Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.5.056

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project  

Park, Bo-sung (Department of Architectural Engineering, Chungbuk National University)
Kim, Ok-kyue (Department of Architectural Engineering, Chungbuk National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.5, 2022 , pp. 56-64 More about this Journal
Abstract
Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.
Keywords
CM at Risk; VE; Job Plan; Pre-Construction Phase; GMP;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Han, J.H. (2019). "Risk Factors to Implement CM at Risk Project." M.S. Dissertation, Department of Architectural Engineering, Hanyang University, pp. 14-44.
2 Kim, I.S. (2018). "Improvement Plans of VE Processes in Each Stage of a Construction Project." M.S. Dissertation, International School of Urban Sciences, University of Seoul, pp. 112-113.
3 Kim, M.S. (2014). "Improvement of Design VE Process Using the Quality Model by Construction Project Type." M.S. Dissertation, Department of Architectural Engineering, Namseoul University, pp. 25-29
4 Kim, Y. (2010). "Analysis of Performance by Case-Studies on Design VE." M.S. Dissertation, Dept. of Construction Management, Dong-A University, pp. 23-67.
5 Lee, C.J. (2017). "Benchmarking of Foreign General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness." M.S. Dissertation, Department of Architectural Engineering, Hanyang University, pp. 14-45.
6 Seo, H.H. (2018). "A Study on the Analysis and Improvement of Construction VE System." Ph.D. Dissertation, School of Architectural, Civil, Environmental and Energy Engineering, Kyungpook National University, pp. 58-102.
7 Shin, W.J. (2017). "BIM Application plan for Pre-con service delivery method and Road Map of BIM-based Design application for LH apartment projects." Journal of KIBIM, KIBIM, 7(1), pp. 81-82.
8 Son, M.J. (2008). "The Development of a Practicability Evaluation Model on VE Proposals using the Scenarios Planning and the Fuzzy Analytic Hierarchy Process." M.S. Dissertation, Department of Architectural Engineeringt, University of Seoul, pp. 28-29, 65-67.
9 Park, B.S. (2019). "A Study on the Bid Evaluation Method for Selecting CM at Risk Construction in Korea." M.S. Dissertation, Department of Architectural Engineering, Chungbuk National University, pp. 23-71.
10 Park, B.S., and Kim, O.K. (2021). "Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector." Korean Journal of Construction Engineering and Management, KICEM, 22(2), pp. 97-105.   DOI
11 Park, H.T., Park, C.S., and Jung, W.S. (2014). "A Study on the Improvement of the Design VE Process using VE Idea-DataBank System." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 28-38.   DOI