• Title/Summary/Keyword: Ship ERP

Search Result 10, Processing Time 0.02 seconds

A Design and Implementation of a Web-based Ship ERP(SHERP) (웹기반 선박용 ERP (SHERP) 설계 및 구현)

  • Kim, Sang-Rak;Bae, Jae-Hak J.
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.6B
    • /
    • pp.710-719
    • /
    • 2011
  • Shipping companies have become interested in the development of strategic ship assets management systems which are implemented for high competitiveness and business rationalization to meet the tough business environment of high oil prices and decrease in cargo. In this paper we introduce a ship assets management system that is suitable for the SAN(Ship Area Network) environment. This system is designed to execute business strategy of ship owners giving consideration to requirements of shipping stakeholders. In addition we have implemented it in a web-based ERP system (SHERP) which separates user interface and business logic. The SHERP is based on STEP and PLIB, which are international standards for data exchange of mechanical devices and parts. It also adopts a ship ontology to manage the ship information and knowledge during its life-cycle. The SHERP will be a concrete example of servitization of shipbuilding, as an information system which is used in ships and ship groups.

Development of Monitoring System for Hull Construction Processes Using TOC Analysis (제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발)

  • Yun, Hoon-Hee;Sheen, Dong-Mok
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.3
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.

A Functional Review and Prototype for Ship PDM implementation (조선 PDM구축을 위한 기능 연구 및 시험 구현 사례)

  • Lee, Jang-Hyun;Kim, Yong-Gyun;Oh, Dae-Kyun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.6 s.144
    • /
    • pp.686-697
    • /
    • 2005
  • The current challenge with which most shipyards are faced is to reduce the design time and the time-to-delivery benefits of new information technologies such as ERP, APS, and SCM system. These technologies should integrate the information that flows in the enterprise wide activities. First of all we should maintain control of ship design and product data such as bill of material, product structure, drawing, 30 modeling and manufacturing information for the integration. The product data management (POM) system copes with these requirements. All the product data is stored in POM database and vaults in a structured manner and all the changes of product data are monitored, controlled and recorded. This study discusses how POM system can be implemented in shipyard. The procedure is surveyed to apply a POM system for the ship design data management. This study also presents several examples in order to make a practical guidance for ship POM implementation. Proposed studies can be useful for shipyards planning to adopt POM systems in enterprise wide manner.

Development of PLM Prototype for Conceptual Design of Marine Vessels (선박의 초기설계 제품정보관리를 위한 PLM 시스템 원형 개발)

  • Lee, Chan-Woo;Lee, Jang-Hyun;Lee, Kyung-Ho;Lee, Jae-Beom;Kim, Dae-Seok;Seo, Heung-Won
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.543-553
    • /
    • 2008
  • Shipbuilding is a kind of ETO(Engineering To Order) industry which designs and produces a product in accordance to various requirement of customers, rules and regulations. Recently, the number of ordered ships has been increased by up to two or three times in each domestic shipyards. Most shipyards have been adopted 3D ship CAD, ERP(Enterprise Resource Planning) and APS(Advanced Planning System) to get an efficient product development and manufacturing system. However, not only the effective operation of 3D ship CAD, ERP and APS but also the production efficiency can be achieved only if product information management which can manages the product data is implemented in an integrated environment. Present study has suggested a systematic approach to implement a PLM system to manage the product data in early design shipbuilding. Also, a prototype of PLM is implemented to manage the product data in a basic ship-design. In the prototype system, a product structure and architecture of PLM is considered.

Barriers Causing the Value Gap between Expected and Realized Value in IS Investment: SCM/ERP/CRM (정보시스템 투자 전후 가치 격차 유발 장애요인: 탐색적 사례연구)

  • Cho, Nam-Jae;Park, Ki-Ho
    • Information Systems Review
    • /
    • v.5 no.1
    • /
    • pp.1-18
    • /
    • 2003
  • Many organizations experience that the value they gained from IT (information technology) investment is lower than they expected prior to the actual implementation of a system - the value gap between expected value and realized value from IT. Research on the barriers to the expectation and realization is of high importance both in practice and in IS research. This study analyzed such barriers observed in three companies that have adopted such IT systems as Enterprise Resource Planning (ERP), Supply Chain Management (SCM), and Customer Relationship Management (CRM) systems each. From analyses of the three companies we specifically identified eight types of barriers: barriers related to industry, organization, knowledge, resource, usage, competence, product, and safety. Common barriers among the three cases were classified into six types, e.g. lack of strategic mind-set, improper organizational structure, lack of human resource, etc. We expect that the results help managers in IS investment to minimize the valuation gap and maximize realized values.

