• 제목/요약/키워드: construction-cost-calculation

검색결과 237건 처리시간 0.028초

중저진 지역에서의 지진격리교량의 경제적 효율성에 관한 연구 (Cost Effectiveness of Bse-Isolation for Bridges in Low and Moderate Seismic Region)

  • 고현무
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 1999년도 춘계 학술발표회 논문집 Proceedings of EESK Conference-Spring
    • /
    • pp.178-185
    • /
    • 1999
  • Minimum life-cycle cost helps to evaluate cost effectiveness of base-isolated bridges under specific condition. Life-cycle cost mainly consists of the initial construction cost and the expected damage cost. Damage cost estimation needs proper model of input ground motion failure probability evaluation method and limit states definition. We model the input ground motion as spectral density function compatible with the response spectra defined at each seismicity and site condition. Spectrum analysis and crossing theory is suitable for reseating calculation of failure probabilities in the process of cost minimization. Limit states of base-isolated bridges re defined for superstructure isolator and pier respectively The method is applied to both base-isolated bridges and conventional bridges under the same conditions to investigate cost effectiveness of base isolation in low and moderate seismic region. the results show that base-isolation of bridges are more effective in low and moderate seismic region and that the site effects on the economical efficiency may not be negligible in such a region.

  • PDF

공공아파트 실적데이터 기반의 지역지수 산정 모델 개발 (Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings)

  • 임대희;이승훈;서용칠
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.75-80
    • /
    • 2010
  • 국내 주택건설시장은 가격 경쟁의 심화와 함께 형태 구조적인 다양화가 동반되어 사업의 불확실성이 증가하고 있다. 이로 인해 건설사업 기획단계의 중요성이 강조되고 있으며, 점점 더 높은 정확도를 가진 개산견적을 요구하고 있다. 현재 초기 기획단계의 공사비 산정에 관한 연구나 프로그램 개발이 다수 이루어지고 있으나, 지역성을 고려하여 결과를 도출한 경우는 많지 않다. 비용 산정 시 지역적 보정이 함께 이루어진다면 보다 정확한 비용 추정이 가능하고, 이는 곧 성공적인 프로젝트 수행에 큰 역할을 할 수 있을 것이다. 따라서 본 연구의 목적은 공공아파트 실적데이터를 기반으로 하여 지역지수 산정 방법론 및 산정 모델을 구축하고, 공사비 추정 시 활용할 수 있는 지역지수를 도출하는 것이다.

공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구 (Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension)

  • 정기창;이재섭;박양호
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.33-44
    • /
    • 2012
  • 본 연구는 공공공사 공기연장 시 발생하는 추가간접비의 지급개선방안에 관한 연구이다. 현장사례를 통해 공기연장 추가 간접비 미지급 원인을 분석한 결과 실비의 인정범위에 대한 다툼 및 증빙의 어려움이 있는 것으로 조사되었으며, 전문가 의견조사 실시결과 통계적 기준이 명확하다면 공기연장 추가간접비의 인정범위를 합의하는 '공기연장 사전합의 제도'를 실시할 수 있을 것으로 조사되었다. 따라서 본 연구는 다수의 현장 실비자료를 집계하여 공사프로젝트의 공종별, 공사금액별, 공사기간별 측면에서 산정하였다. 산정한 결과 공종 및 공사기간별 요인은 공사기간연장 추가간접비 발생금액에 직접적 영향을 미치는 것으로 볼 수 없으나 도급계약금액요인에 따라서는 직접적 연관성이 있는 것으로 나타났다. 이에 계약금액별 공사기간연장에 따른 추가비용인 '공기연장 표준추가간접비'를 제시하였으며, 공기연장비용 사전합의 제도를 시행하기 위한 제도적 개선방안을 제시하였다.

기술용역 대가기준의 문제점 및 개선방안 (A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts)

  • 이태원;이강
    • 한국건설관리학회논문집
    • /
    • 제15권2호
    • /
    • pp.33-43
    • /
    • 2014
  • 정부, 지방자치단체 및 기타 공공기관 등이 필요로 하는 각종 시설공사, 물품, 용역 등의 조달은 국가예산을 사용하여 집행되고 있다. 우리나라에서는 국가의 예산을 효율적으로 집행하기 위하여 "국가를 당사자로 하는 계약에 관한 법률" 시행령 제9조 제1항 제2조에서 예정가격의 결정기준 중 원가계산에 의한 가격에 관하여 규정하고 있고, 이를 근거로 사업목적에 따라 소관부서별로 각기 원가계산에 의한 예정가격의 결정을 위한 대가기준을 가지고 있다. 본 연구는 기술용역의 대가기준에 관한 고찰을 통하여 투명성을 확보할 수 있는 용역비 산출방법을 도출하여 공공기관이 보다 합리적이고 효율적인 예산집행을 할 수 있도록 현실적인 개선방안을 제시하는데 그 목적이 있다.

