• Title/Summary/Keyword: Construction Period

Search Result 2,698, Processing Time 0.034 seconds

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

Effect of Seismic Load on Residential RC Buildings under Construction Considering Construction Period (시공기간을 고려한 주거용 철근콘크리트 건물의 시공 중 지진하중 영향 분석)

  • Choi, Seong-Hyeon;Kim, Jea-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.235-242
    • /
    • 2022
  • Compared with buildings that have already been constructed, buildings under construction may be more vulnerable to such natural disasters as earthquakes because the concrete strength is not yet sufficient. Currently, Korean design standards present minimum performance targets for each seismic grade of buildings, but the seismic load for design is based on a return period of 2400 years. However, because the construction period of the building is much shorter than the period of use of the building, the application of the earthquake return period of 2400 years to buildings under construction may be excessive. Therefore, in this study, a construction stage model of buildings with 5, 15, 25, and 60 floors was created to analyze earthquake loads during construction of residential reinforced concrete (RC) buildings. The structural stability was confirmed by applying reduced seismic loads according to the return period. As a result, the structural stability was checked for an earthquake of the return period selected according to the construction period, and the earthquake return period that can secure structural safety according to the size of the building was confirmed.

An Analysis of the Construction Period Extension Causes of Environmental Improvement in School Facilities (학교시설 환경개선 공사사례의 공기연장 원인 분석)

  • Maeng, Joon-Ho;Kim, Sung-Joon ;Song, Byung-Joon ;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.22 no.1
    • /
    • pp.13-27
    • /
    • 2023
  • This study analyzed the reasons for extending the construction period considering factors such as the quality of construction materials, safety and cost-effectiveness of construction, size of construction, academic schedule, and local conditions (complaints) when determining the appropriate period for school construction projects tailored to a specific region or educational office. Based on the example of construction projects for school facility improvement by education office A, this study conducted a case study to identify the motives for construction period extension. To determine the appropriate construction period for school facilities, this study conducted a comprehensive review of construction projects under the jurisdiction of education office A, examined data from the Meteorological Data Open Portal, and performed advanced statistical analysis. Future case studies must determine the appropriate construction period for school facilities in a rational and systematics.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Economic Feasibility Analysis on Construction Facility Improvement Project of North Korea Considering Technology Application Period (국내 기술의 적용시기를 고려한 북한 건축시설 개선사업의 경제적 타당성 분석)

  • Kim, Min Ju;Kim, Chang-Won;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.68-69
    • /
    • 2016
  • North Korean market created by reunification of the Korean Peninsula is expected to serve as a new growth engine to the already-developed construction industry of South Korea. Improvement on deteriorated construction facility of North Korea is a project in urgent need at the initial stage of reunification. Prior to market entry of the Korean peninsula under these circumstances, economic feasibility analysis on construction technology application must be preceded by considering reunification period. Therefore, this study conducts an economic feasibility analysis on construction facility improvement project of North Korea considering application period of technology developed by South Korea. Results of this study are expected to be utilized in future reunification process as the basis for establishing relevant guidelines for construction facility improvement project of North Korea.

  • PDF

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF

Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building (보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Lee, Dong-Gun;Kim, MIn-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects (공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.12-20
    • /
    • 2021
  • In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active 'transformation of thoughts' was proposed through this study. In other words, the process of reviewing and calculating 'the appropriate construction period' was institutionalized by introducing 'process management experts' and 'construction experts by type of construction' in the design stage.