• Title/Summary/Keyword: contract method

Search Result 532, Processing Time 0.022 seconds

A robust execution scheme for Ethereum blockchain application services

  • Kwon, Min-Ho;Lee, Myung-Joon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.3
    • /
    • pp.73-80
    • /
    • 2020
  • In this paper, we propose a robust execution scheme for Ethereum blockchain application services which provide continuous services and support recovery even in the case of failures of those services. As of now, blockchain services are rapidly expanding to all industries and being combined with various infrastructure services of public institutions. But if these services fail in disastrous situations such as earthquakes, floods and terrors or various hacking attacks, the aftermath is very serious and its side effects are difficult to assess. To resolve this issue, we develop the service registry as a smart contract of the Ethereum blockchain, which provides useful information on the services to users even in disasters. With the help of the service registry, we also present a method of replicating services on the basis of the ETCD distributed storage system. The proposed scheme is confirmed by the test service developed by the proposed techniques.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Integrated approach to the working experience of non-regular outpatient nurse (비정규직 외래간호사의 근무경험에 대한 융합적 접근)

  • Lee, Hye Jin;Lee, Do Young
    • Journal of the Korea Convergence Society
    • /
    • v.7 no.3
    • /
    • pp.111-120
    • /
    • 2016
  • The goal of this thesis is to have a subjective and general insight to the working experience of non-regular outpatient nurses working in general hospital to understand them. As for the study subjects, 7 non-regular outpatient nurses working in general hospital with rich working experience were randomly selected, and they were analyzed by Colaizzi's phenomenological qualitative research method which drew out 4 categories and 8 subcategories. As the result, non-regular outpatient nurses, due to its distinct characteristics of employment as contract worker, felt satisfaction in working environment on the surface, but found out there were reversed emotion in feeling dissatisfaction for the compensation or development. The results mentioned above will provide useful data in understanding the essence of working experience of non-regular outpatient nurses, and expect these results will be the supporting grounds to have interests and access to realistic problem that the non-regular outpatient nurses are facing.

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

A Study on The Problem of The Revised Security Industry Law and Improvement Plan (개정 경비업법의 문제점과 개선방안에 관한 연구)

  • Park, Hyung-Sik
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.129-135
    • /
    • 2013
  • The revised security industry law revised 17 provisions among 31 provisions in order to root out the violent event. The main contents of the revised security industry law is the intensitfication of the required condition of permission, intensitfication of the obligation, management strengthening of the public resentment of group field, official, reason of expansion of the expenses instructor and guard, dress and equipment, vehicle, intensitfication of the managing director, intensitfication of the punishment, and etc. However, there is the problem including the putting under an obligation of the arrangement new appointment education, cause provider punishment of the service company violence, awareness of the police to the security company, excessive regulation, intensification of punishment problem, supervision power intensitfication of the revised security industry law is excessive the police, and etc. The individual responsibility education completion method and public resentment of group field in addition to is thought in order to solve this that exclusion of the prior education obligation, revision of the security industry law, burden on tax payers of the extra charge, punishment of the violence request contract trader, introduction of the guard qualification certificate system, and etc. are needed.

Construction Partnering on Alternative Project Delivery Methods: A Case Study of Construction Manager/General Contractor Partnered Transportation Projects

  • Adamtey, Simon A.;Kereri, James O.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.4
    • /
    • pp.1-15
    • /
    • 2019
  • Since its adoption by the transportation sector in the early 1990s, partnering has been broadly used with the traditional delivery method by many agencies with significant reported benefits. During the same era, a number of transportation agencies (DOTs) started experimenting with a wide variety of alternative project delivery methods (APDMs) aimed at improving the delivery of highway construction projects. The effect of collaborative working strategies such as partnering, together with the APDMs have become somehow interrelated posing a potential challenge on how to effectively integrate partnering as a concept in the APDMs. The salient question has been if the collaborative nature of these APDMs has affected how partnering is being used by state DOTs. Through an extensive literature review, analysis of 32 CMGC RFPs/RFQs and review of three CMGC case studies, the study found that there is limited information in state DOT documents that show procedures on the usage of partnering with CMGC projects. Majority of DOTs are relying on the inherent nature of the CMGC contract to promote healthy collaborative practices and there is the need to consider partnering during preconstruction and construction separately to cater for any personnel change over. The study also revealed that partnering may become less important at the construction phase due to overlap between partnering and CMGC practices. In support of this finding, a CMGC partnering model was developed that can be adopted by DOTs. This paper contributes to both research and practice by expanding the existing knowledge on partnering on APDMs.

