1 |
E.K. Youn, K.H. Choi, "A Study on Reliability Analysis of Electric Railway Catenary System using FMECA", Transactions of KIEE, vol. 64, no. 11, pp. 1618 1625, Nov. 2015.
|
2 |
S. H. Chang, K. Lee, S. Y. Kwon, J. W. Park, "Technique of Tension Length Calculation for 350km/h High Speed Catenary System", 2011 Annual Conference of Korean Society for Railway, pp. 932-939, May 2011.
|
3 |
G. Mei, W. Zhang, H. Zhao & L. Zhang, "A Hybrid Method to simulate the Interaction of Pantograph and Catenary on Overlap Span", International Journal of Vehicle Mechanics and Mobility, Volume 44, 2006.
|
4 |
J. P. Massat, J. P. Laine & A. Bobillot, "Pantograph-catenary Dynamics Simulation", Vehicle System Dynamics, Vol. 44, Supplement, 551-559, 2006.
DOI
|
5 |
P.C. Antunes, "Development of Multibody Pantograph and Finite Element Catenary Models for Application to High-speed Railway Operations", Thesis of Master Degree, Technico Lisboa, Oct. 2012.
|
6 |
M. Shimizu, Y. Fujii, "Improvement of Structure of Contact Wire on Overlap Sections of Shinkansen", Quarterly Report of RTRI, Vol. 41, No. 4, 2000.
|
7 |
S.Y. Kwon, Y. Cho, Y. Park, K. Lee, "A Prediction of the Geometry Change Especially in Takeoff Point of Overlaps When Increasing Contact Wire Tension in a Existing Catenary", 2011 Annual Conference of Korean Society for Railway, pp.1863-1867, Oct. 2010.
|
8 |
SIEMENS, "Contact Lines for Electric Railways", 2009.
|
9 |
"Facilities and Component Diagrams of New 400km/h High Speed Catenary System (General Drawing of Single Pole-Air Joint-(A00A07))", KRRI, 2014. 07.
|
10 |
Y. Park, K. Lee, "Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System", Transactions of KIEE, vol. 65, no. 9, pp. 1605 1609, 2016.
|