Browse > Article
http://dx.doi.org/10.21289/KSIC.2022.25.1.79

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System  

Kim, Young-Hun (Dept. of Naval Architecture & Ocean System Engineering, Kyungnam University)
Hong, Min-Jong (Dept. of Mechanical Convergence Engineering, Kyungnam University)
Baek, Seung-Ju (Dept. of Mechanical Convergence Engineering, Kyungnam University)
Lee, Won-Seok (Dept. of Mechatronics Engineering, Kyungnam University)
Jo, Yong-Hwa (Dept. of Information & Communication Engineering, Kyungnam University)
Lee, Dae-Hyung (Dept. of Naval Architecture & Ocean System Engineering, Kyungnam University)
Lee, Hoon-Sick (HanShin Information CO. Ltd.)
Na, Sung-Tae (Human Heavey Industries Co.,Ltd.)
Publication Information
Journal of the Korean Society of Industry Convergence / v.25, no.1, 2022 , pp. 79-86 More about this Journal
Abstract
In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.
Keywords
Advanced Planning and Scheduling; Business Plan; Master plan; Small-sized shipyard; Simulation;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 D. Kang, J. JU, J. Lee, "Process Data Integration system for the Efficient Production Process Management," Proc. of Institute of Control, Robotics and Systems, pp. 131-135, (1994).
2 Y.Kim, D.Lee, "A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process", Journal of the Society of Naval Architects of Korea, vol.44, no.1, pp048-054, (2007).   DOI
3 J.M.Lee, "An integrated process and measurement framework for planning production of large shipyards", Ph.D Thesis. Seoul National University. (2007).
4 K.Lee, "Strategy Planning of Digital Shipbuilding Simulation by Work flow Analysis of Production Planning in a Shipyard", Journal of the Korea Institute of Information and Communication Engineering, vol.17, no.8, pp1761-1768, (2013).   DOI
5 D. Lee, D. Oh, "A Study on Simulation based Manufacturing in Shipyards: Focused on a Long-term Plan Verification", Journal of the Korean Society of Marine Environment & Safety, vol.20, no.1, pp086-095,(2014).   DOI