1 |
Lee, J.M., Jeong, Y.K., Woo, J.H., 2018. "Development of an evaluation framework of production planning for the shipbuilding industry." international journal of computer integrated manufacturing 31, no, 9, 831-847.
DOI
|
2 |
Woo, J.H., Kim, Y., Jeong, Y.-K., Shin, J.-G., 2017. "A research on simulation framework for the advancement of supplying management competency. Journal of Ship Production and Design 33 (1), 60-79.
DOI
|
3 |
Park, J., Kim, Y., Lee, K., 2008. Oocbd based process management system design for engineering collaboration. In: Paper Presented at the Proceedings of the Korean Society of Precision Engineering Conference.
|
4 |
Porter, M.E., 2011. Competitive advantage of nations: creating and sustaining superior performance. simon and schuster.
|
5 |
Ennis, K.J., Dougherty, J.J., Lamb, T., Greenwell, C., Zimmermann, R., 1998. "Product-Oriented design and construction cost model. J. Ship Prod. 14 (1), 41-58.
|
6 |
Matoba, H., Enomoto, M., Watanabe, M., Tsukishima, T., 1995. "Production planning system.". Google Patents.
|
7 |
Okayama, Y., Chirillo, L., 1980. Product work breakdown structure. MARITIME ADMINISTRATION WASHINGTON DC.
|
8 |
Park, C., Chung, K.H., Park, J.C., Cho, K.K., Baek, T.H., Son, E.I., 2002. "A spatial scheduling application at the block paint shop in shipbuilding: the hypos project. Prod. Plann. Contr. 13 (4), 342-354.
DOI
|
9 |
Woo, J.H., Oh, D., 2018. Development of simulation framework for shipbuilding. Int. J. Comput. Integrated Manuf. 31 (2), 210-227.
DOI
|
10 |
Zhuo, L., Chua Kim Huat, D., Wee, K.H., 2012. "Scheduling dynamic block Assembly in shipbuilding through hybrid simulation and spatial optimisation. Int. J. Prod. Res. 50 (20), 5986-6004.
DOI
|
11 |
Ishibashi, H., Takizawa, N., Nakagome, C., Tateishi, J., 2010. "Production planning method and production planning system.". Google Patents.
|
12 |
Lee, J.K., Lee, K.J., Park, H.K., Hong, J.S., Lee, J.S., 1997. "Developing scheduling systems for Daewoo shipbuilding: das project." European journal of operational research 97, no, 2, 380-395.
DOI
|
13 |
Joseph, O., 1975. Material requirements planning. McGraw-Hill, New York [etc.].
|
14 |
Koenig, P.C., MacDonald, P.L., Lamb, T., Dougherty, J.J., 1997. The national shipbuilding research program. 1997 ship production symposium, paper number 16: towards a generic product-oriented work breakdown structure for shipbuilding. DAVID TAYLOR MODEL BASIN WASHINGTON DC.
|
15 |
Kruchten, P.B., 1995. The 4+ 1 view model of architecture. IEEE software 12 (6), 42-50.
DOI
|
16 |
Leopold, R., 1975. "Gas turbines in the us Navy: analysis of an innovation and its future prospects as viewed by a ship designer." naval engineers journal 87, no, 2, 98-108.
DOI
|
17 |
Park, K., Lee, K., Park, S., Kim, S., 1996. "Modeling and solving the spatial block scheduling problem in a shipbuilding company. Comput. Ind. Eng. 30 (3), 357-364.
DOI
|
18 |
Ryu, C., Shin, J.G., Kwon, O.H., Lee, J.M., 2008. "Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding. Int. J. Comput. Integrated Manuf. 21 (8), 911-922.
DOI
|
19 |
Tamaki, K., Enomoto, M., Tateishi, J., Arai, Y., Kato, Y., 2001. "Production planning system.". Google Patents.
|
20 |
Gorton, I., Liu, A., 2005. An Architects guide to enterprise application integration with J2ee and. Net. In: Paper Presented at the Proceedings of the 27th International Conference on Software Engineering.
|
21 |
Cho, K., Chung, K., Park, C., Park, J., Kim, H., 2001. A spatial scheduling system for block painting process in shipbuilding. CIRP Annals 50 (1), 339-342.
DOI
|
22 |
Beeri, C., Bernstein, P.A., Goodman, N., 1989. A sophisticate's introduction to database normalization theory. In: Readings in Artificial Intelligence and Databases. Elsevier, pp. 468-479.
|
23 |
Bititci, U.S., Carrie, A.S., 2013. Strategic management of the manufacturing value chain: proceedings of the international conference of the manufacturing valuechain august '98, troon, scotland, UK, 2. Springer.
|
24 |
Chaudron, M., Larsson, S., Crnkovic, I., 2005. Component-based development process and component lifecycle. J. Comput. Inf. Technol. 13 (4), 321-327.
DOI
|
25 |
Nam, S., Shen, H., Ryu, C., Shin, J.G., 2018. "Scp-Matrix based shipyard aps design: application to long-term production plan." international journal of naval architecture and Ocean engineering 10, no, 6, 741-761.
DOI
|
26 |
Kettinger, W.J., Teng, J.T., Guha, S., 1997. "Business process change: a study of methodologies, techniques, and tools. MIS Q. 55-80.
|
27 |
Lee, J.K., Lee, K.J., Hong, J.S., Kim, W., Kim, E.Y., Choi, S.Y., Kim, H.D., Yang, O.R., Choi, H.R., 1995. Das: intelligent scheduling systems for shipbuilding. AI Mag. 16 (4), 78-78.
|
28 |
Lee, Y.G., Ju, S., Woo, J.H., 2020. "Simulation-Based planning system for shipbuilding." international journal of computer integrated manufacturing, pp. 1-16.
|
29 |
Choi, H.S., Park, K.H., 1997. "Shop-Floor scheduling at shipbuilding yards using the multiple intelligent agent system. J. Intell. Manuf. 8 (6), 505-515.
DOI
|
30 |
Andersen, B., 2007. Business process improvement toolbox. Quality Press.
|
31 |
Hopp, W.J., Spearman, M.L., 2004. To pull or not to pull: what is the question?". Manuf. Serv. Oper. Manag. 6 (2), 133-148.
DOI
|
32 |
Umble, E.J., Haft, R.R., Umble, M.M., 2003. "Enterprise resource planning: implementation procedures and critical success factors. Eur. J. Oper. Res. 146 (2), 241-257.
DOI
|
33 |
Roh, M.I., Lee, K.Y., 2007. "Generation of production material information for a building block and simulation of block erection for process planning and scheduling in shipbuilding. Int. J. Prod. Res. 45 (20), 4653-4683.
DOI
|