• Title/Summary/Keyword: placing concrete temperature

Search Result 70, Processing Time 0.024 seconds

Hydration Heat Analysis of Coping With Ambient and Placing Concrete Temperature (교각 코핑부의 외기온도와 타설온도에 따른 수화열 해석)

  • Yang, Joo-Kyoung
    • Journal of the Korea Computer Industry Society
    • /
    • v.9 no.3
    • /
    • pp.99-104
    • /
    • 2008
  • The thermal stresses due to hydration heat in massive concrete structures are affected by ambient temperature and placing concrete temperature. It is needed to predict the thermal stresses considering ambient temperature and placing concrete temperature. In this study, hydration heat analyses of coping were carried out. After the maximum tensile stress was occurred at 2,75 days the crack index was increased. Therefore the possibility of crack occurrence was rare. The possibility of crack occurrence can be reduced by placing concrete temperature drop. Therefore some method to drop the placing concrete temperature may be effective to reduce the possibility of crack occurrence.

  • PDF

An Effect on Early Temperature of Placing Concrete Affecting Compressive Strength of Concrete (콘크리트 타설 초기온도가 압축강도에 미치는 영향)

  • Park, Dae-Oh;Park, Young-Shin;Park, Jae-Myung;Gang, Yeon-Woo;Jun, Byung-Chea
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.641-644
    • /
    • 2008
  • The strength of concrete is developed by cement hydration reaction influenced by the circumferential temperatures. In this study, therefore, the experiments are conducted and evaluated about the characteristics as changes of early concrete placing temperature and curing temperature to understand the effects of the temperature which influences concrete properties. The results of the experiments changing the early concrete placing temperature in 5$^{\circ}C$ and 10$^{\circ}C$ are followed. In case of conducting standard concrete curing, early compressive strength development rate of the concrete which had low placing temperature was low, but it was shown that early compressive strength development rate was not affected by low placing temperature in age 28 days of concrete. In case of conducting outdoor curing in winter, early compressive strength development rate of the concrete which had high placing temperature was high in all test specimens. As a results, early compressive strength development of concrete was influenced by temperature of early concrete, but after aging 28 days of concrete, it was influenced by curing temperature rather than temperature of early concrete.

  • PDF

Investigation on the Applicability for Method of Setting Time Difference by Super Retarding Agent for Reducing Hydration Heat of Transfer Girder Mass Concrete (전이보 매스콘크리트의 수화열저감을 위한 초지연제 응결시간차 공법의 적용가능성에 대한 검토)

  • Yoon Seob;Hwang Yin Seong;Baik Byung Hoon;Han Cheon Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.128-131
    • /
    • 2004
  • This paper is to investigate the mock up test results of mass concrete for transfer girder using setting time difference with super retarding agent(SRA) to reduce hydration heat. According to test results, the temperature history of plain concrete without placing lift had a steep rising curvature, and plain concrete had a big temperature difference between surface and middle section of mass concrete, which may result in occurrence of temperature crack. However, considering placing method B, because setting time of middle section concrete was retarded with an increase in SRA contents, higher hydration heat temperature was observed at surface section concrete compared with that at middle section concrete at early age, which can lower the possibility of hydration heat crack. In case of placing method C, although peak temperature of hydration heat was much lower, at early age, high crack occurrence possibility of the hydration heat attributable to the big temperature difference between middle section and bottom section of concrete was expected at bottom section concrete. Therefore, the structure above the ground like transfer girder is not applicable to consider the placing method C.

  • PDF

Mock-up Test on the Reduction of Hydration Heat of Mass Concrete for Transfer Girder (전이보 매스콘크리트의 수화열 저감에 관한 Mock-up 실험)

  • Yoon Seob;Hwang Yin Seong;Baik Byung Hoon;Han Cheon Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.707-710
    • /
    • 2004
  • This paper reported the results of mock-up test on mass concrete for transfer girder using setting time difference of super retarding agent(SRA). According to test results, two mock-up structures were made. Plain concrete without placing layer reached maximum temperature after 24hours since placement and caused surface hydration cracks at top section. However, concrete with placing layer reached maximum temperature after 72hours and surface temperature was higher than center temperature, which did not cause surface crack. After form removing, no crack was observed at side surface of plain concrete, while concrete using SRA at mid section had surface scaling and settling crack. According to coring results, concrete with placing layer had a penetration crack from top section to bottom section. Therefore, the setting time difference method to reduce hydration heat will have difficulty in applying the mass concrete for transfer girder.

