Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

An Introduction of Development for Next Generation Logistics Management System in Construction Project (건설산업의 물류관리 체계 개선을 위한 차세대 지능형 건설 물류관리 시스템 개발 현황)

  • Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.99-105
    • /
    • 2008
  • For large-scale projects, supply chain management of construction materials is a key to a successful construction project. Inefficient management would cause significant loss in project cost, quality problems (and possible re-work), delayed delivery, claims, etc. On the other hand, efficient supply chain management system can reduce risks even the given project suffers from tricky details and frequent changes thanks to reduced material loss, shortened delivery time, and the quality outcome; this is a win-win situation for both clients and contractors. This paper presents a next-generation intelligent supply chain management system, which is intended to support large-scale construction projects such as urban high-rise buildings, as a strategic vision of the future construction logistics.

  • PDF

Cash flow Forecasting in International Construction Projects through Categorized Risk Analysis (특성별 리스크 분석을 통한 해외건설공사 현금흐름 예측에 관한 연구)

  • Yeom, Sang-Min;Han, Seung-Heon;Kim, Du-Yeon;Nam, Ha-Na;Park, Hee-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.295-300
    • /
    • 2006
  • In this research, risk factors which can raise project cost are identified in the initial stage and picked out through the decision maker's baseline. And also this probable risks are implemented to the project cash flow to estimate the contingency and to build a risk management system in the level of project. The risks that affect the projects profits were classified in two categories in the risk checklist. Firstly, financial risks derived from the external economic conditions for example exchange rate, escalation, interest rates etc. are analyzed through the stochastic methods, Monte-Carlo Simulation. Secondly, the project individual risks which are come from the project characteristics, for example country risk, clime, owner etc., are evaluated using the utility curve of the decision maker. Finally these risk analysis methods are used to forecast the actual project cash flow and final profit.

  • PDF

A Study on the Improvement of the Prefab Form Re-Bar Method (PF/R 공법의 문제점 분석을 통한 개선방안에 관한 연구)

  • Choi, Hyoung-Kyu;Suh, Jo-Seph;Park, Keun-Joon;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.377-380
    • /
    • 2007
  • Formwork is a very important work in the construction. Various research and development about formwork has been going on, many methods are developed. And the effort to reduce the cost has been progressed at oversea. And a lot of attempts have been in motion in domestic field. But the systematic researches to apply to field are scarced. So, some problems pointed out at the stage of application. Therefore through comparison analysis of other formwork problems are derived and it's solution were suggested in this study.

  • PDF

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.