• 제목/요약/키워드: Catenary-line

검색결과 176건 처리시간 0.021초

정전류 철도 부하를 이용한 교류 전기 철도 급전 시스템 해석 (Analysis for Autotransformer-Fed AC Electric Railroad System Using Constant Current Mode)

  • 이승혁;정현수;김진오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.329-334
    • /
    • 2001
  • This paper presents exact autotransformer-fed AC electric railroad system modeling using constant current mode. The theory is based on the solution of algebraic. The proposed modeling is considered the line self-impedances and mutual-impedances. Besides, the load modeling improved results are obtained as application to the proposed constant current mode. In the analysis on AT-fed AC electric railroad system circuit, a generalized analysis method using the loop equation on a case by case. the simulation objectives are to calculate the catenary and rail voltages with respect to ground, as the train moves along a section of line between two adjacent ATs. The model contains assumptions regarding the representation of the autotransformer, the impedance of the track/catenary system, and the grounding arrangements, which all effect the accuracy of the result. The modeling results seem very reasonable. It is established that techniques for the AC electric railroad system modeling and analysis.

  • PDF

교류전기철도 급전시스템의 전차선 전압해석 (Analysis for Catenary Voltage of The ATs-Fed AC Electric Railroad System)

  • 이승혁;정현수;김진오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.490-496
    • /
    • 2002
  • This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode far locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Finally, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.

  • PDF

Comparison of simplified model and FEM model in coupled analysis of floating wind turbine

  • Kim, Byoung Wan;Hong, Sa Young;Sung, Hong Gun;Hong, Seok Won
    • Ocean Systems Engineering
    • /
    • 제5권3호
    • /
    • pp.221-243
    • /
    • 2015
  • This paper compares simplified and finite element method (FEM) models for tower and blade in dynamic coupled analysis of floating wind turbine. A SPAR type wind turbine with catenary mooring lines is considered in numerical analysis. Floating body equation is derived using boundary element method (BEM) and convolution. Equations for mooring line, tower and blade are formulated with theories of catenary, elastic beam and aerodynamic rotating beam, respectively and FEM is applied in the formulation. By combining the equations, coupled solutions are calculated. Tower or blade may be assumed rigid or lumped body for simplicity in modeling. By comparing floating body motions, mooring line tensions and tower stresses with the simple model and original FEM model, the effect of including or neglecting elastic, rotating and aerodynamic behavior of tower and blade is discussed.

전차선로 속도향상에 따른 오버랩 구간(Overlap section) 경간 구성 기법 (Research on Configuration Optimization of Overlap Section in Overhead Catenary System for High-speed Railway)

  • 최태수;최규형
    • 전기학회논문지
    • /
    • 제66권6호
    • /
    • pp.975-980
    • /
    • 2017
  • Overhead catenary system of electric railway has overlap sections which devide and tighten trolley wire supplying electric power to train, where current collection performances may become worse according to railway speed-up. Current collection tests conducted at 400 km/h test-bed section of Honam high-speed railway show that balanced line arrangement at overlap section is needed to secure current collection without arc generation between trolley wire and train current collection device. This paper proposes a design procedure of the overlap section to allow for tension increase and uplift of the trolley wires according to railway speed-up. By applying the proposed procedure to the overhead catenary system of Honam high-speed railway, it is suggested that the minimum span length should be 33.2 m for railway speed-up to 350 km/h and 43.7 m for speed-up to 400 km/h.

전차선과 팬터그래프 사이의 동적 상호작용 시뮬레이션 (Simulation of the Dynamic Interactions between Catenary and Pantograph)

  • 권삼영;김길상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 A
    • /
    • pp.455-459
    • /
    • 1995
  • Catenary/pantograph system consists of overhead lines which have non-uniform elasticity and pantographs which move at high speed and give force to the lines, therefore happen to be failed in contacts between both from time to time. In this study, as the first step to develop a dynamic simulation program, the general theory is discussed for catenary/pantograph system and appropriate modelling. And comparison is conducted with the references after making a program which referred to the contact force equation algorithm. On this algorithm, the unknown contact force is computed by the equations which was induced as combining catenary and pantograph motion equations expressed in finite difference form. Another simulation program based on the assumed contact forces algorithm was developed. In this algorithm, numerical integraion of both the overhead line and pantograph equations, which without combining, are effected for two assumed values of contact force. The correct contact force is then obtained from these two sets of results by linear interpolation to satisfy the contact condition. Through the comparative review on the outputs from this program, it is verified that this algorithm is reliable.

