An Analysis on the Propriety of Labor Input at Design Stage in Construction Management  

An, Yang-Hoan (중앙대학교 건설대학원)
Kim, Young-Ai (중앙대학교 대학원)
Kim, Yong-Su (중앙대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.10, no.3, 2009 , pp. 32-41 More about this Journal
Abstract
In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.
Keywords
construction management; pre-design stage; propriety of manpower input;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 건설교통부 한국건설교통기술평가원(2003), '건설사업관리 업무 절차서'
2 유병기(외2인, 2006), 'CM 대가 산정방식의 문제점 분석에 대한연구' 건설관리, 제7권, 제6호 한국건설관리학회,pp132-139   과학기술학회마을
3 정재영, 윤태권(2006), '정부공사 건설 사업관리용역의 대가 산정에 관한연구' 제21호, 2006.09, 한국건축시공학회. pp115-122   과학기술학회마을   DOI
4 김대호(외3인, 2001), '건설사업관리비용 산정' 한국건설업연구원
5 한국건설기술연구원(2007), '공공사업에서 책임감리와 건설사업(CM)의 관계 정립을 위한 연구', 한국건설감리협회
6 PURDUE UNIVERSITY OFFICE OF THE UNIVERSITY ARCHITECT OUA Project Management Fee, Beginning July 1, 2006
7 전형철(2002), '건설사업관리의 제도정비와 공공사업적용에 대한 고찰' 감사논집 제7호, 감사원,pp113-116
8 김예상 (2007.4.) '건설사업관리 대가체계 개선방안', 한국건설관리학회, 건설회관 공청회의
9 건설교통부 고시 제2005-447호 건설기술관리법 제22조의4 제 2항 규정