The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project  

Park, Taeil (Korea Institute of Civil Engineering and Building Technology)
Kim, Kyunghoon (Korea Institute of Civil Engineering and Building Technology)
Shin, Eun-Young (Korea Institute of Civil Engineering and Building Technology)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.2, 2019 , pp. 37-43 More about this Journal
Abstract
After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.
Keywords
Construction Period; Reduced Labor Hour; Tunnel Project;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Yoon, J.S., and Yu, I.H. (2017). "A Study on Estimating Normal Project Duration of Apartment Remo deling Project." Korean Journal of Construction Engineering and Management, KICEM, 18(2), pp. 12-20.   DOI
2 Lee, B.S., Kim, K.N., and Lee, M.J. (2015). "A Study on Normal Project Duration for Water Resource Project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 35-43.   DOI
3 Bae, K.W. (2017). "A Study on Standard Construction Process Management System fo rPrediction of Proper Construction Period of Subsea Tunnel." Korean Journal of Construction Engineering and Management, KICEM, 18(4), pp. 36-47.   DOI
4 Kim, H.N., Kim, D.Y., Kim, D.Y., Jeong, S.C., and Huh, Y.K. (2018). "Optimum Construction Duration for Road Tunnel Excavation Works." JAIKSC, 34(4), pp. 59-64.
5 Kim, K.H., and Lee, Y.L. (2018). "Trends and Prospects of Construction Engineers." Construction & Human Research Institute of Korea, pp. 1-13.
6 Kwon, O.H., and Lee, J.S. (2002). "Introduction of 5 working days in construction industry." Construction Journal, pp. 19-20.
7 Kim. H.R., Yu, I.H., Kim, K.R., and Shin, D.W. (2003). "An Influence Analysis of the Reduction of Working Time in Construction Sites." Journal of the Architectural Institute of Korea, 19(4), pp. 161-168.
8 Lee, J.S. (2005). "The Analysis for Effects of the 40 Hours Workweek System on the Specialty Construction Industry." Journal of the Architectural Institute of Korea, 21(3), pp. 145-152.
9 Ministry of Land, Infrastructure and Transport (2016). 'Guideline for designing national highway.'