Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management  

Kim, Yongpyo (Samsung Construction Company)
Lee, Yongjun (Department of Civil Engineering, Chungnam National University)
Lee, Minjae (Department of Civil Engineering, Chungnam University)
Publication Information
Korean Journal of Construction Engineering and Management / v.18, no.5, 2017 , pp. 32-40 More about this Journal
Abstract
Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.
Keywords
Work Package; Progress Management; Work Breakdown Structure; Field Schedule Management;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Business Roundtable (1987). "Measuring productivity in construction" A Construction Industry Cost Effectiveness Project Report.
2 CAK (2015). "Results of IPO (Initial Public Offering) companies performance analysis in the first quarter of 2015"
3 Choi, J., and Kim, Y (2013). "An Analysis of Core Competency of Construction Field Engineer for Cost Management" Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 26-34.   DOI
4 Joo, S., Park, M., Lee, H., and Lee, K (2015). "TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR)" Korean Journal of Construction Engineering and Management, KICEM,, 16(3), pp. 36-45.   DOI
5 Kang, I (2007). "CM and construction IT" Munundang.
6 Kang, J., Lee, D., Park, J., and Lee, M (2012). "A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge" Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 3-11.   DOI
7 Kim, J. (2015). "Processing project like Progress Management" Let's Book.
8 Ko, Y., Cha, H., Shin, D., and Kim, K. (2012). "Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance" Korean Journal of Construction Engineering and Management, KICEM, 13(1), pp. 3-13.   DOI
9 Lee, Y., Lee, H., and Jung, D. (2012). "EVMS Development in Daerim Industrial" Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 12-16.   DOI
10 Lee, Y., and Lee, M. (2016). "A Study on Estimating of Probability Distribution and Mean Life of Bridge Member for Effective Maintenance" Journal of Construction Engineering and Management, 17(4), pp. 57-65.
11 Oglesby, C., Parker, H., and Howell, G. (1989). "Productivity improvement in construction" McGraw-Hill, New York, N.Y.
12 Olli Seppänen, Glenn Ballard and Sakari Pesonen (2010). "The combination of Last Planner System and Location-Based Management System" Lean Construction Journal, pp. 43-54.
13 Park, H. (2007). "Construction progress management operation practice" Goomibook.
14 Park, S. (2010). "A Study on the building of Project Management System in Construction Project Using Earned Value Management System" Hanyang University Master Thesis.
15 P. P. Zouein, and I. D. Tommelein (2001). "Improvement Alegorithm for Limited Space Scheduling" Journal of Construction Engineering and Management, 1 27(2), pp. 116-124.   DOI
16 Rhuta Joshi, Prif. and V. Z. Patil (2015). "Resource Scheduling of Construction Project: Case Study" International Journal of Science and Reserch (IJSR) 4(5), pp. 563-568.
17 Samoo C.M (2011). "Construction Management Handbook"
18 Yoon, Y., Suh, S., Jang, G., and Choi, J. (2013). "Improvement of Cost-Schedule integration based Progress Management through PMIS" Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 144-151.   DOI
19 Shivani sakre, Prof.Abhijit. and N. Bhirud (2015). "Planning and Scheduling in Construction through Model Approach" International Journal on Recent and Innovation Trend Computing and Communication, 3(5), pp. 3029-3031.
20 Yoon, B., Lim, C., Yoo, J., and Kim, C. (2008). "The Survey of Time Management Status in the Domestic Construction Site" KICEM Conference 2008, p. 916.