DOI QR코드

DOI QR Code

Design of the Procurement Engineering Support System : A Case Study

구매엔지니어링 관리지원시스템 상세 설계 사례 연구

  • 김진일 (고등기술연구원 플랜트엔지니어링 센터) ;
  • 염충섭 (고등기술연구원 플랜트엔지니어링 센터) ;
  • 신중욱 (고등기술연구원 플랜트엔지니어링 센터) ;
  • Received : 2018.10.31
  • Accepted : 2019.01.07
  • Published : 2018.12.31

Abstract

This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

Keywords

HSSTBN_2018_v14n2_33_f0001.png 이미지

[Figure 1] Operational concept and external interfaces of PeMSS

HSSTBN_2018_v14n2_33_f0002.png 이미지

[Figure 2] Contract Document Parsing and Classification concept

HSSTBN_2018_v14n2_33_f0003.png 이미지

[Figure 3] Contract Document Parsing and Classification functional flow

HSSTBN_2018_v14n2_33_f0004.png 이미지

[Figure 4] Overall Process of Development of Procurement Specification

HSSTBN_2018_v14n2_33_f0005.png 이미지

[Figure 5] Functional Flow of Development of Procurement Specification

HSSTBN_2018_v14n2_33_f0006.png 이미지

[Figure 6] Link between Material List and Material Requisition List

HSSTBN_2018_v14n2_33_f0007.png 이미지

[Figure 7] Material Requisition Template

HSSTBN_2018_v14n2_33_f0008.png 이미지

[Figure 8] Allocation of Rrocurement Requirement to Template

HSSTBN_2018_v14n2_33_f0009.png 이미지

[Figure 9] Vendor Comment Management

HSSTBN_2018_v14n2_33_f0010.png 이미지

[Figure 10] Vendor Comment Management Functional Flow

HSSTBN_2018_v14n2_33_f0011.png 이미지

[Figure 11] Traceability of Requirements

Comparison of PeMSS function and tasks in operational concept

HSSTBN_2018_v14n2_33_t0001.png 이미지

References

  1. IAEA, Procurement engineering and supply chain guidelines in support of operation and maintenance of nuclear facilities, IAEA Nuclear Energy Series No. NP-T-3.21. 2016
  2. Shelly Salim 외, Concept of Operations of Procurement Engineering Management Support System, 시스템엔지니어링 학술지 제14권 제1호, Vol 14, 2018.
  3. ISO/IEC/IEEE, System and software engineering- System life cycle processes, 2015.
  4. 고등기술연구원 외, 해외건설 기자재 DB 구축 및 표준 전자상거래 시스템 개발 연구보고서, 2007.6
  5. Clearwater, Global supply chain management software market report 2014. 2014, A clearwater international TMP team report.
  6. 정달채, 플랜트 엔지니어링업에서의 전략적 구매.공급관리, 한국과학기술원 석사학위 논문, 1999.
  7. 나성엽, 플랜트 프로젝트의 구매 조달 단계별 리스크 분석에 관한 연구, 한양대학교 석사학위 논문, 2009.
  8. 한충희, 해외 플랜트 프로젝트의 구매조달 프로세스 개선 방안 제시, 한양대학교 석사학위 논문, 2008.