Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation

표준시장단가 공고시기 조정에 따른 영향분석 연구

  • 이주현 (한국건설기술연구원 건설정책연구소 공사비원가관리센터) ;
  • 백승호 (한국건설기술연구원 건설정책연구소 공사비원가관리센터)
  • Published : 2020.06.12

Abstract

Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

Keywords