Jeon, Sang-Hoon (서울시립대학교 대학원 건축공학과)
Koo, Kyo-Jin (서울시립대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.2, 2008 , pp. 182-189 More about this Journal
Abstract
In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.
Keywords
apartment concrete work; labor productivity; Standard Quantities per Unit; actual labor quantities;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 이준성. (2006). '유사프로젝트 실적자료 분석을 통한 월간 투입비용 예측모델 알고리즘의 전산화구축에 관한 연구', 대한건축학회논문집 구조계, 22(6), 173-182
2 최현하, 이준복. (2003). '단위작업 물량 달성율과 투입 노 무량을 이용한 진도율 산정 방법에 관한 연구', 한국건설관 리학회논문집, 6(1), 1-8
3 FMI. (1999). U. S. Construction Industry Training Report, FMI Corp
4 손용석, 심인보, 권재성, 전상훈, 현창택, 구교진. (2006). '실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모 델', 한국건설관리학회논문집, 7(5), 85-93   과학기술학회마을
5 건설연구원. (2005). '건설공사 표준품셈', 건설연구원
6 고종철, 김옥규, 서상욱, 이찬식, 김문한. (1991). '우리나라 공동주택공사의 노무량 예측모델 개발에 관한 연구', 대한 건축학회학술발표논문집, 11(2), 631-636
7 전재열. (2002). '실적자료 분석에 의한 건축공사비 산정방 법 적용에 관한 연구', 대한건축학회논문집 구조계, 18(4), 121-128
8 김예상. (1994). '건설 생산성에 영향을 미치는 요인분석에 관한 연구', 대한건축학회논문집, 10(10), 267-273
9 Barraza, G. A., Back, E. and Mata, F. (2000). 'Probabilistic Monitoring of Project Performance Using SS-Curves', Journal of Construction Engineering and Management, ASCE, 126(2), 142-148   DOI   ScienceOn
10 대한주택공사. (1994). 공법별 노무량 조사분석, 대한주택 공사, 연구 94-24
11 Barrie, D.S. and Paulson, B.C. (1992). Professional Construction Management, McGraw-Hill