open Portal, and performed advanced statistical analysis. Future case studies must determine the appropriate construction period for school facilities in a rational and systematics.

A Study on the Improvement of Long-Term Continuing Construction Contracts Dispute Using FGI (FGI를 활용한 장기계속공사계약 분쟁 개선방안 기초연구)

  • Kim, Jae-Sik;Lee, Jung-Won;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.79-87
    • /
    • 2023
  • Given that most government contracts are based on a fiscal year, long-term continuing construction contracts require appropriate provisions as significant amounts of budget is supposed to be invested for several years. This study drew problems and improvements of the long-term continuing construction contracts by analyzing the contents of FGI and list of construction order. We found that a number of problems, such as the mismatch between laws and enforcement decrees, difference in calculating overheads due to the extension of construction period, many construction orders that are hard to see as budget efficiency and over investment in the final annual contract, were tangled up in the process. To solve the problems mentioned, we suggested several improvements as follows: (1) effect of total construction period and total amount should be guaranteed by a law, (2) it is suggested that the scope of long-term continuing construction contract is determined by a law, and (3) it should be clear about the calculation of overheads concerned with the extension of construction period as well as the estimation of construction period to prevent over investment in the final contract.

Application Effect Analysis of The Modular Construction Method in The Extension Works (저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석)

  • Kim, Hakcheol;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.101-111
    • /
    • 2015
  • The modular construction method has been getting more attention followed by global eco-friendly trend as the domestic construction industry has focused more on remodeling and extension work. The modular construction method is an industrialized construction system which is not likely as the existing construction method it manufactures more than 70% modules at the factory then assembling can be completed in a short amount of time on site. The modular construction method has various strengths; shortening of construction period by on-site work decrease, weight pressure reduction by usage of light steel frames and cost saving by repetitive manufacturing. However, it is currently not expanded due to the existing commercialized construction method. Therefore, this research is in order to help the related authorities make decisions to select the construction method and motivate expansion of modular construction method which can be utilized effectively in the extension works. The intention of this research is to stress differentiation from other construction methods in construction period, construction expenses, labor and forces by comparing and analyzing actual cases, to inform competitiveness of modular construction method by concrete effect analysis and to support adoption of the modular construction method into the domestic industry.

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

Application of the Seismic Response Reduction Technology for Boramae Deokyo Building Remodeling (보라매 대교빌딩 리모델링을 위한 지진응답 저감기술 적용사례)

  • Park, Young-Mi;Park, Ki-Hong;Jo, Seong-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.134-136
    • /
    • 2013
  • In general, the seismic retrofit is almost essential to extend and remodel aged buildings. Because domestic seismic design code has been enhanced, seismic performance should be secure for aged building remodeling. Seismic response reduction device (damper) is lately appling to ensure seismic performance. This device is economical efficiency method that can reduce the load to foundation and the range of structural reinforcements, shorten of construction period. New shaped steel damper was applied for extension and remodeling construction for Boramae Deakyo building. As a result, the economy and shortening of construction period was achieved.

  • PDF

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

Development of Quality Management in Small and Medium Construction Company (중 · 소규모 건설회사의 품질관리 방법 개선)

  • Lee, Geu-Sun;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.117-124
    • /
    • 2005
  • Quality management in construction industry becomes more significant under the existing conditions such as, increasing higher demand caused by the high value of real estate and extension of the warranty period. Therefore, this study presents the alternative idea related to the current quality management conditions of small and medium construction companies, including the difficulties and problems in qualify management, in order to develop the systematical method for the quality management in small and medium construction company.