  • PDF

Experiments on Mechanical Characteristics of Anti-Washout Concrete with Mixing and Placing Condition (배합 및 타설조건에 따른 수중불분리성 콘크리트의 역학적특성 변화에 관한 실험)

  • Yang, Eun-Ik;Choi, Hong-Shik;Heo, Gweon;Lee, Si-Woo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.141-146
    • /
    • 1999
  • An experimental study is carried out to estimate the effects of mixing and placing condition on the mechanical properties of anti-washout concrete. According to the test results, mixing method and placing temperature do affect the characteristics of rrsh concrete, while they do not affect the strength development of anti-washout concrete. But, concrete strength was greatly affected by the placing condition and placing height. Concrete strength decreases linearly as the placing height increased. Compared to the normal concrete, the increase in strength is not associated much with an increase in the elastic modulus of anti-washout concrete.

  • PDF

Influence of Environment and Construction Factor on the Bleeding of Concrete (콘크리트의 블리딩에 미치는 환경 및 시공요인의 영향)

  • 황인성;김기정;나운;김규동;한천구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.65-68
    • /
    • 2003
  • This study is intended to look into the influence of environment and construction factor on bleeding of concrete. According to the results, as wind is light, relative humidity is high and temperature is low, the amount of bleeding increases greatly, and evaporation speed is influenced greatly by order of wind, temperature and humidity. As the properties of bleeding by construction factor, the amount of bleeding increases with an increase of placing thickness, but the bleeding ratio, the amount of bleeding per unit volume, increases with a decrease of the placing thickness. Bleeding speed is fastest at about 90 minute after placing concrete. Also, as wind is light, relative humidity is high, temperature is low and the placing thickness is thick, bleeding speed grow faster.

  • PDF

Study on the mix proprotion and the thermal crack of Ultra High Strength Concrete (초고강도 콘크리트의 배합 및 온도균열에 대한 연구)

  • Moon, Han-Young;Kim, Byoung-Kwon;Son, Young-Hyun;Kang, Hoon;Kim, Jeong-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.265-268
    • /
    • 1999
  • In this study, we manufactured the ultra-high strength concrete using mineral admixture which is easily workable. From the test results of compressive strength, It is concluded that the proper replacement ratio of silica fume should not exceed to 10% and the replacement of slag is more effective that the replacement of fly ash to gain very high compressive strength. Thermal stress analysis is conducted to find the way of controlling the thermal crack of ultra-high strength concrete. As results of thermal stress analysis, it was found that reducing placing temperature of concrete(pre-cooling) is effective to reduce thermal crack and placing concrete in high air temperature is more effective than placing concrete in low air temperature.

  • PDF

Hydrate Heat Analysis for the Determination of Optimized Thickness in Mass Concrete (매스 콘크리트의 적정 타설높이 산정을 위한 수화열 해석)

  • 신성우;이광수;유석형;김선호;황동규;박기홍
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.385-390
    • /
    • 2001
  • The thermal crack in mass concrete is mainly due to the difference of concrete temperature, which is generated by hydration heat of cement. As the thickness of mat foundation increases, the difference of temperature becomes bigger. The purpose of this study is to estimate the optimum placing depth. The temperature of real mat foundation was observed and the thermal analysis by Finite Element Method was executed. Finally, the crack index according to the placing depth was estimated.

  • PDF

Influence of Mixing and Construction Factor on the Bleeding of Concrete (콘크리트의 블리딩에 미치는 배합 및 시공요인의 영향)

  • 황인성;김경민;전충근;신병철;한천구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.265-268
    • /
    • 2002
  • This study is focused on the influence of mixture and construction factor on bleeding amount of concrete According to the results, Amount of bleeding with mixture factor increases with increase of water contents and W/C. Amount of bleeding with construction factors is larger in the case of placing height of 1m than in the case of placing height of 0 and 0.5m. Amount of bleeding is larger at the temperature of 20℃ than at the temperature of 35℃ and 5℃, and increases in order of vibration compacting, standard lamping and non tamping. Therefore, to reduce bleeding, it is thought that it is profitable to reduce water content within the range that fluidity and workability don't go bad, to lower the placing height and not to do compacting too much.

  • PDF

Temperature Rise of Steel bars Located in a Gang Form Before Placing Concrete During Hot Weather Condition (서중환경시 갱폼 거푸집 내부 철근의 온도변화)

  • Kim, Kyoung-Hoon;Son, Ho-Jung;Lim, Chun Keun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.11-12
    • /
    • 2012
  • This study investigates the temperature rise of reinforcement bars located in the middle of the form (for reinforcement concrete) during hot weather condition. The temperature was measured for three consecutive days before placing concrete. Test results showed that the temperature started to increase at 7:00 AM before sun rised, and peaked at around 2:00 PM. It was found that the thinner the diameter of a reinforcement bar, the higher is the speed of temperature rise and drop of the bar. The peak level of temperature for D13, D19, D25 and D32 was 54.4℃, 55.2℃, 56.4℃ and 60.2℃, respectively.

  • PDF