1 |
An, Soo-Bae. (2012). "Development of Productivity Information based on Crew for Structural Work of Apartment, Master's Thesis." The Graduate School University of Seoul, Seoul, South Korea.
|
2 |
FMI. (1999). U. S. Construction Industry Training Report, FMI Corp.
|
3 |
Go, Jongchul. Kim, Okkyu. Seo, sangwook, Lee, Chansik. and Kim, Munhan. (1991). "A Study on the development of the Manpower Forecasting Model in the Domestic Apartment House construction", Journal of 7 the Architectural Institute of Korea, AIK, 11(2), pp. 631-636.
|
4 |
Ha Gee-Joo and Ha Min-Su (2010). "A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Water-proofing in Apartment House", Journal of the Korea Institute of Building Construction, JKIB, 10(3) pp. 121-128.
과학기술학회마을
DOI
ScienceOn
|
5 |
Jeon Sanghoon and Koo kyo-jin (2008). "Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work", JKorean Journal of Construction Engineering and management, KICEM, 9(2), pp. 182-189.
과학기술학회마을
|
6 |
Kim, ByungSik (2009). "Analysis of ActualLabor Inputs for Productivity Measurement in Reinforced Concrete Work", Master's Thesis. The Graduate School Hanyang University, Seoul, South Korea.
|
7 |
Kim, Yeasang (1994). "Analysis of the Factors Influencing Construction Productivity" Journal of the Architectural Institute of Korea, AIK, 10(10), pp. 267-273.
|
8 |
Minister Of Land, Infrastructure and Transport (MOLIT)/Korea Institute of Civil Engineering and Building Technology (KICT) (2014). "standard production unit system in construction".
|
9 |
Park DW. (1994). "Amount of research by the labor process", Korea National Housing Corporation, KNHC, pp. 94-24.
|
10 |
Park Jong-Pyo (2007). "A Compare Practical Manpower with Standard Quantity on the RC-Work of Elementary School Construction" Master's Thesis. The Graduate School of industry, Bukyung National University, Busan, South Korea.
|
11 |
Shin DW, Lee YD, Shin YS, Kim GH, Yoo SR, and Park WJ. "Study on Improvement of Cost Calculation Method in Construction less than One Day Workload".
과학기술학회마을
DOI
ScienceOn
|