Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.1.110

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -  

Jeon, SangHoon (Department of Architectural Engineering, Jeju National University)
Koo, Kyo-Jin (Department of Architectural Engineering, University of Seoul)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.1, 2015 , pp. 110-118 More about this Journal
Abstract
The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.
Keywords
Apartment Housing; Standard Production Unit System; Actual Amount of Labor; Historical Cost Data; Masonry; Plaster; Waterproofing; Tile;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 An, Soo-Bae. (2012). "Development of Productivity Information based on Crew for Structural Work of Apartment, Master's Thesis." The Graduate School University of Seoul, Seoul, South Korea.
2 FMI. (1999). U. S. Construction Industry Training Report, FMI Corp.
3 Go, Jongchul. Kim, Okkyu. Seo, sangwook, Lee, Chansik. and Kim, Munhan. (1991). "A Study on the development of the Manpower Forecasting Model in the Domestic Apartment House construction", Journal of 7 the Architectural Institute of Korea, AIK, 11(2), pp. 631-636.
4 Ha Gee-Joo and Ha Min-Su (2010). "A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Water-proofing in Apartment House", Journal of the Korea Institute of Building Construction, JKIB, 10(3) pp. 121-128.   과학기술학회마을   DOI   ScienceOn
5 Jeon Sanghoon and Koo kyo-jin (2008). "Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work", JKorean Journal of Construction Engineering and management, KICEM, 9(2), pp. 182-189.   과학기술학회마을
6 Kim, ByungSik (2009). "Analysis of ActualLabor Inputs for Productivity Measurement in Reinforced Concrete Work", Master's Thesis. The Graduate School Hanyang University, Seoul, South Korea.
7 Kim, Yeasang (1994). "Analysis of the Factors Influencing Construction Productivity" Journal of the Architectural Institute of Korea, AIK, 10(10), pp. 267-273.
8 Minister Of Land, Infrastructure and Transport (MOLIT)/Korea Institute of Civil Engineering and Building Technology (KICT) (2014). "standard production unit system in construction".
9 Park DW. (1994). "Amount of research by the labor process", Korea National Housing Corporation, KNHC, pp. 94-24.
10 Park Jong-Pyo (2007). "A Compare Practical Manpower with Standard Quantity on the RC-Work of Elementary School Construction" Master's Thesis. The Graduate School of industry, Bukyung National University, Busan, South Korea.
11 Shin DW, Lee YD, Shin YS, Kim GH, Yoo SR, and Park WJ. "Study on Improvement of Cost Calculation Method in Construction less than One Day Workload".   과학기술학회마을   DOI   ScienceOn