Browse > Article
http://dx.doi.org/10.6106/KJCEM.2018.19.6.003

Development of A Prototype for Wall Formwork Designs using Open BIM  

Jin, Chengquan (Department of Architectural Engineering, University of Seoul)
Kim, Hyunjoo (Department of Global Construction, University of Seoul)
Hyun, Chang-Taek (Department of Architectural Engineering, University of Seoul)
Han, Sang-Won (Department of Architectural Engineering, University of Seoul)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.6, 2018 , pp. 3-13 More about this Journal
Abstract
The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.
Keywords
Open BIM; Wall Formwork; IFC; Formwork Design; Quantity Take-off;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Public Procurement Service (2015), BIM Application Guide
2 Seo, G. S., Kim, D. H., Kum, D. S., and Jeong, H. Y. (2004). "Examples of form specification and structure calculations." Journal of the Korean Structural Engineers Association, 11(4), pp. 14-23.
3 Shin, Y. S., Choi, H. B., Lee, U. K., Ann, S. H., and Kang, K. I. (2006). "A Study on Selection of Slab Form Work System for High - rise Building Construction." Journal of the Architectural Institute of Korea, 22(2), pp. 147-154.
4 SMART SCAFFOLDER, https://smartscaffolder.com/news/ bim-toolbox-robust-ifc-export/
5 Song, C. Y., Lee, H. C., Park, S. H., Cho, K. M., and Hyun, C. T. (2010). "Productivity Analysis of Structural Work for Apartment Building Using AL-Form." Journal of the Architectural Institute of Korea, 26(4), pp. 113-121.
6 Tam, C. M., Tong, Thomas K. L., Lau Tony C. T., and Chan K. K. (2005). "Selection of vertical formwork system by probabilistic neural networks models." Construction Management and Economics, 23, pp. 245-254.
7 Yoon, S. M., Woo, S. J., Choi, J. W., and Kim, J. H. (2013). "A Method of Converting IFC Data for Development of BIM based Building Energy Simulation Interface." the Korean Solar Energy Society Spring Annual Conference, 33(1), pp. 182-187.
8 buildingSMART, http://www.buildingsmart-tech.org/ifc/
9 Chung, B. Y., Lee, H. C., Kim, J. H., and Go, S. S. (2010). "Performance Evaluation of Recycled Synthetic Resins Euro-form by Injection Modeling Method." Journal of the Korea Institute of Building Construction, 10(2), pp. 105-113.   DOI
10 Hanna, Awad S., Willenbrock, Jack H., and Sanvido, Victor E. (1992). "Knowledge acquisition and development for formwork selection system." Journal of Construction Engineering and Management, 118(1), pp. 179-198.   DOI
11 Hwang, Y. S. (2004). "Automatic Quantity Takeoff from CAD File Based on IFC Model." Architectural Institute of Korea Annual Conference, 24(1), pp. 798-801.
12 Kim, Hyunjoo et al. (2016). "BIM IFC information mapping to building energy analysis (BEA) model with manually extended material information." Automation in Construction, 68, pp. 183-193.   DOI
13 Joo, S. I., and Jun, H. J. (2009). "A Study on the BIM-basd Material Take Off That is Usable as 4D Simulation." Architectural Institute of Korea Annual Conference, 29(1), pp. 335-338.
14 Jun, K. H., and Yoon, S. H. (2010). "Using hand and 3D CAD compared with concrete and mold Quantity." The Korean Institute of Building Construction, 10(2), pp. 45-48.   DOI
15 Jun, K. H., and Yoon, S. H. (2011). "The case study of BIM-based quantity take-off for concrete and formwork." Journal of KIBIM, 1(1), pp. 13-17.   DOI
16 Jung, Y. S., Park, J. H., Kang, S. H., Park, B. M., and Choi, I. S. (2005). "Factors for Selecting Forms; A Case-Study." The Korean Institute of Building Construction, 5(2), pp. 111-116.   DOI
17 Kannan, M. Ramesh and Santhi, M. Helen (2013). "Constructability Assessment of Climbing Formwork Systems Using Building Information Modeling." Procedia Engineering, 64, pp. 1129-1138.   DOI
18 Kim, J. H., and Yoon, S. W. (2013). "A Verification of the Accuracy in BIM-Based Quantity Taking-Off- Focusing on Finishing Work." Journal of KIBIM, 3(2), pp. 1-9.   DOI
19 Kim, K. R., and Yu, J. H. (2012). "A Method for Extracting Geometry Data from IFC File for Building Energy Load Analysis." Journal of the Architectural Institute of Korea, 28(5), pp. 241-248.
20 Kim, S. G., and Lee, U. K., Cho, H. H., Kang, K. I. (2006). "Decision Support System for Slab Form-work Selection of High-rise Building Construction." Journal of the Architectural Institute of Korea, 22(11), pp. 207-214.
21 Korea Land & Housing Corporation (2008). Apartment formwork guide.
22 Oh, S. W., Sung, B. J., Kim, Y. S., and Kim, J. R. (2001). "The Development of an Automated Cost Estimating System using 3D CAD Building Element Information - Focused on the Apartment Housing." Journal of the Architectural Institute of Korea, 17(6), pp. 103-112.
23 Kunwon Engineering Technology Division (2010). Building Information Modeling source book, Kunwon Engineering.
24 Lee, J. J., Shin, T. H., Kim, S. A., Kang, M. K., and Chin, S. Y. (2008). "A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework." KICEM Annual conference, pp. 747-750.
25 Lee, J. G., Lee, H. S., Park, M. S., and Jung, M. H. (2013). "A Framework Integrating Cost and Schedule based on BIM using IFC." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 53-64.   DOI
26 Lee, K. S., Kim, S. M., Kim, Y. S., and Han, S. W. (2010). "Evaluation of Requisites for Finding Appropriate Form-work Operation in Residential Building using Delphi Technigue." The Korean Institute of Building Construction, 10(2), pp. 149-152.
27 Ministry of Land, Infrastructure and Transport (2014). Hypothesis construction standard specification.
28 Park, J. D., and Kim, J. W. (2009). "A Study on the Ontology Representation of the IFC based Building Information Model." Journal of the Architectural Institute of Korea, 25(5), pp. 87-94.
29 Park, S. J., Song, H. H., Kim, D. Y., and Shim, C. S. (2014). "Concrete Formwork Design for Irregular Structures using 3D Printing." KIBIM Annual Conference, 4(1), pp. 89-90.