Journal of Korea Society of Industrial Information Systems
/
v.15
no.5
/
pp.273-286
/
2010
The main purpose of this study was to demonstrate the most common characteristics of the small and medium system integration companies in performing IT projects. In this study, 388 auditing reports on the 194 IT projects which were carried out by the small and medium size manufacturers from 2006 to 2009 were employed and surveyed. This survey revealed that the schedule management was the most neglected item in the project management area, the test planning and action was the most neglected item in the development and coding area, and the manual preparation for users and operators was the most neglected item in the operation and maintenance area. Consequently these three most neglected items were considered as the most common characteristics of the small and medium system integration companies in performing IT projects.
Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.
Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.3
/
pp.221-230
/
2023
Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
This study is a study on the different cognitive systems and different knowledge systems of members participating in complex and diverse consulting projects, and it is a study on team collaboration that affects the team performance of the project. The purpose of this study is to analyze the mediating effects of team shared cognition, team transactive memory, team knowledge integration, and team efficacy in the cognitive interaction process of a consulting project. This study established a research model and research hypothesis based on previous studies. Data were collected from consultants who actually participated in the consulting project. To empirically analyze the research hypothesis, demographic analysis, validity and reliability analysis, structural model analysis for hypothesis verification, and mediating effect analysis using phantom variables were performed. As a result of the study, in order to increase team performance, it is necessary to improve team shared cognition and team transactive memory, which are cognitive systems, and team knowledge integration, which is a knowledge system, must also be improved. Therefore, there is a need for a sense of team efficacy that integrates disparate cognitive and knowledge systems, trusts each other's expertise, and enables successful team work. In addition, future studies on sub-factors of cognitive processes are needed.
Purpose: This paper seeks to analyze the relationship between project sponsor roles and project manager competencies which may account for project performance quality. Methods: After an extensive literature review, the structural equation modeling was conducted test the research model. The data was collected from project manager training course attendees by the questionnaire. Results: The results of structural equation modeling show that project sponsor roles effect on project manager competencies. Project manager competencies have a positive effect on project performance quality. Conclusion: The authors demonstrate that project sponsor external roles are related positively to project performance quality. And project manager professionalism has a positive effect on project manager communication. A number of significant findings are reported including the empirical verification that project sponsor roles, and project manager competencies may all be directly related to project performance quality.
Journal of the Korean Operations Research and Management Science Society
/
v.31
no.4
/
pp.157-179
/
2006
Recently, as business becomes more dependent on information technology for their operations, SI project managers are under increasing pressure to implement SI projects on time and within budget, and to satisfy customer requirements. For the success of SI projects and customer satisfaction, SI project managers should master the critical shills and knowledge requirements and consider the proper leadership style to lead the team members and to manage SI projects. The leadership style includes four categories, such as directive leadership, supportive leadership, participative leadership, and achievement-oriented leadership. This study has examined the project managers' competency and suggests the three competency factors, which are technical, human, and conceptual shills, for the success of SI projects and customer satisfaction. The study suggests that SI project managers should master the three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of SI projects. Also SI project managers should consider contingency factors such as project size and duration and outcome variables such as protect performance and customer satisfaction so as to enhance the leadership effectiveness.
As digital cultural heritages have been applied to various fields, more systematic research on the domestic digital cultural heritage need to be improved. The EPOCH project by European Union contributed to standardization of ICT+CH domain, creation of network between different organization, and study of socio-economic impact of digital cultural heritage. We can find a way to improve domestic digital cultural heritage projects by analyzing EPOCH project in each management technique culture view. Based on these analysis this paper suggests the necessity to establish an independent research domain for digital cultural heritage, investment in heritage sites by private companies, and research to fit better with the user's need, and study on business administration in digital cultural heritages.
Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.
Social collaboration and knowledge sharing among experts are the key characteristics of information system development projects. But the difficulty and complexity of communication may be the cause of the project failures. This study analyzes the influence of on-line social networking as communication system in information system development projects. A model has been developed to relate system, knowledge and social factors of on-line social networking to the performance of project members. Transactive Memory System (TMS), describing knowledge sharing process in human relationship, is used as a mediator. The analysis concludes that knowledge and social characteristics have positive effect on the members' performance, implying that the use of mobile devices and PCs as a social communication tool can be an effective way to enhance the possibility of project success.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.8
/
pp.2068-2077
/
2009
While six sigma project management systems have been widely used as a knowledge management systems, no one has proposed an empirical explanation for impacts of project management systems on project performance. This study proposes a structural equation model of the project management system that relates learning/growth, internal growth, customer performance, and financial effects based on six sigma project performance. The relationships are investigated using data collected from a sample of green and black belts. The results indicate that there are a causal relationship with use of project management and learning/growth and internal process, internal process and customer performance, and customer and financial performance. However, there is no relationship between internal process and financial effects. The results suggest that six sigma project system could effectively be implemented as a knowledge management system to improve six sigma performance of green an black belts. This study also compares index of SEM's model fit of research model and that of alternative models for further analysis. The result shows that index of research model of index is better than that of alternative model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.