A Study on the Improvement of Cost Calculation Model of Recycling Treatment Facility for Estimation of Construction Waste Disposal Fee (건설폐기물 처리대가 산정을 위한 중간처리시설의 비용산정 모델 개선에 관한 연구)

  • Chang-Hak, Kim;Jun-Yeong, Lee;Hyo-Jin, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.135-144
    • /
    • 2023
  • LH Corporation uses the construction waste disposal fee standard, of which the model was developed a long time ago. Therefore, this model is problematic because it needs to reflect waste treatment facilities' technological development and environmental conditions. In this study, the estimated manpower and costs required for the process operation of waste treatment facilities were analyzed, followed by the proposed estimation criteria. This improved standard model can be used as a cost calculation standard for the recycling and treatment of construction waste in public institutions. The study also suggests that an increase in waste treatment costs is needed.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

Analysis of On-Site Inspection Results for Establishing Cost Estimation Standards for Selective Dismantling Projects (분별해체 대가기준 수립을 위한 현장실사 결과분석)

  • Heo, June Kyu;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.555-565
    • /
    • 2024
  • The government has enacted legislation to enforce selective dismantling in order to increase the recycling of construction waste. Therefore, this study aims to propose a standard quantity per unit estimation method, crucial for determining the expenses associated with large-scale demolition projects necessary for public development, particularly in the context of extensive land development ventures. Four individual houses were thoroughly examined and tested. We surveyed the house to create a floor plan and conducted a detailed investigation of interior materials in order to propose a Standard Quantity per Unit for cost estimation of the selective dismantling work. The process encompassed precise measurement of the houses, creation of schematics, thorough scrutiny of interior materials, and division of the dismantling process into components such as ceilings, walls, and floors. The duration of each dismantling task was meticulously documented. Particular emphasis was placed on refining the methodology to accommodate factors such as window openings, thereby ensuring a heightened level of precision compared to preceding studies. The outcomes of this study are anticipated to serve as practical benchmarks for estimating costs in demolition projects, thereby fostering sustainable development within the construction industry.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation (표준시장단가 공고시기 조정에 따른 영향분석 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

Forecasting and Prolonging Method of Optimum Economic Life for Office Buildings using Life Cycle Cost (LCC분석에 의한 오피스건축물의 최적경제수명추정분석 및 장수명화에 관한 연구)

  • Yang Bong-Seog;Jeong Hee-Cheol;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.135-143
    • /
    • 2001
  • The purpose of this study is to estimate and analyze the optimum economic life of office buildings in consideration of their LCC (Life Cycle Cost), and thereby, explore the ways to manage the outlived office buildings economically. In estimating the economic life, initial investment cost and maintenance cost are taken into due consideration. For this study, those office buildings in Yeouido and Mapo region were sampled. The surveyed details were reduced to unit area to calculate a unit value, and then, their optimum economic life was estimated using LCC. Five alternatives for management of outlived office buildings were compared in terms of reconstruction or rehabilitation cost.

  • PDF

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF

Development of Economic Analysis Indicators and Case Scenario Analysis for Decision-making support for Off-Site Construction Utilization of Apartment Houses (OSC 활용 의사결정 지원을 위한 경제성 분석 지표 개발 및 사례 시나리오 분석 - 공동주택 PC공법을 중심으로 -)

  • Yun, Won-Gun;Bae, Byung-Yun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.24-35
    • /
    • 2023
  • Recently, the Ministry of Land, Infrastructure and Transport presented the '6th Construction Technology Promotion Basic Plan' and 'Smart Construction Revitalization Plan (2022.7.20)'. Off-Site Construction (OSC), which involves construction and production of PC (Precast Concrete) and Modular, etc., has advantages in shortening the construction period, reducing costs, improving quality, reducing construction waste, and reducing safety accidents. However, the construction cost is high compared to the traditional RC construction method, which has hindered its utilization and spread. In this study, OSC utilization was improved. An economic analysis indicator and methodology that can support decision-making in the planning and design stages for multi-unit housing were proposed. The factors used in the economic analysis of OSC (based on the PC method) of apartment houses were reviewed. As for the indicators used in the cost and benefit section, 'Construction Period', 'Disaster Occurrence', 'Waste Generation', and 'Greenhouse gas Emission', which reflect the technical advantages of OSC, were derived. In addition, a scenario analysis was conducted based on actual apartment housing case data for the presented economic analysis indicators and benefit calculation standards. The level of benefit that offsets the difference between the existing RC construction method and the construction cost was reviewed. In future studies, it will be necessary to conduct additional case studies to apply the measurement criteria for detailed indicators and supplement the benefit indicators.