• Title/Summary/Keyword: specialized construction industry

Search Result 89, Processing Time 0.024 seconds

A Study on Differentiation and Improvement in Arbitration Systems in Construction Disputes (건설분쟁 중재제도의 차별화 및 개선방안에 관한 연구)

  • Lee, Sun-Jae
    • Journal of Arbitration Studies
    • /
    • v.29 no.2
    • /
    • pp.239-282
    • /
    • 2019
  • The importance of ADR(Alternative Dispute Resolution), which has the advantage of expertise, speed and neutrality due to the increase of arbitration cases due to domestic and foreign construction disputes, has emerged. Therefore, in order for the nation's arbitration system and the arbitration Organization to jump into the ranks of advanced international mediators, it is necessary to research the characteristics and advantages of these arbitration Organization through a study of prior domestic and foreign research and operation of international arbitration Organization. As a problem, First, education for the efficient promotion of arbitrators (compulsory education, maintenance education, specialized education, seminars, etc.). second, The effectiveness of arbitration in resolving construction disputes (hearing methods, composition of the tribunal, and speed). third, The issue of flexibility and diversity of arbitration solutions (the real problem of methodologies such as mediation and arbitration) needs to be drawn on the Arbitration laws and practical problems, such as laws, rules and guidelines. Therefore, Identify the problems presented in the preceding literature and diagnosis of the defects and problems of the KCAB by drawing features and benefits from the arbitration system operated by the international arbitration Institution. As an improvement, the results of an empirical analysis are derived for "arbitrator" simultaneously through a recognition survey. As a method of improvement, First, as an optimal combination of arbitration hearing and judgment in the settlement of construction disputes,(to improve speed). (1) A plan to improve the composition of the audit department according to the complexity, specificity, and magnification of the arbitration cases - (1)Methods to cope with the increased role of the non-lawyer(Specialist, technical expert). (2)Securing technical mediators for each specialized expert according to the large and special corporation arbitration cases. (2) Improving the method of writing by area of the arbitration guidelines, second, Introduction of the intensive hearing system for psychological efficiency and the institutional improvement plan (1) Problems of optimizing the arbitration decision hearing procedure and resolution of arbitration, and (2) Problems of the management of technical arbitrators of arbitration tribunals. (1)A plan to expand hearing work of technical arbitrator(Review on the introduction of the Assistant System as a member of the arbitration tribunals). (2)Improved use of alternative appraisers by tribunals(cost analysis and utilization of the specialized institution for calculating construction costs), Direct management of technical arbitrators : A Study on the Improvement of the Assessment Reliability of the Appraisal and the Appraisal Period. third, Improvement of expert committee system and new method, (1) Creating a non-executive technical committee : Special technology affairs, etc.(Major, supports pre-qualification of special events and coordinating work between parties). (2) Expanding the standing committee.(Added expert technicians : important, special, large affairs / pre-consultations, pre-coordination and mediation-arbitration). This has been shown to be an improvement. In addition, institutional differentiation to enhance the flexibility and diversity of arbitration. In addition, as an institutional differentiation to enhance the flexibility and diversity of arbitration, First, The options for "Med-Arb", "Arb-Med" and "Arb-Med-Arb" are selected. second, By revising the Agreement Act [Article 28, 2 (Agreement on Dispute Resolution)], which is to be amended by the National Parties, the revision of the arbitration settlement clause under the Act, to expand the method to resolve arbitration. third, 2017.6.28. Measures to strengthen the status role and activities of expert technical arbitrators under enforcement, such as the Act on Promotion of Interestments Industry and the Information of Enforcement Decree. Fourth, a measure to increase the role of expert technical Arbitrators by enacting laws on the promotion of the arbitration industry is needed. Especially, the establishment of the Act on Promotion of Intermediation Industry should be established as an international arbitration agency for the arbitration system. Therefore, it proposes a study of improvement and differentiation measures in the details and a policy, legal and institutional improvement and legislation.

A study on the development method of the domestic sewing industry for the re-vitalization of K-fashion (K-패션 활성화를 위한 국내 패션봉제산업의 발전 방향성 제고)

  • Kim, Hee-Sun;Ahn, Young-Sill
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.21 no.4
    • /
    • pp.181-194
    • /
    • 2019
  • The purpose of this study is to analyze the problems associated with the domestic fashion sewing industry and suggest solutions for re-development. The research methods are a content analysis of literature, including articles and reports, and interviewing practitioners who are in charge of the fashion industry. The problems of the domestic fashion sewing industry are as follows. 1. Weakness in price competitiveness and a lack of work. 2. Aging of workers and difficulty securing new workers. 3. The age of the production facilities and the lack of manpower required for mass production. 4. Unrealistically low cost of labor due to over-competition considering the lack of work.5. The prevalence of illegal label grinding. The solutions to the problems listed above are as follows. 1. Establishment of a win-win effort between fashion brands and sewing companies. 2. Allow systematic education, support, and development of a meister system for fostering sewing manpower. 3. Undertake efforts to improve the sewing work environment. 4. Establishment of the system for realizing the actual cost of labor. 5. Establishment of a quota system to secure domestic sewing production. 6. Construction of Smart DB to connect work orders. 7. Construction of a smart factory using technology such as automated systems of production suitable for the 4th Industrial Age. 8. Enforcement of specialized strategies to encourage fashion sewing companies, not only Seoul but also in other urban areas.

