• Title/Summary/Keyword: 사업이전단계 사업관리

Search Result 67, Processing Time 0.022 seconds

Level of Use of Construction Management Services in Private Building Projects during Pre-construction Stages (민간 건축 CM사업 시공이전단계의 CM서비스 활용도 분석에 관한 연구)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.15-23
    • /
    • 2010
  • Construction management(CM) in the private building sector has been leading the growth of the CM market in Korea. The use of CM services during pre-construction stages has been recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM fedms to strategically prepare and cope with market needs. The objective of this paper is to investigate the level of use of CM services in private building projects during pre-construction stages, and to identify key characteristics and implications. The most distinctive characteristics include the high demand and use of cost management and time management services during pre-construction stages.

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project (기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가)

  • Kim, Kukjoo;Ahn, Sungjin;Park, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2020
  • The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

Barriers of CM Performance during Pre-Construction Stages in Private CM Projects (민간 CM사업 시공이전단계 CM성과 저해요인 분석)

  • Han, Jae Hoon;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.17-26
    • /
    • 2017
  • The sustainable growth of Construction Management(CM) market depends on clients'acceptance from positive project outcomes of CM services. Achieving the positive outcomes requires CM firms'competency and efforts. Equally, it is critical to understand and overcome barriers of CM performance, which cause inefficiencies and under-performance of CM services. The objective of the study is to identify and discuss the barriers of CM performance during pre-construction stages in private CM projects based on the FMEA technique. Major findings basically suggest that clients and CM firms have roles to play, individually and collaboratively, in order to improve CM performance by eliminating performance barriers.