Application Effect Analysis of The Modular Construction Method in The Extension Works |
Kim, Hakcheol
(Department of Architectural Engineering, Graduate School of Ajou University)
Shin, Dongwoo (Department of Architectural Engineering, Graduate School of Ajou University) Cha, Heesung (Department of Architectural Engineering, Graduate School of Ajou University) Kim, Kyungrai (Department of Architectural Engineering, Ajou University) |
1 | Bae, B., Kim, K., Cha, H. and Shin D. (2012). "To Improve Production Process of the Modular Using the Conveyor System" Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 103-112. DOI |
2 | Ha, T. (2011). "Development Status and Case Studies of Modular Construction Method", Korean Research Institute for Construction Policy, v.1, pp. 144-151. |
3 | Ji, J. (2012). "A Study on the Customized Remodeling by Modular Method Housing", Journal of The Korean Housing Association, Khousing, v.1, pp. 237-240. |
4 | Kim, D., Kim, K., Cha, H. and Shin D. (2013). "A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type", Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 164-174. DOI |
5 | Lee, K., Kim, K., Shin, D. and Cha H. (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Offsite Manufacture, Transportation and On-site Installation", Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-19. DOI |
6 | Lee, D., Cha, H., Kim, K., and Shin D. (2006), "Development of Decision-Making Process on Technology Selection for Aged-Housing Remodeling", Korean Journal of Construction Engineering and Management, KICEM, v.11 pp. 448-452. |
7 | Murtaza, M., Fisher, D., and Skibniewski, M. (1993). "KNOWLEDGE-BASED APPROACH TO MODULAR CONSTRUCTION DECISION SUPPORT", ASCE, Construction. Eng. Management 119(1):115-130. DOI |
8 | Kenneth, R. and David, T. (2006). "Economic Value of Building Faster", ASCE, Construction. Eng. Management 132:759-766. DOI |
9 | National Audit Office (2005). "Using modern methods of construction to build homes more quickly and efficiently", Report by the national audit office. |
10 | Eren, O. (2012). "A Proposal for Sustainable Temporary Housing Applications in Earthquake Zones in Turkey: Modular Box System Applications", Gazi University Journal of Science, GU J Sci, 25(1):269-287. |
11 | Park, Z. and Ahn, Y. (2013). "A Study on the Impact from Cost of Quality Control in the Construction Site" Journal of Architectural institute of Korea, CAK, 14(1), pp. 237-242. |
12 | Yu, M., Oh, J., Lee, M., Yu, Y. and Park, T. (2005). "A Study on Analyzing the duration of modular construction method", Korean Journal of Construction Engineering and Management, KICEM, pp. 201-204. |
13 | Kim, C., Sim, U. and Hyung, W. (2014). "A study on th e deduction of important factors for modular system application in apartment house vertical-extension constructions", KCI, 16(5). |