머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression

  • 발행 : 2023.05.17

초록

In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

키워드

과제정보

본 연구는 국토교통부/국토교통과학기술진흥원의 2023년도 지원으로 수행되었음(과제번호: RS-2021-KA163269).