• 제목/요약/키워드: engineering & procurement & construction(EPC)

검색결과 46건 처리시간 0.027초

해외 화공플랜트 건설사업 위험요인 영향도 분석 (A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects)

  • 조승연;김용수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Concept of Operations of Procurement Engineering Management Support System

  • Salim, Shelly;Kim, Jin Il;Yeom, Choong Sub;Park, Jong Sun
    • 시스템엔지니어링학술지
    • /
    • 제14권1호
    • /
    • pp.52-62
    • /
    • 2018
  • A software support system, called procurement engineering management support system (PeMSS), is currently under development through a joint research project. The procurement-related scenarios considered in this research is as follow: an EPC (Engineering, Procurement and Construction) company receives an EPC project contract and starts the project to deliver the agreed system to the acquirer. In order to acquire the required equipments that the EPC company does not produce by itself, it eventually interacts with subcontractors, also called vendors. The EPC company responsibilities during the procurement activities are twofold. First, the EPC company has to guarantee that it has ordered the equipment, through issuing Purchase Order (PO), based on the requirements stated in the contract. Second, the EPC company has to verify that the received equipment designs, called Vendor Print (VP), meet the specifications in the PO, before finally acquiring the equipments. During our survey study, we discovered that EPC company takes a lot of time and effort to create PO and verify VP, mainly because these activities are performed manually by the responsible engineers. Therefore, we intent to support the above activities by developing a support system to the legacy procurement system that can trace the requirements from the contract to the PO and VP, among other functionalities. At the time of the writing of this paper, PeMMS is still under-development, thus, in this paper we focus on presenting the development steps of PeMMS using systems engineering theory and introducing the PO creation function. Wholly, PeMSS attempts to reduce the time and effort of engineers on the procurements activities while also increasing the quality of the procurement outcomes.

구매엔지니어링 관리지원시스템 상세 설계 사례 연구 (Design of the Procurement Engineering Support System : A Case Study)

  • 김진일;염충섭;신중욱
    • 시스템엔지니어링학술지
    • /
    • 제14권2호
    • /
    • pp.33-40
    • /
    • 2018
  • This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Gas & Oil 플랜트 조달관리 프로세스 분석 (Analysis of the Procurement Management Process for the Gas & Oil Plant projects)

  • 원서경;강민우;이준복;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.491-494
    • /
    • 2007
  • 국제 고유가에 힘입어 최근 중동의 산유국 중심으로 신규 사업 잘주가 이어지고 있다. 플랜트 산업은 엔지니어링(Engineering)과 조달(Procurement), 시공(Construction)이 융합된 복합산업(EPC)으로 고부가가치 산업이다. 또한 조달부문이 전체 사업비 규모의 70% 이상을 차지하므로 구매조달의 성패가 사업의 성패로까지 이어진다. 그러나 해외에서 다양한 사업참여 주체에 의해 수행되는 사업특성 상 구매조달 업무흐름 전체를 파악하고 원활히 사업을 수행하기란 어려운 실정이다. 따라서 최근 구매 및 조달 업무의 합리화를 통한 이윤창출 노력이 이어지고 있다. 본 연구에서는 해외 프로젝트를 수행하는 국내 주요 건설회사의 기존 구매조달 업무프로세스를 조사${\cdot}$분석하여 적정프로세스를 도출하였다. 또한 업무 프로세스상의 정보 및 문서의 입출력 정보를 분석하였다. 본 연구의 결과는 향후 해외 사업에 참여하게 되는 신규 업체의 인력 교육과 실무 활용에 이해를 도울 수 있는 자료로 활용될 수 있을 것으로 기대하며, 구매조달 업무 시스템 개발을 위한 자료로 활용될 수 있을 것이다.

  • PDF

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구 (Gradational Risk Management in Procurement Phase for Plant Projects)

  • 나성엽;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권3호
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 - (Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 -)

  • 홍성열;제재용;서성철;박형근
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.101-110
    • /
    • 2022
  • 최근 세계 건설시장은 2025년까지 연 평균 4.8%씩 성장할 것으로 예상하고 있으며, 이에 따른 해외건설 리스크도 증가할 것으로 전망하고 있다. 특히, 국내 건설업체들은 EPC(Engineering, Procurement, Construction)/Turnkey 사업에 집중적으로 참여하였지만, 계약적 리스크에 대응하지 못한 결과, 2013년부터 수조원대의 해외사업 손실을 입은 경험이 있다. 그럼에도 불구하고, 지금까지 EPC/Turnkey의 계약적 핵심 리스크 세부조항 도출에 대한 연구는 많지 않았다. 따라서 본 연구에서는 국제컨설팅엔지니어링연맹(FIDIC)에서 발행한 2017년 Silver Book 계약조건을 대상으로 핵심 리스크 세부조항을 연구하였다. 이를 위해서 국제건설계약 경험이 10년 이상인 30인의 전문가를 패널로 구성하여 FIDIC Silver Book 21개 조항 170개 세부조항을 델파이 설문조사를 실시하여 62개의 주요 리스크 세부조항을 도출하였다. 또한, 최종적으로 FMEA(Failure Mode and Effect Analysis)기법을 활용하여 RPN(Risk Priority Number)을 산정하였으며, Critical Risk 범위에 속하는 25개의 핵심 리스크 세부조항을 도출하였다. 본 연구 결과를 통하여 실무관점에서는 해외건설사업에서 입찰 및 계약체결 단계에서 주의 깊게 검토해야 할 계약조항들에 대해 참조할 수 있게 해주고, 학문관점에서는 해외건설 EPC/Turnkey 사업에서 사용되는 계약분야에 대해 어떤 방식으로 연구해야 할지의 방향성과 기초적 지식을 제공하고 있다.

산업설비 업무 분석을 통한 설계단계 정보 분류체계 (Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis)

  • 송영웅;조항민;최윤기
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.3-15
    • /
    • 2009
  • 최근 해외 건설시장 플랜트 분야의 수주 증대에 따라 오일 가스 분야의 프로젝트가 증가하고 있다. 따라서 국내 건설 산업 업체들의 해외 플랜트 사업의 경쟁력을 확보하기 위해서는 생산성 향상 기술 경쟁력 확보 전략적 경영 추진 등 적극적인 대처 방안 수립이 요구되고 있다. 그 중에서도 해외 플랜트 사업의 오일 가스 분야는 산업 경쟁력 향상을 위하여 프로젝트 수행과 관련한 EPC(Engineering Procurement Construction) 유통 정보의 활용이 더욱 요구되지만, EPC 단계별 다양한 업무에서 발생하는 유통정보 콘텐츠를 효율적으로 관리하기 위한 콘텐츠 분류체계가 제시되고 있지 못하고 있다. 그로 인하여 설계도면의 변경, 중복업무의 발생, 업무주제간의 정보 누락 등의 문제점이 발생하고 있다. 이런 문제점으로 인하여 시장점유율이 감소하고 있으며 경쟁력이 약해지고 있다. 따라서 본 연구는 오일 가스분야의 콘텐츠 관리체계의 실무적 활용의 증대와 건설산업 정보관리의 효용성을 향상시키기 위하여 콘텐츠 관리 체계를 확립하기 위한 BPM(Business Process Management) 기반의 콘텐츠 분류 체계를 제시하고, 국내기업의 경쟁력이 가장 낮은 설계단계의 Business Process를 정의하고 요구되는 지식의 유형을 체계화하고, 콘텐츠 정보를 분석하여 설계단계 산업설비 유통정보의 체계화를 지원하고자 한다.