  • PDF

선로변 전차선과 조가선의 전류를 이용한 집전성능 분석 기술 (Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side)

  • 박영;신승권;이기원;김재문;김원하
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.573-576
    • /
    • 2013
  • In this paper, analysis method for current collection performance based on real-time current of catenary system is proposed. An innovative method based on track-side of railway system is used for measurement of currents for overhead contact line during the collection with pantograph. The evaluation of a qualitative ratio for current collection performance were conducted using proposed algorithm under various conditions such as laboratory and track-side. To check the validity of our approach, we compared between calculation results from current of contact wire and measurement results from arcing of pantograph using simulator in laboratory conditions. The results show that the behavior of current collection performance were analysis from currents of overhead contact line in AC electric railway system.

강체 전차선로이행구간 고속화 방안 연구 (A Study on Speed-up of a Transition Section Between Overhead Catenary and Rigid Conductor System)

  • 이기원;최태수;조용현;박영;전효찬;최규형
    • 전기학회논문지
    • /
    • 제67권3호
    • /
    • pp.467-473
    • /
    • 2018
  • R-Bar(Overhead Rigid Conductor system) is being developed for the high-speed in Europe because it has an advantage of cross section area reduction of tunnel compared with OCS (Overhead Catenary Line). Because there are lots of underground sections and mountains in korea, it is necessary to develop the R-Bar for a high-speed line. In this study, a method on speed-up of transition section between OCS and R-Bar is proposed. The commercial program, DAFUL, is used to predict a dynamic characteristics between Overhead Line and pantograph. The program is evaluated according to EN 50318 which is the European Norm for evaluation of the program. Using the evaluated modeling and method, a method for the max. speed of 250 km/h of transition section is proposed.

사전이도에 따른 전차선 마모 패턴 분석 (Analysis of the Contact Wire Wear Pattern According to the Pre-sag)

  • 이인희;박재영
    • 전기학회논문지
    • /
    • 제64권10호
    • /
    • pp.1501-1507
    • /
    • 2015
  • The contact wire pre-sag in railway overhead catenary has been considered as a innovative idea which improves the current collection quality and is expected to evenly distribute wear along a span. However, long term studies on the effects of pre-sag, especially on the quantitative wear pattern of the contact wire, have not yet been reported. Therefore, in this study, the pre-sag and wear pattern of the contact wire along a span from long term operation of railway in Korea was surveyed. The examination was conducted on 3 lines, the Gyeongbu high-speed line with pre-sag of span/2000, the Gyeongbu existing line without pre-sag, and Gyeongchun line with pre-sag installation on 1/1000 of its span. The wear measurements of 58 sample spans were examined. The wear pattern analysis show no interrelationships between pre-sag and evenly distributed wear, but more wear occurred at the center of a span compared to the ends of the span, especially more noticeable as span length increases.

경부고속철도 시험선구 고조파 예측에 관한 연구 (A study of the harmonics evaluation in the test track of Korea High Speed Rail)

  • 김길상;오광해;권삼영;이태형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 추계학술대회 논문집
    • /
    • pp.241-248
    • /
    • 1998
  • The purpose of this study is to evaluate the harmonics generated from Korea High Speed Rail's trainset and to analyze the effect on the KEPCO power system. This study focuses on the test track of the high speed rail and analyzes 154㎸ transmission line, scott transformer, autotransformer and 27,5㎸ line. The trainset is modeled as a harmonic source attached to the catenary line of the test track. Then, harmonic distortion is calculated. This distortion is compared with the KEPCO's regulations in relation to harmonic.

  • PDF

기존선 교류전기철도 절연구분장치에서의 속도향상 기술 (Technique for the Speed Up of Neutral Section on the Convention Line Catenary System)

  • 창상훈;이기원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.294-301
    • /
    • 2008
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. Except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF