• Title/Summary/Keyword: 마감공기

Search Result 56, Processing Time 0.029 seconds

A Finish Material Management Process for Indoor Air Quality -Focused on Apartment Buildings- (실내 공기질을 고려한 마감자재 선정 프로세스 연구 -공동주택을 중심으로-)

  • Kwon, Gi-Deoc;Lee, Dong-Hoon;Lee, Sung-Ho;Zheng, Qi;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.123-130
    • /
    • 2010
  • Indoor air quality has attracted great attention in recent years and thus the importance of managing finishing materials in terms of pollutant source control is being emphasized. Managing the finishing material at the design stage maximizes the efficiency of IAQ control at the following construction stage. However, there are insufficient investigations on the application of a specific finishing material management process, a database management system or a finishing material management process network. As a result, the main purposes of this study comprise comprehensive evaluation of IAQ performance from the selected finishing materials and auxiliary materials, application of the material management system basing on the types and characteristics of toxic substances generated from the indoor finishing materials, investigation of IAQ evaluation standard, and the overall IAQ evaluation method for the design parts. The result of this study will be the basic data to construct DBMS for management of finishing materials with respect to IAQ.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

Evaluation of the Basic Properties of Materials for Application of Functional Plaster Mortar (기능성 미장 모르타르의 현장 적용을 위한 재료별 기초 물성에 관한 평가)

  • Cho, Do-Young;Kim, Gyu-Yong;Miyauchi, Hiroyuki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.152-160
    • /
    • 2012
  • The development of building must be accompanied with construction technology and performance of materials. In particular, wet processes have a high level of dependence on manpower and a low level of diversification of materials used. This study aimed to determine the applicability of various materials for wet process, mechanized construction and eco-friendly building materials through a comparison with dry premixed mortar. As a result, it was found that resin plaster and gypsum plaster's strength is lower than that of dry cement mortar, but their mechanization application, construction simplification, smoothness and bond strength are higher than that of dry cement mortar. And estimate that is valid as workability, bonding strength, eco-friendly building material in occasion of gypsum plaster.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Experimental Study on Formaldehyde Removal of Concrete by Using Activated Carbon and Functional Catalyst Materials (활성탄 및 기능성 촉매제를 이용한 콘크리트의 포름알데히드 제거에 관한 실험적 연구)

  • Yoon, Ki-Won;Lee, Joo-Hun;Choi, Myung-Hwa
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.729-732
    • /
    • 2008
  • Recently the attention against the indoor air quality that could affect health and comfort of building becomes intensively, the efforts for a problem solving is advanced with many sidedness. The research which it mixes the activated carbon and the functional catalyst materials that will be able to dissolve foul air absorbed by activated carbon in concrete with application technique of existing differently examined the basic physical properties and the removal ratio of formaldehyde so that it analyzed the effect of air purge. The test results in addition quantity increase of the activated carbon the slump showed the tendency which it decreased and the compressive strength appeared with no much difference. The test result removal ratio of formaldehyde was measured until the maximum 80%.

  • PDF

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

A Study on Status Survey for the Improvement of Shelter Facilities for Residents (주민대피시설의 성능개선을 위한 실태조사에 관한 연구)

  • Park, Namkwun;Kang, Shinwook
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.91-97
    • /
    • 2014
  • purpose of this study was to conduct status survey on existing shelter facilities for residents and use it as basic material to plan and design improved shelter facilities in the future. As the result, first, although existing shelter facilities are judged to have been designed in consideration only of the protection from high explosive shells, actual protection capability is significantly low against high explosive shells when exit direction and protection capabilities of main entrances were investigated. Second, all the 7 facilities did not have air purifier with filters installed for the air that flows into the inside from outside and since the height of air exhausts and intake pipes in the outside are also close to the earth, there are possibilities that heavy contaminated air can flow into the inside. Third, although some facilities have anti-explosion doors installed, it is impossible to use them as chemical, biological and radiological (CBR) shelter because of improper installation of openings and anti-explosion valves as well as poor plumbing that cannot ensure air-tightness and poor finish of piping penetration.

Sound Absorption Material Using Aluminum Sash (알루미늄 새시를 이용한 흡음구조)

  • Kim, Jung-Joong;Jeong, Jeong-Ho;Sohn, Jang-Yeul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.201-204
    • /
    • 2007
  • 다양한 공연장 및 대공간에서의 실내음향 제어를 위해서는 실내마감재료의 흡음 및 확산성능을 제어할 수 있는 재료가 필요하다. 본 연구에서는 이를 위해 알루미늄 새시를 이용한 흡음구조를 개발하였으며, 흡음특성을 조사하기 위하여 수직입사 흡음계수와 잔향실법 흡음계수를 측정하였다. 수직입사 흡음계수 측정결과 알루미늄 다목적 흡음재의 타공구조와 인서트에 의해 형성되는 공간이 공명형 흡음기의 역할을 하여 중.저주파수 대역의 흡음계수가 증가되는 것으로 나타났다. 잔향실법 흡음계수 측정결과 알루미늄 새시를 이용한 흡음구조의 형성에 따라 공명주파수 대역보다 낮은 중저주파수 대역의 흡음계수가 증가되는 것으로 나타났다. 공기층 증가에 따라 공명주파수 이상 대역에서의 흡음률은 증가되고 주파수 대역별 흡음계수 편차도 감소되는 것으로 나타났으며, 고주파수 대역의 흡음률 향상을 위한 방안이 필요한 것으로 나타났다.

  • PDF

TACT Modification Methods for Responding to Delay in Winter Season (동절기 공정지연 대응을 위한 TACT 공정 조정방안)

  • Kim, Dae-Kyu;Jeong, Yong-Joon;Lee, Jun-Ho;Moon, Hyun-Seok;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.125-126
    • /
    • 2011
  • Construction projects are being more complicated in proportion to the economic development. Process management is a critical issue in the construction that decides success of a project. Especially, a TACT method which divides and manages resources to repeat each activity is more important. Although becoming an issue dealing with the delay at winter season, it is not property developed. This paper suggests 'activity priority method' and 'TACT unit method' through case study. We validate necessity and efficiency of the TACT method through simulations and a survey. We expect cost reduction by decreasing unnecessary spending.

  • PDF

Strength Properties of Cement Matrix using Phytoncide (피톤치드를 혼입한 시멘트경화체의 강도 특성)

  • Kim, Hyeon-Sung;Kim, Sun-A;Park, Sun-Gyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.23-24
    • /
    • 2018
  • Most finishing materials are vulnerable to durability, humidity resistance and fire. And those products used formaldehyde to protect, during the manufacturing process. Also most finishing materials used adhesives to construction process indoor. All of these elements are major causes of releasing formaldehyde. In this study, concrete used by phytoncide was examined to remove the formaldehyde. As a result of the experiment, we found that compressive strength was increased and formaldehyde effectively removed by using mixture of cement matrix and phytoncide.

  • PDF