Journal of Korean Tunnelling and Underground Space Association
/
v.3
no.3
/
pp.3-13
/
2001
The behavior of the masonry lining is studied to gain basic information on how to reinforce the masonry tunnels. Apart from the previous works on the masonry structures, the multi-course masonry structure, realistic in field condition, is considered and the constitutive relationship of the masonry is, therefore, established. The design charts of the orthotropic material properties are proposed according to the stiffness ratio and the crack initiation and subsequent propagation model is also considered to model the brittle nature of the masonry. A numerical analysis on the masonry panel is investigated to verify the proposed model and future works of the masonry lining are briefly explained.
Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.119-120
/
2015
Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.
Altin, Sinan;Kuran, Fikret;Anil, Ozgur;Kara, M. Emin
Structural Engineering and Mechanics
/
v.30
no.6
/
pp.651-664
/
2008
The purpose of this study is to develop a rehabilitation technique for heavily earthquake damaged masonry buildings. A full scale one storey masonry building with window and door openings was manufactured and tested on the shock table by applying increased amplitude free vibration up to the point where heavy earthquake damage was observed. Damaged test building was rehabilitated with vertical and diagonal steel straps and then tested again. The effectiveness of improvements obtained by the rehabilitation technique was investigated. Steel straps improved the lateral strength and stiffness of masonry walls and limited the lateral displacement of building. Stability of the masonry walls were also improved by the steel straps. Steel straps reduced the natural period of the earthquake damaged masonry building and prevented the failure of the building at the same amplitude of free vibration.
The concept design of the typha strawbale masonry came up as a result of the urgent demand for a means of constructing sustainable buildings, both in rural and urban settlement, not only suitable for dwellers but for keeping farm products by structures that will respond to the environmental eco-system, coupled with the fact that such structures are also affordable, durable and easy to maintain during their service period. The effects of contact between plaster and the stacked strawbale of a masonry needs to be established and design optimization for durability and stability of the masonry be obtained. The assessment will involve the application of plaster materials (cement and natural earth) to the wall specimen panels. Past works have shown that plastered strawbale walls have adequate resistance against the appropriate vertical loads, and further showed that the earth plaster can bear higher stress than the cement plastered straw bale. There is the implication that the collapse or response of the earth-strawbale wall is significantly higher compared to that of cement-strawbale from other straw-based masonries. Therefore the allowable stresses of plastered typha strawbale shall be predicted for their optimum values using SAP2000. The stress stability of each masonry is obtained by analytical model using the best fit variables for the wall height and thickness.
Journal of the Korea institute for structural maintenance and inspection
/
v.13
no.5
s.57
/
pp.133-141
/
2009
50 year-old masonry buildings which had been constructed using lime mortar have caused lots of problems because of using different material, cement mortar, when they repair them. Also, there is little information on structural capacities and details of masonry buildings built using lime mortar. In addition, it is difficult to evaluate the structural capacities of the buildings which were often constructed by untrained labors. To preserve the original masonry construction, the study on their construction materials and methodologies has to be carried out. This paper provides basic information for establishing standard details of masonry works using lime mortar in order to overcome these problems when cultural properties are repaired or retrofitted. To do this, compression tests of lime mortar were preformed with the parameters of mixing ratios, mixing material, curing time and curing conditions etc. Based on the test results, the differences between lime mortar and cement mortar were specified and the structural characteristics of lime mortar were also presented in this paper.
Journal of the Korea institute for structural maintenance and inspection
/
v.9
no.3
/
pp.101-110
/
2005
In Seoul, structural deterioration is severe in the private masonry buildings which have been built since 1906s. But most of these structures remain without any repair works. As a result, the rate of deterioration is getting faster and these dangerous structures may cause hazardous circumstances to the adjacent structures and neighborhood. The purpose of this study is to investigate the actual conditions of wall cracks among the defect types which occur in private masonry buildings and to analyze the correlation between safety grades and wall cracks for offering the fundamental data. Using these date we can establish basic criteria for safety grades of structures and improve the quality of masonry buildings. The result of this study indicate that there are high correlations between safety grades and the width of crack but much less so with the length. Furthermore, with regard to crack patterns, vertical cracks much more negatively effected the safety grades.
Journal of the Korea Institute of Building Construction
/
v.15
no.1
/
pp.81-87
/
2015
The purpose of this study is to analyze the problem of confusing the names of Chinese granite used in Korean construction work and suggest the improvement plans for them. Interviews of the experts from the stone company, studies on the existing research literature, and analyses of construction work documents of the 23 construction works which used Chinese granite were carried out to analyze the real condition of name confusion of granite stone. In the analytical result of the real condition, name confusion was classified into 4 types and problems derived from it were done into 4 ones. An additional survey was carried out targeting 34 masonry experts to draw the improvement plans based on the analytical results of the real condition of name confusion. The results show that the most fundamental solution is to continue to make efforts to use exact names when main agents related to construction works communicate with each other regarding Chinese granite stone and the process to make out construction contract documents.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.110-118
/
2015
The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.
Seo, Byung-Soo;Kim, Sei-Cheon;Lee, Chang-Heon;Park, Choung-Min;Lee, Kyu-Wan
Journal of the Korean Institute of Landscape Architecture
/
v.18
no.3
s.39
/
pp.39-56
/
1990
The purpose of this study is to analyze the roadside slope of mountainous Parkway. 48 sites were selected by Random Ranking Sampling. This study was researched on the slope condition with the cause of occurrence, the situation of fundamental engineering works and vegetation on slopes. The main results of this research are summarized as follow ; 1. Slope shapes are shown nine types in cut slope and four types in fill slope. 2. Generally, fill slopes are larger than cut slopes in slop area. 3. Grade is more steep than standard grade. 4. Main engineering works, which constructed for slope stability, are terracing, side-ditch wall, channel, concrete trellis works and wire fence. 5. Roundabout channel were many constructed within the sector of Ukmojeong-Deokdong, but were few constructed within the sector of Banseon-Seongsam pass and Cheoneun Temple-Seongsam pass. 6. Most. of side-ditch wall were constructed of concrete and wet-masonry. 7. In vegetation works, many exterior species were selected. 8. Planting pattern was not combinated with the national park landscape.
The purpose of this study is to analyze paejang system of the castle constructions In the late period of Chosun dynasty. Moreover, this study aimed to examine effects and influences of its constructional productivity. The results are as follow; 1. Paejang was originally a sort of military positions. Thereafter it had been adopted to the various fields like soonrapaes. Pae, which was a regular working unit organized with $30{\sim}50$ laborers, took charge of the works allocated with its own chargeable section. 2. The first adoption of paejang system was found at the construction of Ganghwa-oyseong in 1690. Since the period of King Yeongjo and Jeongjo, it was generally used as a working system. 3. Yoo Hyeongwon had early suggested that this system should be adopted as a reformative system because it had a perfect command system like Soko-je, the provincial military system. 4. At the constructions of Dongnae-upseong, Jeonjoo-upseong and Daegoo-upseong in the period of King Yeongjo, paes were organized to $40{\sim}60$units, and worked in the fields of masonry, carnage and picking of stones. 5. At the construction of Soowon-seong in the period of King Jeongjo, a large number of various paejangs participated in all of working fields. Especially masonry-paes were usually organized with over 100 units. 6. It was estimated that paejang system surely could guarantee saving labors and term of works. Moreover, it was a basis for the further development form of dogup-je, a contracted work system. 7. Paejang system was applied in the constructions of Buddhist temples since the middle period of 1700s and later, it was widely used in the constructions of palaces.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.