Analysis of the 500M Short track speed skating starting motion according to the center of gravity position ratio (인체 무게 중심 분할에 따른 500m 숏트트랙 스피드 스케이팅 출발 기술 분석)

  • Back, Jin-Ho;Chung, Nam-Ju;Han, Ki-Hoon;Lee, Yong-Goo;Yoon, Dong-Seob;Lee, Yong-Sik
    • Korean Journal of Applied Biomechanics
    • /
    • v.13 no.3
    • /
    • pp.199-215
    • /
    • 2003
  • The purpose of this study was to attempt new starting motion and supply present starting motion in the 500M short track speed skating according to the center of gravity position. The center of gravity position ratio was divided starting motion into five(type A : front 80%-back 20%, type B front 70%-back 30%, type C : front 50%-back 50%, type D : front 30%-back 70%, type E : front 20%-back 80%). The three dimension motion analysis with DLT(direct linear transformation) method was executed using two video cameras. The following conclusion was that It was appear that reaction and execution time in starting motion was the most short in type B. It was characteristic that step of skaters was shorten and center of gravity position ratio was not effect to change of the step in each event. It was appear that the displacement of type D and type E were longer than that type A and type B during the starting motion. It was appear that skill types of center of gravity position ratio to the front were lower than that to the back and contract a posture. Observing the above, it was conclusion that skill type B of center of gravity position ratio to the tent was more effect than that to the back. But it is important that these skill type was most used to the competition and estimate the result.

A Study on the Combined Decision Tree(C4.5) and Neural Network Algorithm for Classification of Mobile Telecommunication Customer (이동통신고객 분류를 위한 의사결정나무(C4.5)와 신경망 결합 알고리즘에 관한 연구)

  • 이극노;이홍철
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.1
    • /
    • pp.139-155
    • /
    • 2003
  • This paper presents the new methodology of analyzing and classifying patterns of customers in mobile telecommunication market to enhance the performance of predicting the credit information based on the decision tree and neural network. With the application of variance selection process from decision tree, the systemic process of defining input vector's value and the rule generation were developed. In point of customer management, this research analyzes current customers and produces the patterns of them so that the company can maintain good customer relationship and makes special management on the customer who has huh potential of getting out of contract in advance. The real implementation of proposed method shows that the predicted accuracy is higher than existing methods such as decision tree(CART, C4.5), regression, neural network and combined model(CART and NN).

  • PDF

A Critical Review and Proposal to Legislation in respect of Actual Carrier's Liability under the Commercial Act (상법상 실제운송인의 손해배상책임에 관한 비판적 고찰과 입법론)

  • KIM, Chan-Young
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.327-348
    • /
    • 2016
  • Under the Korean legal system, as an actual carrier is not the contractual party to the contract for carriage of goods by sea, it has been tortiously liable for the damage to, or loss of cargo, should there be the negligence by its part. However, the Rotterdam Rules introduces a revolutionary liability regime for the actual carrier. According to the Rotterdam Rules, the liability of the actual carrier is same with that of a contractual carrier with the result that a shipper is entitled to bring the direct action to the actual carrier, as well as the contractual carrier on the same basis. Nevertheless, it is expected to take long time for the new approach in respect of actual carrier's liability to be confirmed by many countries, and furthermore most of shipping countries including Korea still adopt the Hague-Vis by Rules where the shipper is not allowed to bring the direct action to the actual carrier. This study reviews on whether or not the alteration of actual carrier's liability based on Rotterdam Rules would be reasonable, considering the current Korean legal system. Furthermore, this study, whilst recognizing that the overall introduction of the new liability regime is somewhat premature, suggests the imposition of contractual liability to the actual carrier from a long-term perspective. Having in mind that the article 809 of the Korean Commercial Act allows the shipper to bring the direct action to the shipowner only in the case that a time charterer is the contractual carrier, this study explores a method to apply the contractual liability to the actual carrier in the case that a slot charterer or freight forwarder is the contractual carrier, in order to establish the uniform liability system.

  • PDF

Improvement Plans for Problem Cases in the Foundation and Management of Elderly Housing Facility (노인복지주택의 설치 및 운영의 문제 사례와 개선방안)

  • June, Kyung-Sook
    • Korean Journal of Human Ecology
    • /
    • v.18 no.5
    • /
    • pp.1155-1168
    • /
    • 2009
  • The purpose of this research is to investigate the realities and problem cases that occurred in the establishment and management of elderly housing facility in order to suggest the recommendations that help to improve the problem cases. For this purpose, 21 elderly housing facilities, which were established between 1996 and 2008 in Korea, were investigated with a documentary research method in terms of founders, managers, locations, the number of housing units, how to move-in. Also the problem cases that occurred in the establishment and management of 21 elderly housing facilities were investigated. The results were as followings. 1. Main founders and managers of 21 elderly housing facilities were the special companies for elderly housing, building companies, and social welfare corporation. Changes in the founders and managers were caused by financial problems; More than half of 21 elderly housing facilities were located in Seoul and near area; About a half of 21 elderly housing facilities had 100~200 housing units; An individual unit of elderly housing facilities can be rented or purchased, rented only, and purchased only. 2. The problems in the establishment and management of elderly housing facilities were non-return of deposit money, illegal sale of housing units, non-public registration of elderly housing facility, false advertisement, and unfair contract. 3. The problems in the establishment and management were mainly caused by the weakness in the regal and administration system for elderly housing and the illegal acts of founders and managers.