A Study on Safety Inspection Model for Small Scale Construction Field (중.소규모 건설현장 안전점검 모질 연구)

  • 안병수;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.11-21
    • /
    • 2001
  • Domestic construction industry has considerable level of construction performance and technology thanks to the economic development and as the result of performing diverse oversea construction project. However, construction disasters have been steadily increasing, and do severe disasters at faster pace. Most of such disasters happen at small and small medium-sized construction fields, which contract size is less than 10 billion won. small and medium-sized construction fields are not obliged to designate a safety manager, and have limitations in engaging self-regulating disaster prevention activities due to reduced budget for safety facilities. For the small and medium-sized construction sites with less than 10 billion won, the Ministry of Labor has been carrying out mobile inspections of construction safety. However, the effect so far is insignificant and an improvement plan is required. Therefore, in the present thesis, we derive problems appearing in the current construction safety mobile inspection system, investigate and study systems in foreign countries, and suggest an efficient and effective plan to operate safety technology inspections. First of all, we establish a standard to select sites to be inspected that are high in construction risk and disaster occurrence probability In addition, we suggest a plan to take administrative and judiciary measures based on the total score for disaster factors considering the disaster occurrence probability and the illegal practices. Furthermore, a scheme to maximize the effect of disaster prevention is sought by building an organic cooperative system between the Ministry of Labor, Korea Occupational Safety & Health Agency and other organizations specialized in instruction of construction disaster prevention. Finally, we induce a research conclusion that leads to self-regulating safety management through checking and instructing systematic management on mobile inspections.

  • PDF

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

Development of Construction Management Performance Checklists Using Analytic Hierarchy Process(AHP) (AHP 기법을 이용한 건설사업 단계별 CM업무 체크리스트 개발)

  • Lee, Tai-Sik;Jun, Young-Joon;Kim, Young-Min;Kwak, Doung-Koo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.342-346
    • /
    • 2006
  • As the construction industry gets specialized and complicated gradually, the number of participating organizations increased, and also the necessity of construction management(CM) is getting bigger because construction scale is becoming bigger. However, in spite of the increase in necessity, its activation through performance measurement and evaluation is very insufficient compared with advanced countries. Therefore, a checklist for CM by construction stage using AHP method in the current study is for efficient CM for successful completion of a project by dividing CM affairs by construction stage and checking performance degree by stage. If the CM checklist by construction stage, the final result of the study, is used by all the parties concerned such as construction managers, orders, designers, constructor, etc., it will be possibile to improve work efficiency of project management and produce a final outcome corresponding to the goals of a project.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Development and Utilization of High Fluidity Concrete (고유동 콘크리트의 개발 및 활용)

  • Choi, Yun-Wang;Jeong, Jae-Gwon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1109-1112
    • /
    • 2008
  • Concrete structure is recognized as the universal structuring material for its outstanding formability, economic efficiency, and strength development. However, as the ageing of field workers and the deficiency of skilled workers due to evasions from 3D business have recently become the major issues of the industry in Korea and as the materials are becoming more diversified and complicated for today's concrete structures are becoming higher, larger, and specialized, the need for practicality of construction work based on new technology and new method has greatly increased. Therefore, the overall condition of today's construction business requires researches and developments on the high fluidity concrete for higher construction efficiency and quality improvements. With this reason, this study investigated study development tendency and development situation of the high fluidity concrete, arranged experiment performance, and domestic or international specification used in performance valuation of the high fluidity concrete.

  • PDF

Policy Evaluation and Improvement Plan of Overseas Construction Engineering Industry (해외 건설엔지니어링산업의 정책평가 및 개선방안)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.375-384
    • /
    • 2018
  • Due to the downturn in the local construction business, entry into the overseas markets has been regarded as one of the core tasks of the building sector and the government. Thus, entry into overseas markets, not only by large and middle-standing enterprises, but also by small and medium sized enterprises, has recently become a major construction policy. Therefore, this study identified and evaluated overseas construction support policies in the field of construction engineering, ranked them as the policies for developing market development funds, fostering and educating expert workers, and supporting the provision of information on winning orders. Through these policy assessment results, the study proposed improvement measures from the government and from the business side. As for the government viewpoint, a measure of providing information suited to engineers in design companies, project manager (PM), construction manager (CM), a measure of producing skillful workers through the expansion of education support policies, and the promotion of specialized overseas workforce in the construction engineering sector were proposed. In the construction engineering industry, this study suggested measures for securing global expert manpower, sharing performance of overseas construction market development project, strengthening construction project management capacity, and strengthening risk management.

Forecasting the Changes in Construction Market by Analyzing General·Specialty Contractors' Perception on Business Area Abolition (종합·전문건설사업자의 상호시장진출 의향 및 참여방식 분석을 통한 종합·전문간 업역철폐에 따른 건설시장 변화 예측)

  • Kim, Sung-Il;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.88-97
    • /
    • 2023
  • The purpose of this study is to forecast future changes in the construction market following the reorganization of the construction production system by analyzing the possible market size in which general contractors and specialty contractors may participate in each other, and by carrying out a survey. The ratio of correlation between general construction and specialty construction industries was derived by analyzing the relevance of work area of general contractors and specialty contractors, the similarity of registration standards, and the market in which general contractors and specialty contractors may be able to mutually participate. In order to overcome the limitation of previous studies which analyze the changes in construction market based on the statistical data, and to analyze in more detail the impact of reorganization of construction production system from market participants' view, a survey targeting general contractors and specialty contractors for their willingness and method of participating in the mutual market was conducted. As a result of the survey, it was found that 52% of general contractors were willing to participate in the specialized construction market and 55.1% of specialty contractors were willing to participate in the general construction market. It was found that there was a high willingness to participate in the earthworks, reinforced concrete works, facility maintenance and management, water and sewage facility works, and interior works, and high competition is expected for projects with a scale of 500 million to less than 3 billion won. Through this study, it will be possible for general and specialty contractors to understand the changes in the construction market due to the reorganization of the construction industry production system, and to respond effectively to these changes.