1 |
Hwang, Y. S (2004). "Automatic Quantity Takeoff form Drawing Through IFC Model", Journal of the architectural Institute of Korea Planning&Design, 20(12), pp. 89-97.
|
2 |
Ji, S. J. (2001). "A Study on the Developing of Life Cycle Cost Analysis System for Buildings", MS thesis, Univ. of Mokwon, Korea.
|
3 |
Ji, S. K. (2013). "Improvement of Life Cycle Cost Evaluation in Technical Proposal Tendering", MS thesis, Univ. of Seoul, Korea.
|
4 |
Kehily, D., McAuley, B., and Hore, A. (2012). "Leveraging Whole Life Cycle Costs When Utilising Building Information Modelling Technologies", Internaltional Journal of 3-D Information Modelling, 1(4), pp. 40-49.
|
5 |
Kim, D. H (2012). "Development of LCC Calculation Model for Residential Building based on BIM", MS thesis, Univ. of Seoul, Korea.
|
6 |
Kim, I, H., Um, S. G., and Choi, J. S. (2015). "A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work", Transactions of the Society of CAD/CAM Engineers, 20(2), pp. 182-192.
DOI
|
7 |
Kim, K. R., Yu J. H., and Kim, I. H. (2015). "Methodology for Generating Information Requirements for BIM-based Building Permit Process", Transactions of the Society of CAD/CAM Engineers, 20(1), pp. 1-10.
DOI
|
8 |
Kim, K. R., and Yu, J. H. (2015). "Integrated Information Management for Composite Object Properties in BIM", Korean Journal of Construction Engineering and Management, KICEM, 16(2), pp. 99-105.
|
9 |
Lee, M. H. (2009). "A Study on the Establishment of Optimum Maintenance Levels of Educational Facilities", Doctor of Philosophy, Univ. of Mokwon, Korea.
|
10 |
Park, G. T. (2011). "A Study on a BIM-based Structure Life Cycle Cost Calculation Process", MS thesis, Univ. of Kyunggi, Korea.
|
11 |
Seo, H. D. (2011). "Development of a BIM-based LCC Analysis Process-focused on the Exterior Skin System for Buildings-", MS thesis, Univ. of Ajou, Korea.
|