1 |
Yoon, J.S., and Yu, I.H. (2017). "A Study on Estimating Normal Project Duration of Apartment Remo deling Project." Korean Journal of Construction Engineering and Management, KICEM, 18(2), pp. 12-20.
DOI
|
2 |
Lee, B.S., Kim, K.N., and Lee, M.J. (2015). "A Study on Normal Project Duration for Water Resource Project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 35-43.
DOI
|
3 |
Bae, K.W. (2017). "A Study on Standard Construction Process Management System fo rPrediction of Proper Construction Period of Subsea Tunnel." Korean Journal of Construction Engineering and Management, KICEM, 18(4), pp. 36-47.
DOI
|
4 |
Kim, H.N., Kim, D.Y., Kim, D.Y., Jeong, S.C., and Huh, Y.K. (2018). "Optimum Construction Duration for Road Tunnel Excavation Works." JAIKSC, 34(4), pp. 59-64.
|
5 |
Kim, K.H., and Lee, Y.L. (2018). "Trends and Prospects of Construction Engineers." Construction & Human Research Institute of Korea, pp. 1-13.
|
6 |
Kwon, O.H., and Lee, J.S. (2002). "Introduction of 5 working days in construction industry." Construction Journal, pp. 19-20.
|
7 |
Kim. H.R., Yu, I.H., Kim, K.R., and Shin, D.W. (2003). "An Influence Analysis of the Reduction of Working Time in Construction Sites." Journal of the Architectural Institute of Korea, 19(4), pp. 161-168.
|
8 |
Lee, J.S. (2005). "The Analysis for Effects of the 40 Hours Workweek System on the Specialty Construction Industry." Journal of the Architectural Institute of Korea, 21(3), pp. 145-152.
|
9 |
Ministry of Land, Infrastructure and Transport (2016). 'Guideline for designing national highway.'
|