• Title/Summary/Keyword: Variable Sampling

Search Result 697, Processing Time 0.025 seconds

Revised KS Standards for Acceptance Sampling By Attribute and By Variable Based On OC Curve (OC 곡선에 기초한 규준형 샘플링 검사 규격)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.505-515
    • /
    • 2008
  • This paper introduces six single and sequential acceptance sampling plans based on OC( Operating Characteristic) curve. Revised KS standards for acceptance sampling by attribute and by variable such as KSA 3102 : 1996, 3103 : 2005, KSA ISO 14560 : 2006, 8422 : 2001, 8423 : 2001 are presented.

  • PDF

Revised KS Standards for Acceptance Sampling By Attribute and By Variable Based On Switching Rule (전환규칙을 적용한 조정형 샘플링 검사의 종류)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.517-526
    • /
    • 2008
  • This paper introduces fourteen single, double, multiple and sequential acceptance sampling plans based on switching rule. Revised KS standards for acceptance sampling by attribute and by variable such as KSA ISO 2859-0, 1:2001 2859-2:2001, 8422:2001, 3951:2006, 8423:2001, MIL-STD-105E:1989, 414:1968 and ANSI/ASQ Z1.4, Z1.9:2003 are presented.

  • PDF

An importance sampling for a function of a multivariate random variable

  • Jae-Yeol Park;Hee-Geon Kang;Sunggon Kim
    • Communications for Statistical Applications and Methods
    • /
    • v.31 no.1
    • /
    • pp.65-85
    • /
    • 2024
  • The tail probability of a function of a multivariate random variable is not easy to estimate by the crude Monte Carlo simulation. When the occurrence of the function value over a threshold is rare, the accurate estimation of the corresponding probability requires a huge number of samples. When the explicit form of the cumulative distribution function of each component of the variable is known, the inverse transform likelihood ratio method is directly applicable scheme to estimate the tail probability efficiently. The method is a type of the importance sampling and its efficiency depends on the selection of the importance sampling distribution. When the cumulative distribution of the multivariate random variable is represented by a copula and its marginal distributions, we develop an iterative algorithm to find the optimal importance sampling distribution, and show the convergence of the algorithm. The performance of the proposed scheme is compared with the crude Monte Carlo simulation numerically.

An Economic Design of $\bar{X}$ Control Charts with Variable Sample Size and Sampling Interval (변량표본크기와 변량표본추출구간을 이용한$\bar{X}$관리도의 경제적 설계)

  • 김계완;윤덕균
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.18-30
    • /
    • 2000
  • Recent studies have shown that the $\bar{X}$ chart with variable sampling intervals(VSI) and the $\bar{X}$ chart with variable sample size(VSS) are much quicker than Shewhart $\bar{X}$ chart in detecting shiks in the process. Shewhart $\bar{X}$ chart has been beneficial to detect large shifts but it is hard to apply Shewhart $\bar{X}$ chart in detecting moderate shifts in the process mean. In this article the $\bar{X}$ chart using variable sample size(VSS) and variable sampling Intervals(VSI) has been proposed to supplement the weak point mentioned above. So the purpose of this paper is to consider finding the design parameters which minimize expected loss costs for unit process time and measure the performance of VSSI(variable sample size and sampling interval) $\bar{X}$ chart. It is important that assignable causes be detected to maintain the process controlled. This paper has been studied under the assumption that one cycle is from starting of the process to eliminating the assignable causes in the process. The other purpose of this article is to represent the expected loss costs in one cycle with three process parameters(sample size, sampling interval and control limits) function and find the three parameters.

  • PDF

ESTIMATING THE CORRELATION COEFFICIENT IN A BIVARIATE NORMAL DISTRIBUTION USING MOVING EXTREME RANKED SET SAMPLING WITH A CONCOMITANT VARIABLE

  • AL-SALEH MOHAMMAD FRAIWAN;AL-ANANBEH AHMAD MOHAMMAD
    • Journal of the Korean Statistical Society
    • /
    • v.34 no.2
    • /
    • pp.125-140
    • /
    • 2005
  • In this paper, we consider the estimation of the correlation coefficient in the bivariate normal distribution, based on a sample obtained using a modification of the moving extreme ranked set sampling technique (MERSS) that was introduced by Al-Saleh and Al-Hadhrami (2003a). The modification involves using a concomitant random variable. Nonparametric-type methods as well as the maximum likelihood estimation are considered under different settings. The obtained estimators are compared to their counterparts that are obtained based simple random sampling (SRS). It appears that the suggested estimators are more efficient