Implementation of PLM Functional and Architecture between ETO Shipbuilding and ATO Industries (주문형 설계 조선산업과 주문형 조립산업의 특성에 따른 PLM 기능과 구조 설계)

  • Kim, Seung-Hyun;Jeon, Jung-Ik;Lee, Jang-Hyun;Lee, Won-Joon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.6
    • /
    • pp.425-439
    • /
    • 2010
  • The current challenge with which most shipyards are forced is to reduce the design time and the time-to-delivery because of explosive order of shipbuilding. Collaborative design and product data management have become important to reduce the lead time. Furthermore, enterprise information technologies such as ERP (Enterprise Resource Planning), SCM (Supply Chain management), and APS (Advanced Planning System) requires the collaborative environment. Also, manufacturing environment has been considered as a topic of strategic interest to get shorter product lifecycles in shipyards. Most shipyards have chosen an environment of ETO (Engineering To Order) strategy which designs and produces new products in response to various requirements of customer, rules and regulations. In the ATO (Assemble 10 Order) environment, most component parts have been designed to be procured or produced on the order requirement. The basic distinction between the ETO and ATO is the timing of the design. Thus in the ATO environment, it is more flexible in reducing the lead time to meet the specified requirements of customers. However, the ETO strategy requires new ship design process and ship product structures that are linked with the implementation of PLM. And, the function and architecture of current PLM solution has been designed based upon ATO environment properly. This paper presents the PLM architecture which effectively reflects the characteristics of shipbuilding. 4-layer architecture model is suggested to implement the PLM system. Also, implemented functions of ship PLM is explained in order to make a practical guidance for ship PLM implementation.

Development of Data Mining System for Ship Design using Combined Genetic Programming with Self Organizing Map (유전적 프로그래밍과 SOM을 결합한 개선된 선박 설계용 데이터 마이닝 시스템 개발)

  • Lee, Kyung-Ho;Park, Jong-Hoon;Han, Young-Soo;Choi, Si-Young
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.382-389
    • /
    • 2009
  • Recently, knowledge management has been required in companies as a tool of competitiveness. Companies have constructed Enterprise Resource Planning(ERP) system in order to manage huge knowledge. But, it is not easy to formalize knowledge in organization. We focused on data mining system by genetic programming(GP). Data mining system by genetic programming can be useful tools to derive and extract the necessary information and knowledge from the huge accumulated data. However when we don't have enough amounts of data to perform the learning process of genetic programming, we have to reduce input parameter(s) or increase number of learning or training data. In this study, an enhanced data mining method combining Genetic Programming with Self organizing map, that reduces the number of input parameters, is suggested. Experiment results through a prototype implementation are also discussed.

A Study on the Welding Amount Estimation System combined with 3D CAD Tool (3차원 CAD 통합형 용접물량 산출 시스템에 관한 연구)

  • Ruy, Won-Sun;Kim, Ho-Kyeong;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.7
    • /
    • pp.3184-3190
    • /
    • 2013
  • These days, the great part of design processes in the field of ship or offshore manufacturing are planed and implemented using the customized CAD system for each ship-building companies. It means that all information for design and production could be extracted and reused at the useful other area cost considerable time and efforts. The representative example is the estimation of welding length and material amount which is demanded during the construction of ship or offshore structures. The proper estimation of welding material to be used and the usage of them at the stage of schedule planning is mostly important to achieve the seamless process of production and expect the costing in advance. This study is related to the calculation of welding length and needed material amount at the stage of design complete utilizing the CAD system. The calculated amount are classified according to welding position, stage, block, bevel and welding type. Moreover it is possible to predict the working time for welding operation and could be used efficiently for the cost management using the results of this research.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.