1 |
Cushman R. F., Carter J. D., Gorman P. J. and Coppi D. F. (2001). "Proving and Pricing Construction Claims" New York, Aspen Publishers.
|
2 |
Adrian, James J. (1993). "Construction claims : A Quantitative Approach" Illinois, Stipes Publishing Company.
|
3 |
Jeong, K., Park, Y. and Lee, J. (2012). "Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension." Korean Journal of Construction Engineering and Management, KICEM, 13(6), pp. 33-44.
DOI
|
4 |
Koo, B. S., Yu, J. H., and Park, J. H. (2015). "Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts." Journal of the Korean Society of Civil Engineers, 35(6), p. 1407.
|
5 |
Kim, j., Kim, K., and Han, J. (2011). "An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 31-41.
DOI
|
6 |
Lee, G., and Kim, Y. (2001). "A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period." Korean Journal of Construction Engineering and Management, KICEM, 2, pp. 305-310.
|
7 |
Ministry of Strategy and Finance (2010). "Improvement of the Payment Method on the Additional Costs due to Construction Extension" Research Report, Korea.
|
8 |
G. A. Barraza, W. E. Back, and Fernando Mata. (2004). "Probabilistic Forecasting of Project Performance Using Stochastic S Curves" Journal of Construction Engineering and Mangement, 130(1).
|
9 |
G. A. Barraza, W. E. Back, and Fernando Mata. (2000). "Probabilistic Monitoring of Project Performance Using SS-Curves" Journal of Construction Engineering and Management, 126(2).
|
10 |
Jeong, K., and Lee, J. (2016). "Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project" Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 95-102.
DOI
|
11 |
Jin, E., Kwak, S., Kim, D., Kim, H. and Han, S. (2006). "Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage" Proceedings of KICEM Anunual Confetence.
|
12 |
Lee, K. (2001). "A Study on the Reasonable Compensation and Institutional Improvement of Delay Damages for Contractors According to the Prolongation of Contract Period" MS thesis, Chung-Ang University, Seoul, Korea.
|