A study on the normal project duration development for the construction of multi-utility tunnel in the existing city  

Lee, Seong-Won (Department of Infrastructure Safety Research, Korea Institute of Civil engineering and building Technology)
Lee, Pil-Yoon (R&D Division, Unicons Co. Ktd)
Byun, Yo-Seph (Department of Infrastructure Safety Research, Korea Institute of Civil engineering and building Technology)
Cho, Choong-Yeun (R&D Division, Unicons Co. Ktd)
Lee, Min-jae (Department of Civil Engineering, Chungnam National University)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.19, no.12, 2018 , pp. 677-685 More about this Journal
Abstract
In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.
Keywords
Normal project duration; Schedule management; Multi-utility tunnel; Non-Working day; Unit schedule;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 S. W. Lee, Y. J. Sim, G. T. Na, "A fundamental study on the development of feasibility assessment system for utility tunnel by urban patterns", J. of Korean Tunn. Undergr. Sp. Assoc., Vol. 19, No. 1, pp. 11-27, January, 2017 DOI: https://doi.org/10.9711/ktaj.2017.19.1.011   DOI
2 Seoul Metropolitan Government, "A report of the feasibility and basic planning establishment for urban utility tunnel in Seoul", pp. 13-37, 2014
3 Y. K. Kang, I. C Choi, "Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis", Journal of Korean Society of Safety. Vol. 30, No. 5, pp. 29-36, October, 2015 DOI: https://doi.org/10.14346/jkosos.2015.30.5.29   DOI
4 Y. J. Sim, K. N. Jin, W. J. Oh, C. Y. Cho, "Optimal alternative decision technique of accommodation facility in multi-utility tunnel using VE/LCC analysis", J. of Korean Tunn. Undergr. Sp. Assoc., Vol. 20, No. 2, pp. 317-329, March, 2018 DOI: https://doi.org/10.9711/ktaj.2018.20.2.317   DOI
5 C. Y. Cho, Y. J. Sim, H. K. Kim, P. Y. Lee, M. J. Lee, "Analysis of importance by category for quantitative economic evaluation of multi-utility tunnel", J. of Korean Tunn. Undergr. Sp. Assoc., Vol. 20, No. 1, pp. 119-130, January, 2018 DOI: https://doi.org/10.9711/ktaj.2018.20.1.119   DOI
6 J. S. Chung, G. T. Na, "A study on the feasibility assessment model of urban utility tunnel by analytic hierarchy process", J. of Korean Tunn. Undergr. Sp. Assoc., Vol. 20, No. 1, pp. 131-144, January, 2018 DOI: https://doi.org/10.9711/ktaj.2018.20.1.131   DOI
7 Hanmiglobal. Construction Management A to Z. p.273-276, Bo Moon Dang, 2011.
8 Ministry of Land, infrastructure and Transport, "Activation of multi-utility tunnel (Phase 2)", pp. 15-51, 2008
9 S. K. Cha, "Dignified and Boggong Simultaneous construction tunnel shield method", Korea institute of science and technology information
10 K. C. Kim, "Bundang Han River Tunnel Shield TBM Design and Construction Case", Korea rail engineering association, No. 109, pp. 104-116, 2009