An Economic Design of Rectifying Inspection Plans Based on a Correlated Variable (대용품질특성치를 이용한 계수선별형 샘플링 검사방식의 경제적 설계)

  • Bai, D.S.;Lee, K.T.;Choi, I.S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.793-802
    • /
    • 1997
  • A sampling plan is presented for situations where sampling inspection is based on the quality characteristic of interest and items in rejected lots are screened based on a correlated variable. A cost model is constructed which involves the costs of misclassification errors, sampling and screening inspections. A method of finding optimal values of sample size, acceptance number and cutoff value on the correlated variable is presented, and numerical studies are given.

  • PDF

Properties of variable sampling interval control charts

  • Chang, Duk-Joon;Heo, Sun-Yeong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.4
    • /
    • pp.819-829
    • /
    • 2010
  • Properties of multivariate variable sampling interval (VSI) Shewhart and CUSUM charts for monitoring mean vector of related quality variables are investigated. To evaluate average time to signal (ATS) and average number of switches (ANSW) of the proposed charts, Markov chain approaches and simulations are applied. Performances of the proposed charts are also investigated both when the process is in-control and when it is out-of-control.

Ratio Cum Regression Estimator for Estimating a Population Mean with a Sub Sampling of Non Respondents

  • Kumar, Sunil
    • Communications for Statistical Applications and Methods
    • /
    • v.19 no.5
    • /
    • pp.663-671
    • /
    • 2012
  • In the present study, a combined ratio cum regression estimator is proposed to estimate the population mean of the study variable in the presence of a non-response using an auxiliary variable under double sampling. The expressions of bias and mean squared error(MSE) based on the proposed estimator is derived under double (or two stage) sampling to the first degree of approximation. Some estimators are also derived from the proposed class by allocating the suitable values of constants used. A comparison of the proposed estimator with the usual unbiased estimator and other derived estimators is carried out. An empirical study is carried out to demonstrate the performance of the suggested estimator and of others; it is endow that the empirical results backing the theoretical study.

Variance estimation for distribution rate in stratified cluster sampling with missing values

  • Heo, Sunyeong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.28 no.2
    • /
    • pp.443-449
    • /
    • 2017
  • Estimation of population proportion like the distribution rate of LED TV and the prevalence of a disease are often estimated based on survey sample data. Population proportion is generally considered as a special form of population mean. In complex sampling like stratified multistage sampling with unequal probability sampling, the denominator of mean may be random variable and it is estimated like ratio estimator. In this research, we examined the estimation of distribution rate based on stratified multistage sampling, and determined some numerical outcomes using stratified random sample data with about 25% of missing observations. In the data used for this research, the survey weight was determined by deterministic way. So, the weights are not random variable, and the population distribution rate and its variance estimator can be estimated like population mean estimation. When the weights are not random variable, if one estimates the variance of proportion estimator using ratio method, then the variances may be inflated. Therefore, in estimating variance for population proportion, we need to examine the structure of data and survey design before making any decision for estimation methods.

Development of Integrated Variable Sampling Interval EngineeringProcess Control & Statistical Process Control System (가변 샘플링간격 EPC/SPC 결합시스템의 개발)

  • Lee, Sung-Jae;Seo, Sun-Keun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.3
    • /
    • pp.210-218
    • /
    • 2006
  • Traditional statistical process control (SPC) applied to discrete part industry in the form of control charts can look for and eliminate assignable causes by process monitoring. On the other hand, engineering process control (EPC) applied to the process industry in the form of feedback control can maintain the process output on the target by continual adjustment of input variable. This study presents controlling and monitoring rules adopted by variable sampling interval (VSI) to change sampling intervals in a predetermined fashion on the predicted process levels under integrated EPC and SPC systems. Twelve rules classified by EPC schemes(MMSE, constrained PI, bounded or deadband adjustment policy) and type of sampling interval combined with EWMA chart of SPC are proposed under IMA (1,1) disturbance model and zero-order (responsive) dynamic system. Properties of twelve control rules under three patterns of process change (sudden shift, drift and random shift) are evaluated and discussed through simulation and control rules for integrated VSI EPC and SPC systems are recommended.