개발부담금 제도 개선방안에 관한 연구 (A Study on the Improvement of the Development Charges System)

  • 최연희;유선봉
    • 한국건설관리학회논문집
    • /
    • 제20권5호
    • /
    • pp.61-71
    • /
    • 2019
  • 2018년 헌법개정을 통한 토지공개념 강화를 위한 개헌논란에서 보았듯이 토지와 관련된 정책문제는 지속으로 발생되고 있다. 본 연구에서는 토지공개념의 헌법적근거와 개발이익의 개념을 확인하고 헌법재판소의 판례를 통한 개발부담금 제도의 정당성을 조사한 후 개발부담금 산정의 공정성과 신뢰성 확보를 위한 개선방안을 제시하였다. 첫째, 개발부담금 제도의 투명성확보와 투기적 개발사업의 방지, 부과권자의 행정효율화를 위하여 개발부담금 추정시스템의 개발이 필요한 점과 둘째, 납부의무자가 제출하는 개발비용 산출명세서를 전문가에게 작성토록 제도화하여 부실산정을 방지하고, 셋째, 개발비용 산출을 위한 기초자료를 인 허가 시점부터 부관에 구체적으로 명시하거나 개발부담금 부과업무징수처리규정에 적시하여 제도화할 것을 제시하였다. 그리고 공사계획변경에 의한 설계변경시에도 첨부하도록 하여 준공후 개발비용 산정시 개발사업기간내 제출된 자료를 활용하도록 하여 개발비용의 신뢰도를 높이도록 제안하였다.

생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발 (Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis)

  • 안수배;지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구 (A Study on the tension of Geogid on Pile-supported Construction Method)

  • 문인호;박종관;이일화
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF

몬테카를로 시뮬레이션을 이용한 건축물 생애주기비용(LCC)의 실질할인율에 대한 확률론적 분석 (Stochastic analysis for Real Rate Interest of Building Life Cycle Cost(LCC) with Monte-Carlo Simulation)

  • 김범식;정영한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.161-163
    • /
    • 2012
  • Recently on Value Engineering(VE) and Life Cycle Cost(LCC) social interests is increasing. The government Turn Key, BTL projects and public works projects, such as VE and LCC Analysis on the value and economic analysis is mandatory. And accordingly the VE and LCC analysis is underway for the various studies. However, there is a problem existing in the LCC analysis. Worth the cost varies according to the flow of time. However, the real interest rate during the LCC analysis of buildings in calculation time for interest rates and inflation are not considering the value of the flow. In other words, a few years using the average value of the deterministic analysis method has been adopted. These costs for the definitive analysis of the cost of an uncertain future, unforeseen changes resulting hazardous value. In this study of the last 15 years interest rates and inflation targeting by using Monte-Carlo Simulation is to perform probabilistic analysis. This potential to overcome uncertainties of the cost of building a more scientific and LCC Estimation of the probability value of the real interest rate is presented.

  • PDF

건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로 (Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate)

  • 박희성;한예령;허영기;안방률
    • 대한토목학회논문집
    • /
    • 제28권1D호
    • /
    • pp.67-72
    • /
    • 2008
  • 건설기계는 건설사업의 성공적인 수행을 위한 중요한 요인이다. 그리고 건설기계에 소요되는 비용이 건설공사비에서 차지하는 비중이 크다. 따라서 건설기계 비용의 산정은 건설계획 단계에서 중요한 업무이다. 이를 위해서 우리나라는 표준 품셈에 제시된 건설기계 시공능력 산정식을 이용하여 건설기계의 시간당 작업량을 계산하는 방식을 활용하고 있다. 그러나 건설기계의 성능은 개선되고 있으나 시공능력 산정식에서 활용되고 있는 작업효율은 이를 반영하지 못하는 실정이다. 이에 본 연구는 유압식 백호, 로우더, 덤프트럭을 대상으로 현장실사를 통해 작업효율을 실측하였다. 그 결과 백호와 로우더는 현재 활용중인 작업효율보다 현장실사 값이 높게 나타났으며, 덤프트럭은 낮게 나타났다. 본 연구결과를 바탕으로 건설기계의 작업효율 표준 산정식에 대한 정의가 수립되어야 하며, 체계적이고 장기적인 조사를 거쳐 작업효율의 개정이 필요할 것으로 사료된다.

개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발 (Development of A Prototype for Wall Formwork Designs using Open BIM)

  • 김승권;김현주;현창택;한상원
    • 한국건설관리학회논문집
    • /
    • 제19권6호
    • /
    • pp.3-13
    • /
    • 2018
  • 거푸집공사비는 건축공사비의 10~15%, 골조공사비의 30~40%로, 건축공사에서 차지하는 비중이 상당하다. 또한 거푸집 붕괴로 인한 사망재해가 빈번하게 발생하고 있어, 다른 공종에 비하여 상대적으로 재해강도가 높은 공종이라 할 수 있다. 이처럼 건설 프로젝트에서 거푸집을 설계할 때 정확한 물량산출과 구조계산은 매우 중요한 사항이다. 따라서 본 연구에서는 거푸집설계를 용이하게 하기 위하여 거푸집공사에 관련된 새로운 IFC Entity를 제안하였으며, "개방형 BIM 거푸집설계 프로토타입"을 개발하였다. 본 연구에서 제안하는 거푸집설계 접근법은 시공 관리자로 하여금 정확한 물량산출과 신속한 계획 및 시공을 수행하는데 도움을 줄 것으로 기대된다. 하지만 본 연구는 소규모 특정건축물과 유로폼 만을 대상으로 수행하였기 때문에, 그 외의 건축물의 거푸집공사에 적용하기에는 한계가 있고, 범용적으로 거푸집공사에 적용하기 위해서는 추가적인 연구가 필요할 것이다.